hltprol~rly designed m~d/or constructed portland tenlent concrete pavement joinB are a common reason for pavement digits.
Design and construction should include the following:
* Joiut depth should be equal Io t~ of ~e pavement thickness.
, Hand-form~ joints should have a maximum edge radius of ~A inch.
, Sawing of .joints should begin as soon as the concreW has hardened sufficientty to p~nit sawi~ wi~out excessive
ravelling. All joints should be complcl~ before uncontroll~ shrinhge cracking occurs.
"Joints should be continuous across the pavemenl unless interrupt=d by rufl-dcpffi p -maideft joint fiber, an~
re
extend complct~y through the curb.
, Joint openings wider that tl inch should be cleaned and sealed before o~ning pavement are8 to
, Expansion .joints or isolation joh~ should 1~ used to isotale fixed objects abuaing or wi~in ~e pav~ ar~. T~y
should contain pre-motd~d joint filler for ~e full deplh el' fl~e slab a~d shoukl ~ s~l~ prior to op~8 to trifle.
, Utilization of an integr~ curb is r~ommendcd.
CONFil)ENTIALITy NOTICE: This facsimile contains confidential information which may also bc legally privileg~ al~ which is
iulc.ded iin' tim use of the Addres~(s) nam~ ah~vc, If you arc not ~e iulcuded r~ipient. or the employee or agent resporisibb for
delivering it to dm ilztesldt~d recipiem, you are ]l~rcby iioti~ed that any dissemination or copying of this facsimile. or dm ~king of any action in
reliance tm the contents ~f this telcoupled in~mnstion, may be sU'jctly prohibited. If you l~ave received ~i~ facsimile in error. pleas= notify a~
immediately by tcleplmne and return ll~c endre hcsimile m u~ at the ah~v¢ address via U.S. Pos~i Service.
f~'d S 3NI SIN~I~RSNOD B~U ~S:~T 966T-BT-AUW
P.O. Box 478
The City With A Beautiful Future ~ ) CoppelI, Texas75019
214-462-0022
May 13, 1996
Richard W.Gee, P.E. President
Gee Consultants Inc.
10046 Monroe Drive
Dallas, TX 75229
Ref: Village Parkway Pump Station (WA 93-02A)
This letter is written as a follow up to your February 20, 1996 proposal to the City to provide
geotechnical services for the construction of the Village Parkway Pump Station addition, your
March 12, 1996 letter to Mr. Mike Daigre of North Texas Municipal Construction Co.
concerning the testing and our April 15, 1996 telephone conversation. As you may recall, the
City has requested a letter be submitted or an acknowledgement be provided from Mr. Mike
Daigre concerning his understanding of the testing requirements and his obligation to pay for any
testing outside the scope of services provided by your fn'm.
The Village Parkway Pump Station project is proceeding and shortly testing will be required
to ensure that this project moves smoothly. I am again requesting that the acknowledgement be
provided so that we can sign your proposal so you can proceed with necessary testing. Please
provide this information as soon as possible.
If you should have any questions please feel free to contact me at your convenience.
Kenneth M. Griffm P.E.
Assistant City Manager/City Engineer
cc: file
r~IEOT!iHNiCAL " ] be] ~ %/~ ~ ~
E GEE Consultants, Inc.
EI NVIRONMENTAL
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
March 12, 1996
Mr. Mike Daigre
No,'fi~ Texas Municipal Construction Company ~ 7~'
5614 Dyer Street
Dallas, Texas 75206
RE: Coppell Ground Storage Tank
Pump Station Addition
I)car Mr. Daigre:
Confirming our discussiou of March 7, 1996, we are pleased to provide construction materials testing
services that you request for the above referenced project. The enclosed proposal addressed to the
City of Coppell briefly outlines our understanding of the services to be performed.
The fees for the various items of testing will be at unit rates; whereas, lhe inspection services,
sampling charges, etc., will be doue at the appropriate hourly rate. A schedule of these fees is
included for your file. As discussed during our telephone conversation and at the project pre-
construction meeting, services performed on over-time (Mondays to Fridays before 7:30 am and after
5:00 pro, Salurday and Sunday) are to be paid for by the contractor. Field inspection hourly rates
are charged ou a portal to portal basis. In addition, any testing performed as retests or for your
use/conveuieuce would be paid for by your firm.
Also, enclosed is a copy of our standard "Agreenxent for Materials Engineering and Related
Construction Inspection and Materials Testing Services". Please sign and rcluru (1) copy for our
files. Your signature of acceplance will confirm the agreement for the services requested.
Thank you for the opportunily of providing fi~ese services. We look forward to working with you
on tiffs project.
Sincerely,
GEE Consultants, Inc.
Richard W. Gee, P.E.
Presidenl
RWG/leg
cc: Mr. Ken Griffin - City of Coppoll
Mr. Gary Hendricks - Shimek, Jacobs & Finklea
INSPECTION AND MATERIALS TaST1NG SERVICES
THIS AGREEMENT is hy and I~etween:
herelnlfter callell CLIENT arid GEE CONSULTANTS, INC,. a 1axes corporrdgn, hereinlftet
called GEE, who agree es tatowe:
1, DECLARATtONS. CLIENT de$ir~ to engage GEE to provi~ Materials EnginelrinI ~
related construeiOn Inspectran anti mltlttilds testifi~J $t~fvice~ ifi col~flectien v~th CLII~NT'e
~rojec~ ('THE PROJECT"} described as follows:
C,~::~.dt 13eaumd b_mmmm
GEE has submitted · f¢~ schedule to CLIENT, · Copy of whiah iB eltl~rted here[o
inspection and materials tearing services. whiCh lee schedule is acceptibiS tO CLtINI',
SCOPJ QP WORK. GEE mheti i~rowd~ M~tsrmls EnQ~neermg end elated oert,ttTuctlon
inspw~1ign end maRrills ~$tin9 ~erv~cee f~r '~HE PROJECT in ~G~0~ten~e witl~ the
North Texas Municipal
CLIEN~,.~di~;t~'t, mlrj_on Cc~.meaVe ln~.
GEE C
TO BE COMPLLcTED BY CUENT:
FOR PAYMENT OF SERVICES:
Firm: ~orth Tex~e Municipal Cone~ruct~on Company, 1no.
Address: _5~_1~ Dyer St.
Dallas, TX 2~Cade: 75206 ~o,e No .... .214/368-6880
Aldentie.: Michael Daigr_e_ Tffie; ...... president
Inv~ae xo me Accou.~ ot _._YL1 lag_e.. P..ar.kway Pump sta~7~'~'_~- ..-.
FOR APPROVAl, OF INVOICEIS~:
!f ;rle inv0~,,e it tn I~e ~rlliJecl for approval to someone other then the acc~Jnt chltlml,
please indices where to mei( the invoice in t~e spec~
Firm:
Address:
Z}p Code: ....... Phone No,
Attention.. Title: _
E GEE Consultants, Inc.
EI NVIRONMENTAL
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
E X H [ B I T "A"
February 20, 1996
Mr. Ken Griffin, P.E.
City Engineer
City of'Coppell
P.O. Box 478
Coppell, Texas 75019
RE: Proposal No. 051204
Village Parkway Pump Station Addition
Coppell, Texas
Dear Mr. Griffin:
In accordance with the request of Mr Gary Hendrix of Shimek, Jacobs & Finklea of December
6, 1995, we are pleased to submit the following proposal for materials testing and inspection
services for the above referenced project. Types of services are per plans and specifications and
our telephone conversations.
We estimate the fees will be as follows:
I. UTILITIES
Laborato~ Testing
ASTM D 698 Moisture Density Relationships
1 test @ $125.00 per test ......................... $125.00
Alterberg Limits Test
1 test @ $32.00 per test .......................... $32.00
Percent Material Finer than No. 200 Sieve
1 test @ $18.00 per test .......................... $18.00
Total Laboratory Testing ......................... $175.00
City' of Coppell February 20, 1996
Field Testing
In-Place Moisture Density Tests
8 tests @ $25.00 per test (minimum of 4 tests per trip) ....... $200.00
Soil Sampling Time
2 Hrs. @ $29.75 per hour ......................... $59.50
Trip Charges
3 trips @ $12.50 per trip ......................... $37.50
Total Field Testing ............................. $297.00
Total of Earthwork Testing for Utilities ................. $472.00
II. DRILLED STRAIGHT-SHAFT PIERS
Field Inspection
Continuous Inspection of Pier Drilling and Concreting
(Including Reinforcing Steel) (Based on 4 piers per day
for pump station and 8 piers per day for screening wall)
38 Hrs. @ $29.75 per hour ...................... $1,130.50
Compressire Strength Concrete Cylinders (With Inspection)
(Based on 1 set of 4 cylinders per day)
16 tests @ $13.00 per test ......................... $208.00
Trip Charges
4 trips @ $25.00 per trip (over 4 hours) ................ $100.00
Total of Pier Inspection ........................ $1,438.50
III. SLAB-ON-GRADE CONCRETE
Laboratory_ Testing
ASTM D698 Moisture Density Relationship
2 tests @ $125.00 .............................. $250.00
Atterberg Limits Test
2 tests @ $32.00 per test ......................... $64.00
Percent Material Finer than No. 200 Sieve
2 tests @ $18.00 per test ......................... $36.00
GEE Consultants, Inc. Proposal No. 051204
Page 2
City ~of Coppell February 20, 1996
Soil Sampling Time
4 hrs @ $29.75 per hour ......................... $119.00
Trip Charges
2 trips @ $12.50 per trip ......................... $25.00
Total Laboratory Testing ......................... $494.00
Field Inspection and Testing
In-Place Moisture Density Tests
20 tests @ $25.00 per test (minimum of 4 tests per trip) ...... $500.00
Reinforcing Steel Inspection
2 Hrs. @ $29.75 per hour ......................... $59.50
Continuous Inspection of Concrete Placement
6 Hrs. @ $29.75 per hour ......................... $178.50
Compresslye Strength Concrete Cylinders (with Inspection)
(Based on 1 set of 4 cylinders per 100 C.Y.)
4 tests @ $13.00 per test ......................... $52.00
Trip Charges
1 trip @ $25.00 per trip ......................... $25.00
6 trips @ $12.50 per trip ......................... $75.00
Total of Field Testing and Inspection .................. $890.00
Total of Slab-on-Grade Concrete Inspection and Testing ..... $1,384.00
IV. MORTAR
Field Testing
Fabrication of Mortar Test Specimens
3 Hrs. @ $29.75 per hour ......................... $89.25
Mortar Compresslye Strength Tests
6 tests @ $13.00 per test ......................... $78.00
Trip Charges
1 trip @ $12.50 per trip .......... · ................ $12.50
Total of Mortar Testing .......................... $179.75
GEE Consultants, Inc. Proposal No. 051204
Page 3
City bf Coppell February 20, 1996
V. CONCRETE PAVING
Field Inspection & Testing
Reinforcing Steel Inspection
2 Hrs. @ $29.75 per hour ......................... $59.50
Continuous Inspection of Concrete Placement
8 Hrs. @ $29.75 per hour ......................... $238.00
Compresslye Strength Concrete Cylinders (with Inspection)
8 tests @ $13.00 per test ......................... $104.00
Sampling Time
2 hrs @ $29.75 per hour ......................... $59.50
Trip Charges
2 trips @ $25.00 per trip ......................... $50.00
2 trips @ $12.50 per trip ......................... $25.00
In-Place Moisture Density Tests
6 tests @ $25.00 per test (minimum 4 tests per trip) ......... $150.00
Total Field Inspection and Testing .................... $686.00
Laboratory_ Testing
ASTM D698 Moisture Density Relationships (lime treated)
1 test @ $135.00 per test .................. ....... $135.00
Atterberg Limits Test
1 test @ $32.00 per test .......................... $32.00
Total Laboratory Testing ......................... $167.00
Total Concrete Pavement Inspection and Testing ........... $853.00
TOTAL OF ALL INSPECTION AND TESTING SERVICES $4,327.25
Our total estimated fee to perform the aforementioned tests and services is $4,327.25. It should
be noted that this proposal is based on the estimated number of tests and quantities mentioned
in this proposal and not a lump sum price. The construction sequence or job conditions may
require more or fewer testing or inspection. Only work which is actually performed will be
charged for and all c~harges will be in accordance with the corresponding unit fees quoted in this
proposal or our Schedule of Fees.
GEE Consultants, Inc. Proposal No. 051204
Page 4
City 'of Coppell February 20, 1996
We understand we have been selected for this .project and, therefore, when providing this
estimate, are not in violation of laws governing procurement of professional engineering
contracts with public entities.
If this proposal is acceptable to you, please sign the enclosed copy, along with the .4greement
for Materials Engineering and Related Construction Inspection and Materials Testing Services,
and mail it to us at your earliest convenience.
We trust the information provided herein is sufficient for your use. Should you have any
comments and/or questions, please do not hesitate to contact us. We are looking forward to
working with you.
Sincerely,
GEE Consultants, Inc.
~ee('h'~ t~. Krishx;an, M.S.C.E., E.I. T.
Project Engineer President
GRK:RWG/leg
Attachment
GEE Consultants, Inc. Proposal No. 051204
Page 5
AGREEMENT FOR MATERIALS ENGINEERING AND RELATED CONSTRUCTION
INSPECTION AND MATERIALS TESTING SERVICES
THIS AGREEMENT is by and between:
Mr. Ken Griffin, P.E.
City Engineer
City of Coppell
P.O. Box 478
Coppell, Texas 75019
hereinafter called CLIENT and GEE CONSULTANTS, INC., a Texas corporation, hereinafter
called GEE, who agree as follows:
1. DECLARATIONS. CLIENT desires to engage GEE to provide Materials Engineering and
related construction inspection and materials testing services in connection with CLIENT's
project ("THE PROJECT") described as follows:
Village Parkway Pump Station Addition
Coppell, Texas
GEE has submitted a fee schedule to CLIENT, a copy of which is attached hereto and
made a part hereof as Exhibited A, for Materials Engineering and related construction
inspection and materials testing services, which fee schedule is acceptable to CLIENT.
2. SCOPE OF WORK. GEE shall provide Materials Engineering and related construction
inspection and materials testing services for THE PROJECT in accordance with the
accompanying proposal "scope of services" made a part hereof as Exhibit B and the
"terms and conditions" set forth on the back of and made a part of this Agreement.
EXECUTED THIS I, ~, day of Iv~ ~-/ ,19q__~_.
·
CLIENT 'e.~
By: ~ ' '
Title: ~_~'~f~f~v~
Title: 'Pre~ler~t' Date:
TO BE COMPLETED BY CLIENT:
FOR PAYMENT OF SERVICES:
Firm:
Address:
Zip Code: __. Phone No.
Attenti o n: Title:
Invoice to the Account of:
FOR APPROVAL OF INVOICE(S):
If the invoice is to be mailed for approval to someone other than the account charged,
please indicate where to mail the invoice in the space below.
Firm:
Address:
.Zip Code: ~ Phone No.
Attention: Title:
ARTICI..E 1. SERVICES: GEE will:
with re~ommendatinns contained in any correspondence or verbal
1. l Act for CLIENT in a professional manner, using that degree of care and recommendation issued by GEE.
skill ordinarily exercised by and consistent with the standards of the pro-
fession practicing in the same or similar locality of THE PROJECT site. 3.3 GEE is not authorized to revoke, alter, relax, enlarge or release any re-
quirement of THE PROJECT specifications or other contract documents
1.2 Provide only those services that, in the opinion of GEE, lic within the nor to approve or accept any portion of the ~vork, unless specifically
technical and professional areas of expertise of GEE and which GEE is authorized in writing by CLIENT or his authorized representative. GEE
adequately staffed and equipped to perform. shall not have the right of rejection or the right to stop the work, except
for such periods as may be required to conduct the sampling, testing or
1.3 Perform all technical services under the general direction of a Registered inspection of operations covered by the Agreement.
Professional Engineer and in substantial accordance with the basic re-
quirements of the appropriate Standards of The American Society for 3 ~4 This Agreement may be terminated by either party on ten (10) days written
Testing and Materials, where applicable, or other standards designated by notice or by mutual agreement. If this Agreement is terminated by either
CLIENT. party, GEE shall be paid in full for all services performed through the ter-
minatinn date, and the CLIENT shall be provided with a complete report
1.4 Pmmp~y submit formal reports of all tests, inspections and services per- of the results of test and analysis conducted prior to termination.
formed indicating where applicable, compliance with THE PROJECT
specifications or other contract documents. Such reports shall be com- 3.5 Neither CLIENT nor GEE may delegate, assign, sublet or transfer his
plete and factual, citing the tests performed, methods employed, values duties or interest in this Agreement without the written consent of the other
obtained, parts of the structure or PROJECT area involved. patty.
1.5 Employ testing machines which have been calibrated within a period not 3.6 The only WARRANTY made by GEE in connection with its services per-
exceeding twelve months from the time of use by devices of accuracy formed hereunder is that it will use that degree of care and skill as set
traceable to the National Bureau of Standards of the United States forth in Article 1.1 above. No other WARRANTy, expressed or implied,
Department of Commerce and, upon request, submit to CLIENT, or his is made or intended for services provided hereunder or furnishing oral or
authorized representative, documentation of such calibratinn. wfiRen reports of f'mdings made.
1.6 Consider all reports to be the confidential property of CLIENT, and ARTICLE 4. INSURANCE:
distribute reports only to the persons, organizations or agencies
specifically designated in writing by CLIENT or his authorized 4.1 GEE shall secure and maintain throughout the full period of this Agree-
representative. ment sufficient insurance to protect it adequately from claims under ap-
plicable Workmen's Compensation Acts and from claims for bodily injury,
1.7 Retain all pertinent records relating to the services performed for a period death or property damage as may arise from the performance of services
of five years following submission of the report, during which period the under this Agreement. GEE will, upon request, file certification of such
records will be made available to CLIENT at all reasonable times. insurance covcrage with CLIENT or his authorized rcpresentativc. Within
the limits and conditions of such insurance, GEE agrees to indemnify and
ARTICI..E 2. CLIENT'S RESPONSIBILITIES: CLIENT or his authorized save CLIENT harmless from and against any loss, damage, or liability
representative will: arising from any negligent acts by GEE, its agents, staff and consultants
employed by it. GEE shall not be responsib[e and CLIENT shall
2.1 Provide GEE with all plans, specifications, addends, change orders, ap- indenufify GEE for any loss, damage or liability arising from any ncgligem
proved shop drawings and other information for the proper performance acts by CLIENT, its agents, staff, and other consultants employed by it,
of GEE. and any claim asserted against GEE unless it shall be determined that such
claim is based on and resulted from failure by GEE to perform its services
2.2 Issue authorization in writing, giving GEE free access to THE PROJECT hereunder in accordance with this Agreement.
site, and to all shops or yards where materials are prepared or stored.
4.2 No insurance, of whatever kind or type, which may be carried by GEE,
2.3 Designate in writing a person or firm to act as CLIENT's representative is to be considered as in any way limiting the contractor's or
with respect to GEE's services to be performed under this Agreement; suboontractor's responsibility for damages resulting from his operations or
such person or firm to have complete authority to transmit instructions, for furnishing work and materials to THE PROJECT. CLIENT agrees,
receive information and data, interpret and define CLIENT's policies and therefore, to include, or cause to be included in THE PROIECT's
decisions with respect to THE PROJECT and to order, at CLIENT's ex- construction contract, such requirements for insurance coverage and
pense, such technical services as may be requested by GEE. performance bonds to be secured and maintained by THE PROIECT
contractor as CLIENT deems adequate to indemnify CLIENT, GEE, and
2.4 Designate in writing those persons or rirms who are authorized to receive other concerned parties, against claims for damages and to insure
copies of GEE's inspection and test reports. compliance of work performance and materials with THE PROJECT
requirements.
2.5 Advise GEE sufficiently in advance of any operations so as to allow for
assignment of personnel by GEE for completion of the required services. ARTICLE 5. PAYMENT:
Such advance notice shall be in accordance with that established by
mutual agreement of the parties. 5.1 CLIENT will pay GEE for services and expenses in accordance with the
attached fee schedule (Exhibit A). GEE will submit progress invoices to
2.6 Direct THE PROJECT contractor, either by the Construction Contract or CLIENT monthly and a final invoice upon completion of its work. Each
direct written order to: invoice, on presentation, is due and payable by CLIENT or his authorized
(a) Secure and deliver to GEE, without cost to GEE, preliminary representative.
representative samples of those materials he proposes to use which
require testing, together with any relevant data of the materials. 5.2 GEE shall be paid in fu[I for all services under the Agreement, including
(b) Furnish such casual labor and all facilities needed by GEE to obtain any additional services in excess of those stated in the original Agreement,
and handle samples atTHE PROJECT and to facilitate the specified as specifically authorized by CLIENT.
inspection and tests.
(c) Provide and maintain for the use of GEE, adequate space at THE 5.3 The CLIENT's obligation to pay for the work contracted is in no way
PROJECT for safe storage and proper curing of test specimens dependent upon the CLIENT's ability to obtain financing, approval of
which must remain on THE PROJECT site prior to testing. governmental or regulatory agents, orupon the CLIENT's successful com-
pletion of the project.
ARTiCt,E 3. GENERAL CONDITIONS:
ARTICLE 6. EXTENT OF AGREEMENT:
3.1 GEE, by the performance of services covered hereunder, does not in any
way assume, abridge or abrogate any of those duties, responsibilities or The Agreement, including these terms and conditions, represents the entire
authorities with regard to THE PROJECT customarily vested in THE agreement between CLIENT and GEE and supersedes all prior neeotis-
PROJECT architects, design engineers, or any other design agencies or tions, representations or agreements. written or oral. The Agreement may
authorities. be amended only by written instruments signed by CLIENT and GEE.
3.2 GEE shall not be responsible for acts of omissions of any. party or panics ARTICLE 7. APPLICABLE LAW:
involved in the design of THE PROJECT or the failure of any contractor
or subcontractor to construct any aspect of THE PROJECT in accordance The Agreement shah be governed by the taws of the State of Texas.
SHI1VIEK, JACOBS & FINKLEA
CONSULTING ENGINEERS
8333 Douglas Avenue,//820 Dallas, Texas 75225 (214) 361-7900
ROSS L. JACOBS, P.E.
RONALD V. CONWAY, P.E.
JOHN W. BIRKHOFF, P.E.
JOE R. CARTER, P.E.
GARY C. HENDRICKS. P.E.
February 7, 1996
I. C. FINKLEA, P.E.
JAMES E. LAUGHLIN, P.E. ~..~
Mr. Richard W. ee, P.E.
Gee Consulta s, Inc.
10046 Mo oe Dr.
Zyas,
Village Parkway Pump Station Addition
Dear Mr. Gee:
On behalf of the City of Coppell, we have reviewed your proposal dated February 1, 1996, for materials testing and
inspection for the Village Parkway Pump Station Addition. We recommended the City accept your proposal with the
following exceptions:
1. Section VI of the materials testing proposal should be deleted. The concrete slabs for the package
chlorine/ammonia scrubber slabs are existing and will not require further testing. Deducting the $543.00
inspection and testing charges for the scrubber slabs will change the total for all inspection and testing services to
$4,327.25.
2. This proposal has no provisions for overtime charges. We offer no objections to this, provided Gee Consultants,
Inc. understands the City will not pay for overtime. The project specifications state that the general contractor
for the construction of the pump station is responsible for overtime charges related to inspection. It is our
interpretation that this also applies to inspection and testing services provided by the City when using an outside
consultant.
The subject of overtime was discussed in the pre-construction conference for the project held on February 6, 1996.
We believe we made it clear to both you and the general contractor, North Texas Municipal Construction Company,
Inc., that any overtime charges incurred on this project shall be billed directly to the general contractor.
We have been directed by the City to forward these review comments to you and request that you submit a revised
proposal. If you have any questions or need additional information, please do not hesitate to contact us.
Sincerely,
Gary C. Hendricks, P.E.
Enclosure
cc: L~r~ Ken Griffin, P.E.
Mr. Larry Davis
SHIMFK, IACOBS & FINKLEA
CONSULTING ENGINEERS
8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7900
ROSS L. ]ACOBS, RE.
RONALD V. CONWAY, RF.
IOHN W. BIRKHOFF, RE.
JOE R. CARTER, RE. February 7, 1996
GARY C. HENDRJCKS, P.E.
C. L. SHIMEK, P.E.
I. C. FINKLEA, P.E.
JAMES E. LAUGHLIN, P.E.
Mr. Ken Griffin, P.E.
City Engineer
CityofCoppell ~ ~
P.O. Box 478 ~ ..~ ~ d d~
Coppell, Texas 75019-4409 CX/~e.N~v~A.~
Re: Village Parkway Pump Station Addition
Dear Mr. Griffin:
We have reviewed Exhibit "A", dated February 1, 1996 of Gee Consultants, Inc. for materials testing and
inspection for the Village Parkway Pump Station Addition and believe the proposal is acceptable with the
following comments.
1. Section VI in the enclosed testing proposal should be removed because the package chlorine/ammonia
scrubber slabs are in place. Deducting the $543.00 inspection and testing charges for the scrubber slabs
will change the total for all inspection and testing services to $4,327.25.
2. This proposal has no provisions for overtime charges. We offer no objections to this, provided Gee
Consultants, Inc. understands the City will not pay for overtime. The project specifications state that the
general contractor for the construction of the pump station is responsible for overtime charges related to
inspection. It is our interpretation that this also applies to inspection and testing services provided by the
City when using an outside consultant.
This subject was discussed in the pre-construction conference for the project held on February 6, 1996.
We believe we made it clear to both Gee Consultants, Inc. and the general contractor, North Texas
Municipal Construction Company, Inc., that any overtime charges incurred on this project shall be billed
directly to the general contractor.
We are available to discuss the materials testing and inspection proposal further at your ?nvenience.
S 'nce
Enclosure
ec: Mr. Larry Davis
EOTECHNICAL -
E I GEE Consultants, inc.
E I NVIRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794
E X H I B I T "A"
January 23, 1996
Mr. Ken Griffin, P.E.
City Engineer
City of Coppell
P.O. Box 478
Coppell, Texas 75019
RE: Proposal No. 051204
Village Parkway Pump Station Addition
Coppell, Texas
Dear Mr. Griffin:
In accordance with the request of Mr Gary Hendrix of Shimek, Jacobs & Finklea of December
6, 1995, we are pleased to submit the following proposal for materials testing and inspection
services for the above referenced project. Types of services are per plans and specifications and
our telephone conversations.
We estimate the fees will be as follows:
I. UTILITIES
Laboratory Testing
ASTM D 698 Moisture Density Relationships
1 test @ $125.00 per test ......................... $125.00
Atterberg Limits Test
1 test @ $32.00 per test .......................... $32.00
Percent Material. Finer than No. 200 Sieve
1 test @ $18.00 per test .......................... $18.00
Total Laboratory Testing ......................... $175.00
~--,
City of Coppell ~ January 23, 1996
Field Testing
In-Place Moisture Density Tests
8 tests @ $25.00 per test (minimum of 4 tests per trip) ....... $200.00
Soil Sampling Time
2 Hrs. @ $29.75 per hour ......................... $59.50
Trip Charges
3 trips @ $12.50 per trip ......................... $37.50
Total Field Testing ............................. $297.00
Total of Earthwork Testing for Utilities ................. $472.00
II. DRILLED STRAIGHT-SHAFT PIERS
Field Inspection
Continuous Inspection of Pier Drilling and Concreting
(Including Reinforcing Steel) (Based on 4 piers per day
for pump station and 8 piers per day for screening wall)
38 Hrs. @ $29.75 per hour ...................... $1,130.50
Compressive Strength Concrete Cylinders (With Inspection)
(Based on 1 set of 4 cylinders per day)
16 tests @ $13.00 per test ......................... $208.00
Trip Charges
4 trips @ $25.00 per trip (over 4 hours) ................ $100.00
Total of Pier Inspection ........................ $1,438.50
IlI. SLAB-ON-GRADE CONCRETE
Laboratory Testing
ASTM D698 Moisture Density Relationship
2 tests @ $125.00 .............................. $250.00
Atterberg Limits' Test
2 tests @ $32.00 per test ......................... $64.00
Percent Material Finer than No. 200 Sieve
2 tests @ $18.00 per test ......................... $36.00
GEE Consultants, Inc. Proposal No. 051204
Page 2
City of Coppell January 23, 1996
Soil Sampling Time
4 hrs @ $29.75 per hour ......................... $119.00
Trip Charges
2 trips @ $12.50 per trip ......................... $25.00
Total Laboratory Testing ......................... $494.00
Field Inspection and Testing
In-Place Moisture Density Tests
20 tests @ $25.00 per test (minimum of 4 tests per trip) ...... $500.00
Reinforcing Steel Inspection
2 Hrs. @ $29.75 per hour ......................... $59.50
Continuous Inspection of Concrete Placement
6 Hrs. @ $29.75 per hour ......................... $178.50
Compressive Strength Concrete Cylinders (with Inspection)
(Based on 1 set of 4 cylinders per 100 C.Y.)
4 tests @ $13.00 per test ......................... $52.00
Trip Charges
1 trip @ $25.00 per trip ......................... $25.00
6 trips @ $12.50 per trip ................ ' ......... $75.00
Total of Field Testing and Inspection .................. $890.00
Total of Slab-on-Grade Concrete Inspection and Testing ..... $1,384.00
IV. MORTAR
Field Testing
Fabrication of Mortar Test Specimens
3 Hrs. @ $29.75 per hour ......................... $89.25
Mortar Compressive Strength Tests
6 tests @ $13.00 per test ......................... $78.00
Trip Charges
1 trip @ $12.50 per trip .......................... $12.50
Total of Mortar Testing .......................... $179.75
GEE Consultants, Inc. Proposal No. 051204
Page 3
City of Coppell January 23, 1996
V. CONCRETE PAVING
Field Inspection & Testing
Reinforcing Steel Inspection
2 Hrs. @ $29.75 per hour ......................... $59.50
Continuous Inspection of Concrete Placement
8 Hrs. @ $29.75 per hour ......................... $238.00
Compressive Strength Concrete Cylinders (with Inspection)
8 tests @ $13.00 per test ......................... $104.00
Sampling Time
2 hrs @ $29.75 per hour ......................... $59.50
Trip Charges
2 trips @ $25.00 per trip ......................... $50.00
2 trips @ $12.50 per trip ......................... $25.00
In-Place Moisture Density Tests
6 tests @ $25.00 per test (minimum 4 tests per trip) ......... $150.00
Total Field Inspection and Testing .................... $686.00
Laboratory Testing
ASTM D698 Moisture Density Relationships (lime. treated)
1 test @ $135.00 per test ......................... $135.00
Atterberg Limits Test
1 test @ $32.00 per test .......................... $32.00
Total Laboratory Testing ......................... $167.00
Total Concrete Pavement Inspection and Testing ........... $853.00
PACKAGE CHLORINE/AMMONIA SCRUBBER SLABS
Laboratory Testing
ASTM D698 Moisture Density Relationships
1 test @ $125.00 per test ......................... $125.00
Alterberg Limit Test
1 test @ $32.00 per test .......................... $32.00
GEE Consultants, Inc. Proposal No. 051204
Page 4
City of Coppell January 23, 1996
Percent Material Finer than No. 200 Sieve
1 test @ $18.00 per test .......................... $18.00
Total Laboratory Testing ......................... $175.00
Field Testing and Inspection
In-Place Moisture Density Tests
4 tests @ $25.00 per test (minimum of 4 test per trip) ........ $100.00
Reinforcing Steel Inspection
2 Hrs. @ $29.75 per hour ......................... $59.50
Continuous Inspection of Concrete Placement
4 Hrs. @ $29.75 per hour ................ ' ......... $119.00
Compressive Strength Concrete Cylinders (with Inspection)
4 tests @ $13.00 per test ......................... $52.00
Trip Charges
1 trip @ $25.00 per trip .......................... $25.00
1 trip @ $12.50 per trip ................ .......... $12.50
Total Field Testing ............................. $368.00
Total Chlorine/Ammonia Scrubber Slabs Inspection and Testing . . $543.00
TOTAL OF ALL INSPECTION AND TESTING SERVICES $4,870.~
N et/e
Our total estimated fee to perform the aforementioned tests and services is $4,870.25. It should
be noted that this proposal is based on the estimated number of tests and quantities mentioned
in this proposal and not a lump sum price. The construction sequence or job conditions may
require more or fewer testing or inspection. Only work which is actually performed will be
charged for and all charges will be in accordance with the corresponding unit fees quoted in this
proposal or our Schedule of Fees.
We understand we have been selected for this project and, therefore, when providing this
estimate, are not in violation of laws governing procurement of professional engineering
contracts with public entities.
If this proposal is acceptable to you, please sign the enclosed copy, along with the Agreement
for Materials Engineering and Related Construction Inspection and Materials Testing Services,
and mail it to us at your earliest convenience.
GEE Consultants, Inc. Proposal No. 051204
Page 5
City of Coppell January 23, 1996
We trust the information provided herein is sufficient for your use. Should you have any
comments and/or questions, please do not hesitate to contact us. We are looking forward to
working with you.
Sincerely,
GEE Consultants, Inc.
Geetha R. Krishnan, M.S.C.E., E.I.T. Richard W. Gee, P.E.
Project Engineer President
GRK: RWG/leg
Attachment
GEE Consultants, Inc. Proposal No. 051204
Page 6
AGREEMENT FOR MATERIALS ENGINEERING AND RELATED CONSTRUCTION
INSPECTION AND MATERIALS TESTING SERVICES
THIS AGREEMENT is by and between:
Mr. Ken Griffin, P.E.
City Engineer
City of Coppell
P.O. Box 478
Coppell, Texas 75019
hereinafter called CLIENT and GEE CONSULTANTS, INC., a Texas corporation, hereinafter
called GEE, who agree as follows:
1. DECLARATIONS. CLIENT desires to engage GEE to provide Materials Engineering and
related construction inspection and materials testing services in connection with CLIENT's
project ("THE PROJECT") described as follows:
Village Parkway Pump Station Addition
Coppell, Texas
GEE has submitted a fee schedule to CLIENT, a copy of which is attached hereto and
made a part hereof as Exhibited A, for Materials Engineering and related construction
inspection and materials testing services, which fee schedule is acceptable to CLIENT.
2. SCOPE OF WORK. GEE shall provide Materials Engineering and related construction
inspection and materials testing services for THE PROJECT in accordance with the
accompanying proposal "scope of services" made a part hereof as Exhibit B and the
"terms and conditions" set forth on the back of and made a part of this Agreement.
EXECUTED THIS day of , 19__.
CLIENT
By:
BGyE:E C
Title: ~r~si~lent'
TO BE COMPLETED BY CLIENT:
FOR PAYMENT OF SERVICES:
Firm:
Address:
Zip Code:__ Phone No.
Attention: Title:
Invoice to the Account of:
FOR APPROVAL OF INVOICE(S):
If the invoice is to be mailed for approval to someone other than the account charged,
please indicate where to mail the invoice in the space below.
Firm:
Address:
Zip Code: __ Phone No.
Attention: Title:
ARTIC1,E 1. SERVICES: GEE will:
with recommendations contained in any correspondence or verbal
1.1 Act for CLIENT in a professional manner, using that degree of care and recommendation issued by GEE.
skill ordinarily exercised by and consistent with the standards of the pro-
fession practicing in the same or similar locality of THE PROJECT site. 3.3 GEE is not authorized to revoke, alter, relax, enlarge or release any re-
quirement of THE PROJECT specifications or other contract documents
1.2 Provide only those services that, in the opinion of GEE, lie within the nor to approve or accept any portion of the work, unless specifically
technical and professional areas of expertise of GEE and which GEE is authorized in writing by CLIENT or his authorized representative. GEE
adequately staffed and equipped to perform. shall not have the right of rejection or the right to stop the work, except
for such periods as may be required to conduct the sampling, testing or
1.3 Perform all technical services under the general direction of a Registered inspection of operations covered by the Agreement.
Professional Engineer and in substantial accordance with the basic re-
quirements of the appropriate Standards of The American Society for 3.4 This Agreement may be terminated by either party on ten (10) days written
Testing and Materials, where applicable, or other standards designated by notice or by mutual agreement. If this Agreement is terminated by either
CLIENT. party, GEE shall be paid in full for all services performed through the ter-
mination date, and the CLIENT shall be provided with a complete report
1.4 Promptly submit formal reports of all tests, inspections and services per- of the results of test and analysis conducted prior to termination.
forered indicating where applicable, compliance with THE PROJECT
specifications or other contract documents. Such reports shall be corn- 3.5 Neither CLIENT nor GEE may delegate, assign, sublet or transfer his
plete and factual, citing the tests performed, methods employed, values duties or interest in this Agreement without the written consent of the other
obtained, parts of the structure or PROJECT area involved. party.
1.5 Employ testing machines which have been calibrated within a period not 3.6 The only WARRANTY made by GEE in connection with its services per-
exceeding twelve months from the time of use by devices of accuracy formed hereunder is that it will use that degree of care and skill as set
traceable to the National Bureau of Standards of the United States forth in Article 1.1 above. No other WARRANTY, expressed or implied,
Department of Commerce and, upon request, submit to CLIENT, or his is made or intended for services provided hereunder or furnishing oral or
authorized representative, documentation of such calibration. written reports of findings made.
1.6 Consider all reports to be the confidential property of CLIENT, and ARTICLE 4. INSURANCE:
distribute reports only to the persons, organizations or agencies
specifically designated in writing by CLIENT or his authorized 4.1 GEE shall secure and maintain throughout the full period of this Agree-
representative. ment sufficient insnrance to protect it adequately from claims under ap-
plicable Workmen' s Compensation Acts and from claims for bodily injury,
1.7 Retain all pertinent records relating to the services performed for a period death or property damage as may arise from the performance of services
of five years following submission of the report, during which period the under this Agreement. GEE will, upon request, file certification of such
records will be made available to CLIENT at all reasonable times. insurance coverage with CLIENT orhis authorized representative. Within
the limits and conditions of such insurance, GEE agrees to indemnify and
ARTICI,E 2. CLIENT'S RESPONSIBILITIES:' CLIENT or his authorized save CLIENT harn~less from and against any loss, damage, or liability
representative will: arising from any negligent acts by GEE, its agents, staff and consultants
employed by it. GEE shall not be responsible and CLIENT shall
2.1 Provide GEE with all plans, specifications, addenda, change orders, ap- indemnify GEE for any loss, damage or liability arising from any negligent
proved shop drawings and other information for the proper performance acts by CLIENT, its agents, staff, and other consultants employed by it,
of GEE. and any claim asserted against GEE unless it shall be determined that such
claim is based on attd resulted from failure by GEE to perform its services
2.2 Issue authorization in writing, giving GEE free access to THE PROJECT hereunder in accordance with this Agreement.
site, and to all shops or yards where materials are prepared or stored.
4.2 No insurance, of whatever kind or type, which may be carried by GEE,
2.3 Designate in writing a person or firm to act as CLIENT's representative is to be considered as in any way limiting the contractor's or
with respect to GEE's services to be performed under this Agreement; subcontractor's responsibility for damages resulting from his operations or
such person or firm to have complete authority to transmit instructions, for furnishing work and materials to THE PROJECT. CLIENT agrees,
receive information anddata, interpret anddefine CLIENT's policies and therefore, to include, or cause to be included in THE PROJECT's
decisions with respect to THE PROJECT and to order, at CLIENT's ex- construction contract, such requirements for insurance coverage and
pense, such technical services as may be requested by GEE. performance bonds to be secured and maintained by THE PROJECT
contractor as CLIENT deems adequate to indemnify CLIENT, GEE, and
2.4 Designate in writing those persons or firms who are authorized to receive other concerned parties, against claims for damages and to insure
copies of GEE's inspection and test reports. compliance of work performance and materials with THE PROJECT
requirements.
2.5 Advise GEE sufficiently in advance of any operations so as to allow for
assignment of personnel by GEE for completion of the required services, ARTICLE 5. PAYMENT:
Such advance notice shall be in accordance with that established by
mutual agreement of the parties. 5.1 CLIENT will pay GEE for services and expenses in accordance with the
attached fee schedule (Exhibit A). GEE will submit progress invoices to
2.6 Direct THE PROJECT contractor, either.by the Construction Contract or CLIENT monthly and a final invoice upon completion of its work. Each
direct written order to: invoice, on presentation, is due and payable by CLIENT or his authorized
(a) Secure and deliver to GEE, without cost to GEE, preliminary representative.
representative samples of those materials he proposes to use which
require testing, together with any relevant data of the materials. 5.2 GEE shall be paid in full for all services under the Agreement, including
(b) Furnish such casual labor and all facilities needed by GEE to obtain any additional services in excess of those stated in the original Agreement,
and handle samples at THE PROJECT and to facilitate the specified as specifically authorized by CLIENT.
inspection and tests.
(c) Provide and maintain for the use of GEE, adequate space at THE 5.3 The CLIENT' s obligation to pay for the work contracted is in no way
PROJECT for safe storage and proper curing of test specimens dependent upon the CLIENT's ability to obtain financing, approval of
which must remain on THE PROJECT site prior to testing. governmental or regulator/agents, or upon the CLIENT' s successful com-
pletion of the project.
ARTICi,E 3. GENERAL CONDITIONS:
ARTICLE 6. EXTENT OF AGREEMENT:
3.1 GEE, by the performance of services covered hereunder, does not in any
way assume, abridge or abrogate any of those duties, responsibilities or The Agreement, including these terms and conditions, represents the entire
authorities with regard to THE PROJECT customarily vested in THE agreement between CLIENT and GEE and supersedes all prior negotia-
PROJECT architects, design engineers, or any other design agencies or tions, representations or agreements, written or oral. The Agreement may
authorities. be amended only by written instruments signed by CLIENT and GEE.
3.2 GEE shall not be responsible for acts of omissions of any party or parties ARTICLE 7. APPLICABLE LAW:
involved in the design of THE PROJECT or the failure of any contractor
or subcontractor to construct any aspect of THE PROJECT in accordance The Agreement shall be governed by the laws of the State of Texas.
[~'EOTECHNICAL
E GEE Consultants, Inc.
E NVIRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794
E X H I B I T "A"
January 23, 1996
Mr. Ken Griffin, P.E.
City Engineer
City of Coppell
P.O. Box 478
Coppell, Texas 75019
RE: Proposal No. 051204
Village Parkway Pump Station Addition
Coppell, Texas
Dear Mr. Griffin:
In accordance with the request of Mr Gary Hendrix of Shimek, Jacobs & Finklea of December
6, 1995, we are pleased to submit the following proposal for materials testing and inspection
services for the above referenced project. Types of services are per plans and specifications and
our telephone conversations.
We estimate the fees will be as follows:
I. UTILITIES
Laboratory Testing
ASTM D 698 Moisture Density Relationships
1 test @ $125.00 per test ......................... $125.00
Alterberg Limits Test
1 test @ $32.00 per test .......................... $32.00
Percent Material Finer than No. 200 Sieve
1 test @ $18.00 per test .......................... $18.00
Total Laboratory Testing ......................... $175.00
City of Coppell January 23, 1996
Field Testing
In-Place Moisture Density Tests
8 tests @ $25.00 per test (minimum of 4 tests per trip) ....... $200.00
Soil Sampling Time
2 Hrs. @ $29.75 per hour ......................... $59.50
Trip Charges
3 trips @ $12.50 per trip ......................... $37.50
Total Field Testing ............................. $297.00
Total of Earthwork Testing for Utilities ................. $472.00
II. DRILLED STRAIGHT-SHAFT PIERS
Field Inspection
Continuous Inspection of Pier Drilling and Concreting
(Including Reinforcing Steel) (Based on 4 piers per day
for pump station. and 8 piers per day for screening wall)
38 Hrs. @ $29.75 per hour ...................... $1,130.50
Compressive Strength Concrete Cylinders (With Inspection)
(Based on 1 set of 4 cylinders per day)
16 tests @ $13.00 per test ......................... $208.00
Trip Charges
4 trips @ $25.00 per trip (over 4 hours) ................ $100.00
Total of Pier Inspection ........................ $1,438.50
III. SLAB-ON-GRADE CONCRETE
Laboratory Testing
ASTM D698 MOisture Density Relationship
2 tests @ $125.00 .............................. $250.00
Alterberg Limits Test
2 tests @ $32.00 per test ......................... $64.00
Percent Material Finer than No. 200 Sieve
2 tests @ $18.00 per test ......................... $36.00
GEE Consultants, Inc. Proposal No. 051204
Page 2
City of Coppell January 23, 1996
Soil Sampling Time
4 hrs @ $29.75 per hour ......................... $119.00
Trip Charges
2 trips @ $12.50 per trip ......................... $25.00
Total Laboratory Testing ......................... $494.00
Field Inspection and Testing
In-Place Moisture Density Tests
20 tests @ $25.00 per test (minimum of 4 tests per trip) ...... $500.00
Reinforcing Steel Inspection
2 Hrs. @ $29.75 per hour ......................... $59.50
Continuous Inspection of Concrete Placement
6 Hrs. @ $29.75 per hour ......................... $178.50
Compressire Strength Concrete Cylinders (with Inspection)
(Based on 1 set of 4 cylinders per 100 C.Y.)
4 tests @ $13.00 per test ......................... $52.00
Trip Charges
1 trip @ $25.00 per trip ......................... $25.00
6 trips @ $12.50 per trip .......................... $75.00
Total of Field Testing and Inspection .................. $890.00
Total of Slab-on-Grade Concrete Inspection and Testing ..... $1,384.00
IV. MORTAR
Field Testing
Fabrication of Mortar Test Specimens
3 Hrs. @ $29.75 per hour ......................... $89.25
Mortar Compressire Strength Tests
6 tests @ $13.00 per test ......................... $78.00
Trip Charges
1 trip @ $12.50 per trip .......................... $12.50
Total of Mortar Testing .......................... $179.75
GEE Consultants, Inc. Proposal No. 051204
Page 3
City of Coppell January 23, 1996
V. CONCRETE PAVING
Field Inspection & Testing
Reinforcing Steel Inspection
2 Hrs. @ $29.75 per hour ......................... $59.50
Continuous Inspection of Concrete Placement
8 Hrs. @ $29.75 per hour ......................... $238.00
Compressive Strength Concrete Cylinders (with InSpection)
8 tests @ $13.00 per test ......................... $104.00
Sampling Time
2 hrs @ $29.75 per hour ......................... $59.50
Trip Charges
2 trips @ $25.00 per trip ......................... $50.00
2 trips @ $12.50 per trip ......................... $25.00
In-Place Moisture Density Tests
6 tests @ $25.00 per test (minimum 4 tests per trip) ......... $150.00
Total Field Inspection and Testing .................... $686.00
Laboratory Testing
ASTM D698 Moisture Density Relationships (lime treated)
1 test @ $135.00 per test ......................... $135.00
Alterberg Limits Test
1 test @ $32.00 per test .......................... $32.00
Total Laboratory Testing ................ ......... $167.00
Total Concrete Pavement Inspection and Testing ........... $853.00
PACKAGE CHLORINE/AMMONIA SCRUBBER SLABS
Laboratory Testing
ASTM D698 Moisture Density Relationships
1 test @ $125.00 per test ......................... $125.00
Atterberg Limit Test
1 test @ $32.00 per test .......................... $32.00
GEE Consultants, Inc. Proposal No. 051204
Page 4
City of Coppell January 23, 1996
Percent Material Finer than No. 200 Sieve
1 test @ $18.00 per test .......................... $18.00
Total Laboratory Testing ......................... $175.00
Field Testing and Inspection
In-Place Moisture Density Tests
4 tests @ $25.00 per test (minimum of 4 test per trip) ........ $100.00
Reinforcing Steel Inspection
2 Hrs. @ $29.75 per hour ......................... $59.50
Continuous Inspection of Concrete Placement
4 Hrs. @ $29.75 per hour ......................... $119.00
Compressive Strength Concrete Cylinders (with Inspection)
4 tests @ $13.00 per test ......................... $52.00
Trip Charges
1 trip @ $25.00 per trip .......................... $25.00
1 trip @ $12.50 .per trip .......................... $12.50
Total Field Testing ............................. $368.00
Total Chlorine/Ammonia Scrubber Slabs Inspection and Testing . . $543.00
TOTAL OF ALL INSPECTION AND TESTING 870.25 f/V
SERVICES
/ re /xl ) F/ e e vFa
Our total estimated fee to perform the aforementioned tests and services is $4,870.25. It should
be noted that this proposal is based on the estimated number of tests and quantities mentioned
in this proposal and not a lump sum price. The construction sequence or job conditions may
require more or fewer testing or inspection. Only work which is actually performed will be
charged for and all charges will be in accordance with the corresponding unit fees quoted in this
proposal or our Schedule of Fees.
We understand we have been selected for this project and, therefore, when providing this
estimate, are not in violation of laws governing procurement of professional engineering
contracts with public entities.
If this proposal is acceptable to you, please sign the enclosed copy, along with the Agreement
for Materials Engineering and Related Construction Inspection and Materials Testing Services,
and mail it to us at your earliest convenience.
GEE Consultants, Inc. Proposal No. 051204
Page 5
City of Coppell , January 23, 1996
We trust the information provided herein is sufficiem for your use. Should you have any
comments and/or questions, please do not hesitate to contact us. We are looking forward to
working with you.
Sincerely,
GEE Consultants, Inc.
· S.C.E., E.I.T. Richard W. Gee, P.E.
Project Engineer President
GRK: RWG/leg
Attachment
GEE Consultants, Inc. Proposal No. 051204
Page 6