Loading...
DFW Trade JV-CS 970424~17 ~ 0~6~ Apr-22~-97 12:26P GraF ine Public Works 81 181 0369 P.01 GRAPEVINE ~r. Robc~ Marshal ~ G~win ~ M~shall, Inc. ~1 B~dge Strut, Suite 1~ Fo~ Womb, TX 76112 ~ ' ~ Fax (817) 446-3l 16 Re: Review of the Co~l~lion Pla~ for Patriot Drive (R~eiv~ 0.3t31/97) Dear Mr. Marshall: The, City has rcvicwed your initial construction plans submittal for the abovc referenced project. The staff comments are attached. When thc necessary revisions have been madc please submit the following: 1. One (1) set of revised construction plans for final review. If you have any questions concerning the above commems, do not hcsitaie to call Sincerely, Mark C. Fredricks Graduate Engineer cc: Construction File Mr. Doug Johnson, IDI Texas District Office, 5a20 LBI Freeway, Suite 1275, Dallas, TX 75240 John Robertson, Drainage Coordinator Ken Griffin, City of Coppell, Fax: (972) 304-3570 Apr-24-,g7 ~2:26P Grape --q~ Public Works 817ql 0369 P.02 Construction Plans Patriot Drive April 23, 1997 GENERAL COMMENTS * The final plat of Lot 1, I~ot 2, and Tract A, Block 4, DFW Trade Center will need to be submitted to our office prior to tim Release for Construction of these plans. Our City Attorney has informed us that this plat will need to be filext in Denton County as well as Dallas County. Please submit the following items pertaining to this plat: I. One (1) 18" x 24" mylar copy (for Denton County) 2. Three (3) 18" x 24" b}uelinc copies (for Denton County) 3. Three (3) 24" x 36" mylar copics and three (3) 24" x 36" blucline copies (or as needed ft~r Dallas County, City ~f Grapevine, City of Coppcll, and your records). 4. The check for the l)enton County filing tee of $52.00 ($26.00 per page for two pages). It is our understanding that your office will file the plat in Dallas County. Our o~'l~cc will filc the plat in Denton County, Note: Denton County plats require ihe following information: 1. Cabinet, Slide, and Date for filing informatmn. 2. Names must be printed (lyped) under all signatures. * Revise the median modifications per thc discussion with Seen l)ycr on April 1997. SHEET I I, DRAINAGE CRITERIA * Provide Inlet capacity calculations * Provide street capacity calculations, documenting that right-ol~-way is not exceeded by flow depth during the 100-year storm event IfR O.W. is exceeded, additional inlets may be needed. * Change area designations in hydraulic calculations to match current designations Linc "B" tributary areas are no longer A-13~ A-20, etc.. * For laterals calculations, include losses associated with the pipe entrance at the inlet This may be accomplished using the equation h = 1.25V/(2g) where h is the head loss and V is the velocity in the pipe. None of the laterals account ['or this loss. * Upstream Hydraulic Gradient Elevations for Line "A" and "C' will not be 0 (zero). Recalculate and change any needed profiles. Apr-2~-g7'12:26P Grapr~ine Public Works 81-k481 0369 P.03 Constcuctlon Plans Patriot Drive April 23, 1997 SIIEET 12, TEMPORARY DRAINAGE CHANNEL * Show temporary measures tbr all stubs including those em Linc "C" SHEET t4, STORM DILa~IN I.INE "B" * Use 100-year water surface elevation from Denton Creek for Hydraulic Grade Line (HGL) at outlet of Line "B" Provide notes stating where water surface elevation is from and use for calculations on Sheet l 1 SHEET 16, STORM I)KAIN I,INE "C" * Use 100-year wate~ sur~hce elevation from Denton Cr~:ck tbr Hydraulic Grade Line (14GL) at outlet of Linc"C" ['mvidc notes .stating where water surface elevation is from and use fbr calculations on Sheet I 1. SHEET 17, STORM DRAIN LATERAL PROFII,ES * Ltpdme lateral tlGI. from changes in calculations 0 \pilanrvw\plata~gT',Ap~7~P~l~'~- Rv2