Loading...
PA0101-LR010706'~CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite//100 Report Number: 94011093.0014 Dallas, Texas 75247 Service Date: June 26, 2001 (214) 63O-lOlO Client: City of Coppell - Parks & Recreation Report July 06, Attn: Brad Reid Proj( ~rew Brown Park st 732 DeForest Moore Road Coppell TX 75019 Coppell, Texas ;ct Number: 940' Material Information Specified Strength: 3000 psi @ 28 Days Sam Date Cast: June 26, 2001 Technician: Marvin Arandia Batch Time: 6:28am Plant: 41 Weather Conditions: Clear Supplier: TXI Accumulative Yards: 10 Truck No: 67 Ticket No: 2923877 Placement Method: Direct discharge Mix I.D. No.: 8272 Sample Locations: See attached sketch Placement Location: Sidewalk, NW side of jobsite by the lake Field Test Data Test Result Specification Test Method Slump, inches: 7.75 3-5 ASTM C-143 Air Content, %: ASTM C-172 Concrete Temperature,O F: 86 ASTM C-39 Ambient Temperature, o F: 75 Plastic Unit Weight, pcf: Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Date Test Load Strength No. ID (inches) Tested (days) (lbs) (psi) I 1 6.00 07/03/2001 7 81,800 2,890 1 2 6.00 07/03/2001 7 83,110 2,940 Average 2,920 1 3 07/24/2001 28 I 4 07/24/2001 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Marvin Arandia Report Distribution: ~eering,' Inc. (1) City of Coppell - Parks & Recreation Reviewed by: (1) TLB Construction Eric J~. Cleveland, P.E. (1) City of Coppell - Constr. Insp. Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 REPORT OF REINFORCING STEEL OBSERVATION 8901 Carpenter Fr, vy.. Suite #100 Dallas. Texas 75247 Date of Service: 07/06/01 Report No.: 9401~1~~ Client No.: COPPEL Project N~r401 ~ Client: City of Coppell - Parks & RecreatiOncoppel],732 DeForeStTx 75019 Prlct: ~~~~East Services: Observe placement of reinforcing for compliance with furn~s. PROJECT DATA Drawings Utilized: Superintendent's approved drawings Locations/Items Observed: Plaza Area between Softball Fields located on E side of Park, see attached sketch Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X ;olumn Tied Properly Rat Size X Proper Bar Placement X ties and Spaces Bar Grade X Propedy Tied X stirrup Spacing/Type Rebar Clean X Dowel Bars in Place X ~Velded Splices Form Clean X Proper Bar Supports X ¥1echanical Splices Number of Bars X Lapped Splices X Proper Cover Discrepancies/Comments: No discrepancies noted at the time of observation. Technician: E. Oarcia Renort Distribution: g~ Inc. (1) City of Cop~ll - P~ & Recreation (1) TLB Cons~uction (1) City of Cop~ll - Cons~. lnsp. ' Cleveland, P. E. Senior Project Engin~r 309sks This re~d is exclusively for the use of the client indicted above and shall not ~ repr~u~d without ~itten approval of HBC Engineering, Inc. REPORT OF REINFORCING STEEL OBSERVATION 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/26/01 Report No.: 94011093.0027 Client No.: COPPEL Project No Client: Cit, - Parks & Rec~ ation ~w Browt ~rk East DeForest Moore )ppell, TX 75019 Coppell, :as Services: ve[ reinforcing for compliance with gs. PROJECT DATA Drawings Utilized: /i~ Locations/Items Observed: Sidewalks, see attached sketch ~" ~ Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X C. olumn Tied Propedy Bar Size X Proper Bar Placement X Ties and Spaces Bar Grade X Propedy Tied X stirrup Spacing/Type =lebar Clean X Dowel Bars in Place X Welded Splices :erin Clean X ~roper Bar Supports X Mechanical Splices Number of Bars X _apped Splices X Proper Cover Discrepancies/Comments: No discrepancies noted at the time of observation. Technician: A. Garcia Report Distribution: (1) City of Coppell - Parks & Recreation ( 1 ) TLB Construction (1) City of Coppell - Constr. lnsp. Eric J. Cleveland, P. E. Senior Project Engineer 309sks This repel1 is exclusively for the use of the client indicated above and shall not be reproduced without wdtlen approval of HBC Engineering, Inc. · CONCRETE COMPRESSIVE STRENGTH TEST ENGINEERING, 1NC. Re port,,,~:,~, ;. ~,~u,: ..~._~~'~,,~~ a~~~ 8901Dallas,CarpenterTexas 75247Frwy" Suite ,100 Servi(~ Date: JuJyi~iE 2OOl J (214) 630-1010 i~n Project:,~nd~w Brown Pa~East Client: 't~ Coppell - Parks & Re on Report D Attn: ~,,..J P"~d 732 DeForest ~' Moore Road Project ~ber~11093 Material Information Sample Information Specified Strength: 3000 psi @ 28 Days SampLe Time: 9:08am Date Cast:,July 6, 2001 Technician: Eric Garda Batch Time: 7:54am Plant: 31 Weather Conditions: Partly cloudy, sunny Supplier: TXl Accumulative Yards: 70 Truck No: 737 Ticket No: 2931097 Placement Method: Pump Mix I.D. No.: 8272 Sample Locations: See placement location Placement Location: Paying on plaza area between softball fields on E side of park (See attached sketch) Field Test Data Test Result Specification Test Method Slump, inches: 4.00 3-5 ASTM C-143 Air Content, %: 3-6 Concrete Temperature,o F: 89 ASTM C-1064 Ambient Temperature, 0 F: 81 ASTM C-1064 Plastic Unit Weight, pcf: Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) Tested (days) (lbs) (psi) 1 1 6.00 28.27 07/13/2001 7 72,820 2,570 1 2 6.00 28.27 07/13/2001 7 77,950 2,760 ~verage ~ 1 3 6.00 28.27 08/03/2001 92,460 I 4 6.00 28.27 08/03/2001 95,430 Average 3,320 Services - Obtain samples of fresh concrete at the placement locations, perform required field compressive strength samples. ASTM C-31, C-39, C-172, C-1231 Technician: Eric Garcia ~ 1~~ ~t~t) ~4~1~ 0 ~r~ J Report Distribution: Inc. (1) City of Coppell - Parks & Recreation Reviewed by (1) TLB Construction (1) City of Coppell- Constr. Insp. Eric J. Cleveland, P.E. Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 o, LLW~I;~O1-F~t~'e Key