PA0101-LR010626 07/13/2801 11:37 8i746i8836 SIERRA CONTRACTORS PAGE 82
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client: Miller Sierra Construction Work Order Number: 4657
PrOject: 01-026 Andy Brown Communi~ Park Repo~ Number: 01-026.115
SPECIFICATIONS PROJECT DATA
$tmngffi (p~i): 3000 PSi ~ 28 Da~ !Oa~ ~ Pla~ment: 6~001
Air C~tent(%): NA 'Wearer: :Sunny & Wa~
Concr~ Tamp(F): ~t to ex~ 95' "$Upplier~Ix: Hanson
I I
FIELD DATA ~ET ~ 1
Ticket e: 863169 ;Time Betch~:
Slump (in,): 4 Air Content: : NA Un~ Weight (pg~: NA
Concrete Tamp(F): g4 ,Air Tamp (F): 85' Ya~age: 10
Locatio~tRema~ks; N. S~e of Shu~l 8oa~s
SET CYL DATE ~ ~ LOAD ~RENGT~ TEST CYLINDER NOTES
~ ~ 7/~00~ I 76000
1 ~ 7t24/2001 ~
1 3 7~4/2001 28
I 4 ~21 t2001 56
NORMAL CYLINDER $1'ZE 6X12. AREA ;Z$ Z7eq. I~ UNLESS NOTIED HERE: TYPE "A" CONE FRACTURE UNLE~ INDICATED OTHERWISE IN MOTE~ TE~T RESU~T~ COMPLY
WITH PROJECT ~ECI;ICATI~3 UNLESS iNDICATED 'NON-C~LIANCE" IN NOTES FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, [NC ARE PER
~PLICABLE ASTM STANDARDS: Ct38 C143, C172. C23~ CYLIN~RS ~LDED ANo CURED BY SOlLT~CH ENGINEERING AND TESTING INC AR~ PER ASTM C31 TESTE0
S ILTECH AND TESTING, INC.
~mes M. Perdue
~eneral Manager
2502 Gravel Drive., Fort Worth, Texas 76118 - 817.595 0064 telephone · 817.5t~9.7279 metro, 817.595.0708 fax