CRDC 1402-CN1502184^ tn CITY OF COPPELL tongue nail & potkins v, .Inpinccorn CONSULTING ENGINEER'S CONTRACT MODIFICATION TO THE SCOPE OF SERVICES WOODRIDGE CHANNEL IMPROVEMENTS TNP PROJECT CPL 14136 AMENDMENT #1 I. Scope of Work Additional Design for Box Culvert under MacArthur The ENGINEER shall provide professional civil engineering services, as outlined below, for adding an additional 6x6 box under MacArthur Drive including headwall and storm drain modifications both upstream and downstream. In addition to design the box, Subsurface Utility Engineering will also be provided to locate potential underground utility conflicts. This modification is for additional services associated with the existing contract. The following are anticipated additions to the scope of work: • Additional meetings and correspondence with City representatives. • Additional design Plan and Profile sheet of the proposed box under MacArthur Drive along with specific structural detail sheets for upstream and downstream connections. Final plans and bid documents will allow for both an open cut and pipe jacking option. • Subsurface utility locates to determine the potential for underground conflicts. Quality Level B is based on a fixed fee amount and will be used to locate utilities in the proposed box area. Quality Level A is based on an hourly reimbursable amount and will only be used where specific utilities need to be exposed using vacuum excavation techniques. II. Schedule The ENGINEER proposes the following schedule to accommodate ongoing design activities: • Continue with Design in an effort to meet an end of March advertisement date. engineer surveyors landscape architects Fort Worth - 1100 Macon Street- Fort Worth, Texas 76102A 817.336.5773 Dallas v17304 Preston Road, Suite 1340+ Dallas, Texas 75252 � 214.461.9867 Denton - 1517 Centre Place Drive, Suite 320- Denton, Texas 76205- 940.383.4177 Sherman- 200 North Travis Street, Suite 500 Sherman, Texas 75090-903.870.1089 III. Compensation The Engineer's contract shall be amended to include the following: AGREED: THE CITY OF COPPELL By: Date: l/ AGREED /ACCEPTED: TEAGUE ALL AND PERKINS, INC. hv-�/B: Date: -Lb os Attest: Attest: \.,A �,, I 11 V � Original Amended Total Revised Contract Amt. Amt. Contract Amt. BASIC SERVICES Task 1 Analysis and Design $ 83,000 $ 19,850 $ 102,850 Task 2 Survey $ 15,800 $ — $ 15,800 Task 2.1 Level B SUE $ — $ 7,650 $ 7,650 Task 2.2 Level A SUE (Hourly Budget) $ — $ 8,815 $ 8,815 Task 3 Construction Phase Services $ 21,000 $ — $ 21,000 SPECIAL SERVICES Task 4 Landscape and Park Design $ 15,000 $ — $ 15,000 Task 5 Environmental Permit $ 16.200 $ $ 16.200 TOTAL BASIC + SPECIAL SERVICES $ 151,000 $ 36,315 $ 187,315 ADDITIONAL SERVICES Task 6 Con /Span Str. Design (Budget) $ 7,500 $ (7,500) $ — Task 7 Misc. Channel Survey /Design (Budget) $ 25.000 $ (20.000) $ 5,000 TOTAL ADDITIONAL SERVICES $ 32.500 $ (27.5001 $ 5;000 PROJECT TOTALS $ 182,500 $ 8,815 $ 192,315 AGREED: THE CITY OF COPPELL By: Date: l/ AGREED /ACCEPTED: TEAGUE ALL AND PERKINS, INC. hv-�/B: Date: -Lb os Attest: Attest: \.,A �,, I 11 V �