PA0101-LR010612 CONCRETE INSPECTION AND COMPRESSION TEST REPORT
Client: Miller Sierra Construction Work Order Number: 4593
Project: 01-026 Andy Brown Community Park Report Numl3er: 01-026 111
SPECIFICATIONS PROJI:CT D&TA
Strength (pSi}: 13000 PSi ~ 28 Day* Date of Placement: 611212001
Air Content(%}: NA' We&thee: Sunny & Warm
Conorete Tamp(F): ;Not to exoeed 95' ' ISupplier/Mix:
FIELD DATA SET # 1
Tibet #: NA Time Batched'. Time Sampled:
Slum~ (in.): NA iAi~ con~nti
NA Unit Weight (pCf); NA
Cancrete TemP(~)i' NA i^,r Temp (F): ' ' NA Y.rdage: 0
i_°Catlon/RemerKe: 'S. ~ide of Pool Faality
SET CYL.~ DATE: AGE MAX L~ STRENGTHi ' TEST CYLINDER NOTES
NO., NO. TESTED (day,) : (lbs) (psi) RESULT SOURCE
1 1 6/2e/200~ ? ' 63000 2230
I 3 7117/2001 28
II I I
NORM&~. CYLINDER SIZE: 6X12 AREA:262Taq. in. UNLESB NOTED HERE: TYPE "A"GONE F~CTURE UNLESS INDICATED O~ERWISE IN NOTES TEBT ~$ULT8 CO~Y
WITH PROJECT SPECtFICATION8 ~ESS I~ATED "N~-COMPL~NCE" ~ ~TES. FIELO ~S BY $OI[TECH ENG~EERING AND TESTIS, INC. AR~ PER
APPMC~LE ~TM STUD--S: Cl~a, C143, C17Z C231. CYLIN~RS MOL~D ~D CURED BY ~ILTECH E~INEERING ~D TESTIS, INC ARE ~R AE~ C31. TESTEO
neml Manager
2502 Gravel Delve · Fort Worth, Texas 7611 ii · 817,595 0064 telephone · 817,589.7279 metro. 817595.0708 fax