TR1401-CN141006 CONSTRUCTION SPECIFICATIONS AND CONTRACT DOCUMENTS FOR LED Illumination Upgrade On Freeport Parkway South (Sandy Lake Road to Ruby Road) And West Sandy Lake Road (North Coppell Road to Denton Tap Road) THE CITY OF COPPELL Project No. TR14-01 Bid No. Q-1014-01 Prepared by TBPE Registration No. F-230 October 2014 TABLE OF CONTENTS Page # Section 1 - Bidding Documents 1-3 Notice to Bidders 1-4 Instructions to Bidders 1-6 Bid Form/Proposal/Bid Schedule 1-18 Prevailing Wage Rates 1-24 Bid Affidavit 1-25 Conflict of Interest 1-27 Section 2 - Contract Documents 2-1 Standard Form of Agreement (Contract) 2-2 Certificate of Insurance 2-8 Instructions for Bonds 2-9 Performance Bond 2-10 Payment Bond 2-12 Maintenance Bond 2-14 For this project, the Standard Specifications for Public Works Construction – North Central Texas Council of Governments Fourth Edition, the City of Coppell Standard Construction Details (Ord.#2006-1129), and Appendix ‘C’ Design Criteria and Standards in the City of Coppell Subdivision Ordinance (Ord.#94-643) shall govern all work to be done, together with any additional Supplementary Conditions, Specific Project Requirements, General Notes, Description of Pay Items and/or Technical Specifications included herein. Section 3 - City of Coppell's Supplementary Conditions 3-1 to the NCTCOG General Provisions Section 4 - Specific Project Requirements 4-1 Section 5 - Description of Pay Items 5-1 1-2 Bidding Documents SECTION 1 BIDDING DOCUMENTS 1-3 Bidding Documents NOTICE TO BIDDERS The City of Coppell is accepting bids for the construction of LED Illumination Upgrade on Freeport Parkway South (Sandy Lake Road to Ruby Road) and West Sandy Lake Road (North Coppell Road to Denton Tap Road). This work shall consist of installing City furnished illumination poles with fixtures on existing foundations and furnishing and installing wiring to connect and energize fixtures using existing conduit and electrical service points. Bidding documents, including Half-size Construction Plans, Construction Specifications and Contract Documents, may be obtained for a non-refundable cost of $30.00 from the office of City of Coppell Purchasing Agent, 255 Parkway Boulevard, Coppell, Texas 75019. Digital copies of the bidding documents can be downloaded at www.BidSync.com. Bidding documents also may be examined free of charge at the offices of the City Engineer, City of Coppell, 265 Parkway Boulevard, Coppell, Texas 75019 or Teague Nall and Perkins, Inc., 1100 Macon Street, Fort Worth, Texas 76102. To ensure proper notification of Addendums, make sure that you are a registered plan holder on the plan holder’s list. Sealed bids addressed to the Purchasing Agent, City of Coppell, Texas, for the construction of LED Illumination Upgrade on Freeport Parkway South (Sandy Lake Road to Ruby Road) and West Sandy Lake Road (North Coppell Road to Denton Tap Road) will be received in the Purchasing Office at the City of Coppell Town Center, 255 Parkway Boulevard, until 2:00 p.m., October 28, 2014, and then publicly opened and read aloud. Each Bidder shall submit two identical copies of this bid with the City of Coppell Bid No. Q-1014-01 designated clearly on the exterior of the bid envelope. A Pre-Bid Conference has been scheduled for this project at the Coppell City Hall (255 Parkway Boulevard) at 2:00 p.m. on October 21, 2014. The conference is not mandatory; however, all interested bidders are strongly encouraged to attend. The Owner reserves the right to reject any or all bids and to waive formalities. Unreasonable or unbalanced unit prices will be considered sufficient cause for rejection of any bid or bids. NO BID TRANSMITTED BY FAX WILL BE ACCEPTED. Bidders are expected to inspect the site of the work and to inform themselves regarding local conditions and conditions under which the work is to be done. Complete sets of bidding documents must be used in preparing Bids; the City of Coppell assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. NO SALES TAX ON TANGIBLE PERSONAL PROPERTY IS INCORPORATED INTO OR MADE A PART OF THE PROJECT. The bidder shall not include or provide for sales tax on tangible 1-4 Bidding Documents personal property to be incorporated into the project. (Note: This procedure m ay not be used, however, for materials which do not become a part of the finished product, such as, equipment rental or purchase, form materials, etc.). In order to be exempt from the sales tax on such tangible personal property, the contract shall separate and provide separate charges for materials to be incorporated into the project from charges for labor. The City will provide the Contractor with an exemption certificate for the materials. The contractor is expected to issue a resale certificate in lieu of paying a sales tax at the time of purchase. The bidder shall show the cost of materials (tangible personal property) in the space provided on the bid form. The successful bidder's bid form will be used to develop a separated contract and determine the extent of the tax exemption. 1-5 Bidding Documents BIDDING AND CONTRACT DOCUMENTS INSTRUCTIONS TO BIDDERS 1. Defined Terms. Terms used in these Instructions to Bidders which are defined in the Standard Specifications for Public Works Construction - North Central Texas Council of Governments Fourth Edition and the Supplementary Conditions of Agreement have the meanings assigned to them in these General Conditions. The term "Bidder" means one that submits a Bid directly to Owner, as distinct from a sub-bidder, who submits a bid to a Bidder. The term "Successful Bidder" means the lowest, qualified, responsible Bidder, as determined after review of calendar days, overall price, and qualifications, to whom the Owner (on the basis of the Owner's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Notice to Bidders, Instructions to Bidders, the Bid Form, the Construction Plans and Specifications, and the proposed Contract Documents (including all Addenda issued prior to receipt of bids). Specific defined terms are: Owner: Wherever the word “Owner” or "OWNER" is used in the specifications and Contract Documents, it shall be understood as referring to the City of Coppell, Texas. Engineer: Wherever the word “Engineer” or "ENGINEER" is used in the Specifications and Contract Documents, it shall be understood as referring to the City Engineer or his authorized representative, City of Coppell, P.O. Box 9478, Coppell, Texas 75019. Consulting Engineer: Wherever the word “Consulting Engineer” or "Design Engineer" is used in the Specifications and Contract Documents, it shall be understood as referring to the Design Engineer or his authorized representative, Teague Nall and Perkins, Inc., 1100 Macon Street, Fort Worth, Texas 76102. Inspector: The authorized representative of the City of Coppell assigned to observe and inspect any or all parts of the work and the materials to be used therein. 2. Scope of Work. This work shall consist of installing City furnished illumination poles with fixtures on existing foundations and furnishing and installing wiring to connect and energize fixtures using existing conduit and electrical service points. The overall scope of work shall include all the components necessary to complete the construction of continuous roadway lighting systems on the following arterial segments: • Freeport Parkway South - between Sandy Lake Road and Ruby Road 1-6 Bidding Documents • West Sandy Lake Road - between North Coppell Road and Denton Tap Road. These segments are being reconstructed or have been recently reconstructed as four lane divided facilities with illumination foundations and conduit to accommodate the LED illumination poles and wiring. On Freeport Parkway the electrical service for the illumination was installed with the service for the irrigation, shown as E1 and E3 on the Illumination plans. On Sandy Lake Road the electrical service for the Illumination was installed with the service for the traffic signals at North Coppell Road (E4), South Coppell Road (E5), and Whispering Hills (E6). Lighting for the roadway bridges in these segments was installed as part of the roadway reconstruction projects and is not a part of this contract. 3. Copies of Bidding Documents. 3.1 Bidding documents, including Half-size Construction Plans, Construction Specifications and Contract Documents, may be obtained for a non-refundable cost of $30.00 from the office of City of Coppell Purchasing Agent, 255 Parkway Boulevard, Coppell, Texas 75019. Digital copies of the bidding documents can be downloaded at www.BidSync.com. Bidding documents also may be examined free of charge at the offices of the City Engineer, City of Coppell, 255 Parkway Boulevard, Coppell, Texas or Teague Nall and Perkins, Inc., 1100 Macon Street, Fort Worth, Texas 76102. The following general requirements pertain to the Bidding Documents: A) No bidding documents will be issued later than two (2) days prior to the bid opening date. B) After award of the Contract, the successful Bidder will be furnished five (5) sets of Contract Documents at no charge. Additional sets over five (5) will be furnished for $30.00 per set. 3.2 Complete sets of Bidding Documents must be used in preparing Bids; the City of Coppell assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. No partial sets of plans, specifications or proposal forms will be issued. 3.3 The Owner, in making copies of Bidding Documents available on the above terms, does so only for the purpose of obtaining Bids on the Work and does not confer a license or grant for any other use. 4. Qualifications of Bidders. The Bidder shall submit within five (5) days of the Owner's request such evidence as the Owner may require to establish his financial responsibility, experience and possession of such equipment as may be needed to prosecute the work in an 1-7 Bidding Documents expeditious, safe and satisfactory manner. Submissions will be made to City Engineer, City of Coppell, 255 Parkway Boulevard, Coppell, Texas. The required information to be submitted shall consist of, but shall not necessarily be limited to, the following: A. Current Project Experience (must be submitted within five (5) days if requested): A list of all projects presently under construction by the bidder including approximate cost and completion date shall be submitted upon request. B. Past Project Experience (must be submitted within five (5) days if requested): A list of comparable projects completed within the previous five years including approximate cost(s), quantities, and completion date(s). C. Equipment (must be submitted within five (5) days if requested): A list of equipment, which will be used on this project. The Bidder shall demonstrate that he has adequate equipment to complete this project, properly and expeditiously and shall state what additional equipment, if any, that he must rent/lease as may be required to complete this project. D. Financial (must be submitted within five (5) days if requested): Each Bidder shall be prepared to submit upon request of the Owner a balanced financial statement with no evidence of threatening losses as evidenced by an audited certified financial statement (current within the last six (6) months of bid date). This information will be used to confirm that the Bidder has suitable financial status to meet obligations incidental to performing the work. E. Technical Experience (must be submitted within five (5) days if requested): The Bidder shall demonstrate to the satisfaction of the Owner that he has the technical experience to properly complete this project. F. Proof that the bidder maintains a permanent place of business (must be submitted within five (5) days if requested). 5. Conflict of Interest. City Charter states that no officer or employee of the City shall have a financial interest (direct or indirect) in any contract with the City, nor shall be financially interested (directly or indirectly) in the sale to the City of any land, or rights or interest in any land, materials, supplies or services. This prohibition does not apply when the interest is represented by ownership of stock in a corporation involved, provided such stock ownership amounts to less than one percent (1%) of the corporation stock. Any violation of this prohibition will constitute malfeasance in office. Any officer or employee of the City found guilty thereof should thereby forfeit his office or position. Any violation of this prohibition with the knowledge, expressed or implied, of the persons or corporations contracting with the City shall render the contract voidable by the City Manager or the City Council. By submitting a bid, the 1-8 Bidding Documents Contractor represents that no employee or officer of the City has an interest in the Contractor. 6. Examination of Contract Documents and Site. 6.1 It shall be the Contractor’s responsibility before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to become familiar with local conditions that may affect cost, progress, performance or furnishing of the Work, (c) consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents. Failure to make these examinations shall in no way relieve any Bidder from the responsibility of fulfilling all of the terms of the contract, without additional cost to the OWNER. 6.2 Information and data reflected in the Contract Documents with respect to Underground Facilities at or contiguous to the site is based upon information and data furnished to the Owner by Owners of such underground Facilities or others, and the Owner does not assume responsibility for the accuracy or completeness thereof. All existing structures, improvements, and utilities shall be adequately protected, at the expense of the Contractor, from damage that might otherwise occur due to construction operations. Where construction comes in close proximity to existing structures or utilities, or if it becomes necessary to move services, poles, guy wires, pipe lines, or other obstructions, it shall be the Contractor's responsibility to notify and cooperate with the utility or structure owner. The utility lines and other existing structures shown on the plans are for information only and are not guaranteed by the City to be complete or accurate as to location and/or depth. It shall be the Contractor's responsibility to verify locations and depths sufficiently in advance of construction such that necessary adjustments may be made to allow for the proper installation of proposed improvements as indicated in the plans. The Contractor shall be liable for damage to any utilities resulting from the construction of this project. 6.3 Before submitting a Bid, each Bidder will, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and underground facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work and which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price and other terms and conditions of the Contract Documents. 6.4 On request in advance, the Owner will provide each Bidder access to the site to conduct explorations and tests as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes, clean up and restore the site to its former conditions, according to the City standards, upon completion of such explorations. 1-9 Bidding Documents 6.5 The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the Work, are identified in the Contract documents. 6.6 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 6, that without exception the Bid is premised upon performing and furnishing the work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 7. Interpretations and addenda. 7.1 All questions about the meaning or intent of the Contract Documents are to be directed to the Purchasing Agent. Interpretations or clarifications considered necessary by the Purchasing Agent in response to such questions will be issued by Addenda mailed or delivered to all bidders recorded as having received the Bidding Documents. Questions received less than two days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Each Bidder shall acknowledge on the bid proposal that all Addenda issued have been received. 7.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by the Owner. 8. Contract Time. 8.1 The time of completion of the project will be set through the bidding technique used in the Proposal Form. A more detailed explanation of the bidding technique and completion time is given in Item 1.7 of the Specific Project Requirements (Section 4). Completion time will be a strong factor in the awarding of a contract for this project. 8.2 Prior to the issuance of the Notice to Proceed by the Owner, the Contractor shall submit a detailed Progress and Schedule chart to the Owner for approval. 8.3 Extension of the contract time shall be based on a Change Order or written amendment as specified in Item 108.8 of the General Provisions. 9. Liquidated Damages. Provisions for incentive/disincentive liquidated damages are not applicable to this project. 1-10 Bidding Documents 10. Substitute or "Or-Equal" Items. The Contract, if awarded, will be on the basis of materials and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or "or-equal" items. Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or-equal" item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Effective Date of the Agreement. No substitutions should be considered during the bidding process. 11. Subcontractors, Suppliers, and Others. 11.1 If the Owner requests the identity of any Subcontractors, Suppliers, or other persons or organizations to be submitted to the Owner in advance of the specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within seven (7) days after the request submit to the Owner a list of all such Subcontractors, Suppliers and other persons and organizations proposed for those portions of the Work for which such identification is requested. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, supplier, person or organization if requested by the Owner. If the Owner, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, other person or organization, Owner may, before the Notice of Award is given, request the apparent Successful Bidder to submit an acceptable substitute in which case the apparent Successful Bidder shall submit an acceptable substitute. Bidder's Bid price may be increased (or decreased) by the difference in cost occasioned by such substitution, and the Owner may consider such price adjustment in evaluating Bids and making the contract award. If the apparent Successful Bidder declines to make any such substitution, the Owner may award the contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, other persons and organizations. The declining to make requested substitutions will not constitute grounds for sacrificing the Bid security of any Bidder. 11.2 No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor has reasonable objection. 1-11 Bidding Documents 12. Bid Proposal. 12.1 Two (2) completed Bid Proposals must be submitted in a sealed envelope as described in Item 15 of these Instructions to Bidders. The blank spaces in the Bid Form shall be filled in for each item for which a quantity is given and the Bidder shall state the price for which he proposes to do each item of work. All blanks on the bid form must be completed in ink or typed. No substitutions, revisions, or omissions from the plans and/or specifications will be accepted unless authorized in writing by the Owner. 12.2 The legal status of the Bidder, that is, as a corporation, partnership, or individual, must be stated on the Bid Form. A corporation Bidder must name the state in which the organization is chartered. Bids which are signed for a corporation shall have the correct corporate name thereof, its post office address, and the signature of the president or other authorized officer of the corporation, manually written below the corporate name in the following manner: "By (name) - (corporate title) ." If the bid is made by a firm or partnership, the name and post office address of the managing member of the firm or partnership shall be given or the bid may be signed by an attorney-in-fact. If signed by an attorney-in-fact, there shall be attached to the bid a power of attorney evidencing authority to sign the bid, executed by the members of the firm or partners. If the bid is made by an individual, his post office address shall be given. Bids which are not signed by the individuals making them shall have attached thereto a power of attorney evidencing authority to sign the bid in the name of the person for whom it is signed. 13. Provision Concerning Escalator Clauses. Bids containing any condition which provides for changes in the stated bid prices due to increase or decrease in the costs of materials, labor, or other items required for this project, may be rejected and returned to the Bidder without being considered. 14. Estimates of Quantities. The quantities listed in the Bid Form will be considered as approximate and will be used for the comparison of bids, unless stated otherwise in the description of pay items. Payments will be made to the Contractor only for the actual quantities of work performed or materials furnished in accordance with the contract. The quantity of work to be done and the materials may be increased or decreased as provided for in the Contract Documents. If an item is noted as a “Plans Quantity” then only the quantity shown in the unit bid price schedule will be paid. 1-12 Bidding Documents 15. Submission of Bids. Bids will be received by the Purchasing Agent, and shall be submitted to the Purchasing Agent, City of Coppell, at the Town Center, 255 Parkway Boulevard, P.O. Box 9478, Coppell, Texas 75019 until, 2:00 p.m., October 28, 2014, and then publicly opened and read aloud. Two identical copies of the bid enclosed in an opaque sealed envelope and marked with the Project title, City of Coppell Bid No. Q-1014-01. and the name and address of the Bidder shall be submitted. If the Bid is sent through the mail or other delivery system the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED Construction of: on the face of it and addressed to the Purchasing Agent, City of Coppell, Texas. Bid submission shall include Bid Form, Bid Affidavit, Bid Bond and Conflict of Interest Form. 16. Modification and Withdrawal of Bids. 16.1 Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. 16.2 If, within twenty-four hours after the Bids are opened, any Bidder files a duly signed written notice with the Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of the Bid, that Bidder may withdraw his bid. Thereafter, that Bidder will be disqualified from further bidding on the work. 17. Rejection of Bids. Bids may be rejected if they show alterations of form, additions not called for, conditional bids, incomplete bids, erasures or irregularities of any kind. The Owner reserves the right to waive any irregularities in the bids as received and to reject any and all bids without qualification(s). More than one bid from an individual, firm or partnership, corporation or association, under the same or different names, will not be considered. Reasonable grounds for believing that a Bidder is interested in more than one such bid may cause the rejection of all bids in which said Bidder is interested. Bids in which prices are obviously unbalanced may be rejected. Bids submitted without a Proposal Guaranty, per NCTCOG’s Item 102.5 of the Standard Specifications for Public works will be rejected. 18. Bids to Remain Subject to Acceptance. All Bids will remain subject to acceptance for ninety (90) calendar days after the day of the Bid opening, but the Owner may, in its sole discretion, release any Bid prior to that date. 1-13 Bidding Documents 19. Award of Contract. 19.1 For the purpose of award, each bid submitted shall consist of two parts whereby: Base Bid (A) = The correct summation of the products of the estimated quantities shown in the proposal, multiplied by their bid unit prices for the Freeport Parkway South portion. Base Bid (B) = The correct summation of the products of the estimated quantities shown in the proposal, multiplied by their bid unit prices for the West Sandy Lake Road portion. Total Bid = Base Bid (A) + Base Bid (B) All payments will be based on actual quantities and bid unit prices. 19.2 The Owner reserves the right to reject any and all Bids, to waive any and all informalities except for the time of submission of the Bid and to negotiate contract terms with the Successful Bidder. The Owner also reserves the right to reject all nonconforming, non-responsive, unbalanced or conditional Bids. Also, the Owner reserves the right to reject the Bid of any Bidder if the Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or has doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. 19.3 In evaluating Bids, the owner will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid form or prior to the Notice of Award. Time of completion will be a consideration in the award of the bid. 19.4 The Owner may consider the qualifications and experience of any Subcontractors, Suppliers, or other persons or organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations must be submitted as requested by the Owner. The Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 19.5 The Owner may conduct such investigations as the Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial stability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to the Owner's satisfaction within the prescribed time. 1-14 Bidding Documents 19.6 If contract is to be awarded, it will be awarded to the lowest and best qualified Bidder whose evaluation by the Owner indicates to the Owner that the award will be in the best interests of the Project. 19.7 If the contract is to be awarded, the Owner will give the Successful Bidder a Notice of Award within ninety (90) calendar days after the date of the Bid opening. 20. Execution of Agreement. Within fifteen (15) days after written notification of award of the contract, the Successful Bidder shall execute and furnish to the Owner three (3) original signed contracts and a Certificate of Insurance. 21. Affidavit of Bills Paid. Prior to final acceptance of this project by the Owner, the Contractor shall execute an affidavit that all bills for labor, materials, and incidentals incurred in the project construction have been paid in full, and that there are no claims pending. 22. Bid Compliance. Bid must comply with all Federal, State, county and local laws. Contractor shall not hire nor work any illegal alien. 23. Notice to Proceed. Upon execution of the Contract, the Owner will issue a written Notice to Proceed to the Contractor requesting that he proceed with the construction. The Calendar day count for the project shall commence within ten (10) calendar days after the date of the Notice to Proceed or when the contractor begins work, whichever occurs first. 24. Sales Tax. The bidder shall not include or provide for sales tax on tangible personal property to be incorporated into the project. In order to be exempt from the sales tax on such tangible personal property, the contract shall separate and provide separate charges for materials to be incorporated into the project from charges for labor. The City will provide the Contractor with an exemption certificate for the materials. The contractor is expected to issue a resale certificate in lieu of paying a sales tax at the time of purchase. The bidder shall show the cost of materials to be incorporated into the contract (tangible personal property) in the space provided on the bid form. The successful bidders bid form will be used to develop a separated contract and will determine the extent of the tax exemption. Upon execution of the construction contract, the successful bidder shall provide a per item breakdown of: a) materials incorporated into the project; and b) labor, equipment, supervision and materials not incorporated into the project. 1-15 Bidding Documents 25. Silence of Specification. The apparent silence of these specifications as to any detail or to the apparent omission from it of a detailed description concerning any point, shall be regarded as meaning that only the best commercial practices are to prevail. All interpretations of these specifications shall be made on the basis of this statement by Owner or their authorized representative. 26. Change Orders. No oral statement of any person shall modify or otherwise change, or affect the terms, conditions or specifications stated in the resulting Contract. All change orders to the Contract will be made in writing by the Owner. 27. Assignment. The Successful Bidder shall not sell, assign, transfer or convey this Contract, in whole or in part, without the prior written consent of Owner. 28. Venue. This agreement will be governed and construed according to the laws of the State of Texas. This agreement is performable in Dallas County, Texas. 29. Maintenance Bond. The Contractor shall provide a two-year Maintenance Bond in the amount of 50% of the value of the work at the completion of the project. The bond must be provided prior to final payment by the City. The Maintenance Bond is to cover all defective workmanship or materials furnished in the construction or any part thereof or any of the accessories thereto constructed by the Contractor. 30. Testing Requirements. Place the lighting system in operation for a 30 day test period. Burn the lighting system steadily for 48 hours. Then cycle the photocell or other control device for 28 days. Pass a 30 day continuous performance test of the lighting system. Replace materials that are damaged or have failed before acceptance. Damaged illumination assemblies, except those damaged by the Contractor, and minor failures of lamps, ballasts, and photocells are not cause for modifying or restarting the performance test. Replace failed or damaged existing lighting system components when caused by the Contractor. 1-16 Bidding Documents The City will relieve the Contractor of routine maintenance responsibilities upon passing a 30 day continuous performance test of the lighting system and acceptance of the Contract. The work performed, materials furnished, equipment, labor, tools, and incidentals will not be measured or paid for directly, but will be subsidiary to pertinent Items. The City will pay for electrical energy consumed by the lighting system. 31. Overtime. Hours worked before 8:00 a.m. or after 5:00 p.m., all weekends and holidays are subject to overtime. Overtime request or scheduled testing must be made in writing and approved by the City of Coppell. Seventy-two hours advance-notice is required. All overtime incurred by the City for inspection services and any overtime incurred by the testing laboratory shall be paid by the Contractor. If not paid, such cost may be deducted from partial payments. The pay rate for Inspector overtime charges will be $54 / hr. 32. Payment. Contractor shall submit Applications for Payment in accordance with Item 109.5 of the General Provisions. Applications for Payment will be processed by Engineer as provided in the General Provisions. 33. Documentation of Existing Conditions. Contractor must prepare a video and provide a copy to City of existing conditions within entire work area prior to the start of construction. This is subsidiary to the pay item for Right-of-way Preparation. 34. Bid Security. Contractor must submit a bid security in the amount of five (5%) percent of the amount of the maximum total bid as a guarantee that the Bidder will promptly enter into a Contract and execute a Performance, Payment and Maintenance Bonds on the forms included in the Contract Documents if awarded the contract. Acceptable Bid Security are: a) Certified or cashier’s check made payable to the Owner. b) An approved Bidder’s Bond underwritten by a surety named in the current list of “Surety Companies Acceptable on Federal Bonds” as published in the Federal Register by the Audit Staff Bureau of Accounts, U.S. Treasury Department. 35. Bonds Performance, Payment and Maintenance Bonds are required for this project and shall be provided in accordance with the General Conditions. 1-17 Bidding Documents BID FORM PROJECT IDENTIFICATION: LED Illumination Upgrade on Freeport Parkway South (Sandy Lake Road to Ruby Road) and West Sandy Lake Road (North Coppell Road to Denton Tap Road) Coppell, Texas BID OF _____________________________________________ DATE __________ (NAME OF FIRM) THIS BID IS SUBMITTED TO: City of Coppell (hereinafter called OWNER) c/o Purchasing Agent 255 Parkway Boulevard P.O. 9478 Coppell, Texas 75019 CITY OF COPPELL BID NO: 1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER accepts all of the terms and conditions of the Advertisement or Notice to Bidders and Instructions to Bidders. This Bid will remain subject to acceptance for ninety (90) days after the day of Bid opening. BIDDER will sign and submit the Agreement with other documents required by the Bidding Requirements within fifteen (15) days after the date of OWNER's Notice of Award. 3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that: (a) BIDDER has examined copies of all the Bidding Documents and of the following Addenda (receipt of all which is hereby acknowledged): No: Date: ______ Rec'd: ______ 1-18 Bidding Documents (b) BIDDER has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. (c) BIDDER has studied carefully all reports of exploration and tests of subsurface conditions contained in the contract documents and which have been used in preparation of the contract documents. CONTRACTOR may rely upon the accuracy of the technical data contained in such reports, but not upon nontechnical data, interpretations or opinions contained therein or for the completeness thereof for CONTRACTOR's purposes. Except as indicated in the immediately preceding sentence, CONTRACTOR shall have full responsibility with respect to subsurface conditions at site. BIDDER has studied carefully all drawings of the physical conditions in or relating to existing surface or subsurface structures on the site, which are contained in the contract documents and which have been utilized in preparation of the contract documents. CONTRACTOR may rely upon the accuracy of the technical data contained in such drawings, but not for the completeness thereof for CONTRACTOR's purposes. Except as indicated in the immediately preceding sentence, CONTRACTOR shall have full responsibility with respect to physical conditions in or relating to such structures. (d) BIDDER has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies (in addition to or to supplement those referred to in (c) above) which pertain to the subsurface or physical conditions at the site or otherwise may affect the cost, progress, performance or furnishing of the Work as BIDDER considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, explorations, tests reports or similar information or data are or will be required by BIDDER for such purposes. (e) BIDDER has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports or similar information or data in respect of said Underground Facilities are or will be required by BIDDER in order to perform and furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents. 1-19 Bidding Documents (f) BIDDER has correlated the results of all such observations, examinations, investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents. (g) BIDDER has given ENGINEER written notice of all conflicts, errors or discrepancies that it has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER. (h) This bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. (i) It is understood and agreed that the following quantities of work to be done at unit prices are approximate only, and are intended principally to serve as a guide in evaluating bids. (j) It is understood and agreed that the quantities of work to be done at unit prices and materials to be furnished may be increased or diminished as may be considered necessary in the opinion of the OWNER to complete the work fully as planned and contemplated, and that all quantities of work, whether increased or decreased, are to be performed at the unit prices set forth, except as provided for otherwise in the Contract Documents. 4. BIDDER understands that the work for each street will be completed in multiple phases. Plans for phasing or move-ins by utility and paving contractors will require approval by the Engineer. It is understood and agreed that all work under this contract will be completed within the bid calendar days. Completion date will be established in the Notice to Proceed. It is understood that time of completion will be a consideration in the award of the bid. 5. It is understood and agreed that the contractor’s experience in this type of work will be a strong consideration in the award of the bid. 6. It is strongly recommended that each BIDDER visit the site prior to submitting a bid. Construction constraints exist, including heavy traffic volume along the roadway and accessibility requirements to & from adjacent streets, neighborhoods and properties, which could affect productivity. 7. BIDDER will complete the Work for the following price(s): 1-20 Bidding Documents ITEM ESTIMATED UNIT DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT BID Freeport Parkway South 1 1 LS complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per lump sum.$__________________$__________________ 2 19 EA complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per each.$__________________$__________________ 3 1 EA complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per each.$__________________$__________________ 4 10 LF complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per linear foot.$__________________$__________________ 5 3800 LF complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per linear foot.$__________________$__________________ 6 3800 LF complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per linear foot.$__________________$__________________ 7 3800 LF complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per linear foot.$__________________$__________________ BASE TOTAL (A)$__________________ Freeport Parkway South Traffic - 1 Conductor #8 XHHW Wire - Red Traffic - 1 Conductor #8 XHHW Wire - Black Traffic - Type 'A' Ground Box with Apron Traffic - 2" PVC Schedule 40 Conduit (Trench Bore) Traffic - 1 Conductor #8 Gauge Bare Wire City of Coppell Bid No. Q-1014-01 LED Illumination Upgrade on Freeport Parkway South and West Sandy Lake Road Project No. TR14-01 Furnish, Install, Maintain, and Remove Temporary Traffic Control Devices Installation of Illumination Pole Assembly and Luminaires 1-21 ITEM ESTIMATED UNIT DESCRIPTION OF ITEMS WITH UNIT TOTAL NO.QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT BID West Sandy Lake Road 1 1 LS complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per lump sum.$__________________$__________________ 2 28 EA complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per each.$__________________$__________________ 3 1 EA complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per each.$__________________$__________________ 4 10 LF complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per linear foot.$__________________$__________________ 5 5695 LF complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per linear foot.$__________________$__________________ 6 5695 LF complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per linear foot.$__________________$__________________ 7 5695 LF complete in place, for the sum of _____________________________________________________Dollars and___________________________________________________Cents per linear foot.$__________________$__________________ BASE TOTAL (B)$__________________ West Sandy Lake Road TOTAL (A) + (B)$__________________ LED Illumination Upgrade on Freeport Parkway South and West Sandy Lake Road Project No. TR14-01 City of Coppell Bid No. Q-1014-01 Traffic - 1 Conductor #8 XHHW Wire - Black Furnish, Install, Maintain, and Remove Temporary Traffic Control Devices Installation of Illumination Pole Assembly and Luminaires Traffic - Type 'A' Ground Box with Apron Traffic - 2" PVC Schedule 40 Conduit (Trench Bore) Traffic - 1 Conductor #8 Gauge Bare Wire Traffic - 1 Conductor #8 XHHW Wire - Red 1-22 BID SUMMARY – BID NO. Q-1014-01 LED Illumination Upgrade on Freeport Parkway South (Sandy Lake Road to Ruby Road) and West Sandy Lake Road (North Coppell Road to Denton Tap Road) TOTAL BASE BID (A) ITEMS – Freeport Parkway South (Sandy Lake Road to Ruby Road) $_______________________ TOTAL BASE BID (B) ITEMS – West Sandy Lake Road (North Coppell Road to Denton Tap Road) $_______________________ *TOTAL BID ITEMS BASE BID (A) + (B) $_______________________ *The bid with the lowest amount for (A) + (B) will be considered the low bid. 4. Communications concerning this Bid shall be addressed to the address of BIDDER indicated on the applicable signature page. 5. BIDDER understands that the Owner is exempt from State Limited Sales and Use Tax on tangible personal property to be incorporated into the project. Said taxes are not included in the Contract Price (see Instructions to Bidders). 6. The terms used in this Bid which are defined in the General Conditions of the Construction Contract included as part of the Contract Documents have the meanings assigned to them in the General Conditions. The City of Coppell reserves the right to delete any portion of this project as it may deem necessary to stay within the City's available funds. Should the City elect to delete any portion, the contract quantities will be adjusted accordingly. PROPOSAL GUARANTY  A Proposal Guaranty shall be provided in accordance with Item 102.5 of the Standard Specifications for Public Works Construction – North Central Texas Council of Governments Fourth Edition. SUBMITTED ON ________________________________________ Signature: ________________________________________ 1-23 Bidding Documents PREVAILING WAGE RATES Classification Hourly Rate CONCRETE FINISHER (Paving & Structures) ..................................................................... 14.12 ELECTRICIAN ............................................. 19.80 FORM BUILDER / FORM SETTER Paving & Curb .............................................. 13.16 Structures ..................................................... 13.84 LABORER Asphalt Raker ............................................... 12.69 Flagger ......................................................... 10.06 Laborer, Common ........................................ 10.72 Laborer, Utility .............................................. 12.32 Pipelayer ...................................................... 13.24 Work Zone Barricade Servicer ..................... 11.68 POWER EQUIPMENT OPERATOR Asphalt Distributor ........................................ 15.32 Asphalt Paving Machine ............................... 13.99 Broom or Sweeper ....................................... 11.74 Concrete Pavement Finishing Machine ....... 16.05 Concrete Saw ............................................... 14.48 Crane Operator, Lattice Boom .................... 17.27 80 Tons or Less Crane Operator, Lattice Boom over ............. 20.52 80 Tons Crane, Hydraulic 80 Tons or Less ................ 18.12 Crawler Tractor ............................................ 14.07 Excavator, 50,000 pounds or less ................ 17.19 Excavator, over 50,000 pounds ................... 16.99 Foundation Drill, Truck Mounted .................. 21.07 Foundation Drill, Crawler Mounted ............... 17.99 Front End Loader 3 CY or Less ................... 13.69 Front End Loader, over 3 CY ....................... 14.72 Loader / Backhoe ......................................... 15.18 Mechanic ...................................................... 17.68 Milling Machine............................................. 14.32 Motor Grader, Fine Grade ............................ 17.19 Motor Grader, Rough ................................... 16.02 Pavement Marking Machine......................... 13.63 Reclaimer/Pulverizer .................................... 11.01 Roller, Asphalt .............................................. 13.08 Roller, Other ................................................. 11.51 Scraper ......................................................... 12.96 Small Slipform Machine ............................... 15.96 Spreader Box ............................................... 14.73 Servicer ........................................................ 14.58 Steel Worker (Reinforcing) .......................... 16.18 Classification Hourly Rate TRUCK DRIVER Lowboy-Float ................................................ 16.24 Off Road Hauler ........................................... 12.25 Single Axle ................................................... 12.31 Single or Tandem Axle Dump Truck ............ 12.62 Tandem Axle Tractor with Semi Trailer ....... 12.86 Transit-Mix ................................................... 14.14 WELDER ..................................................... 14.84 1-24 Bidding Documents BID AFFIDAVIT The undersigned certifies that the bid prices contained in this bid have been carefully reviewed and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or all commodities upon which prices are extended at the price offered, and upon the conditions contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will be ninety (90) calendar days from the date of the bid opening. STATE OF _____________________________COUNTY OF____________________________ BEFORE ME, the undersigned authority, a Notary Public in and for the State of _________, on this day personally appeared ______________________________ who after being by me Name duly sworn, did depose and say: "I, __________________________________ am a duly authorized office/agent for Name _____________________________________ and have been duly authorized to exec ute the Name of Firm foregoing on behalf of the said _____________________________________________________ Name of Firm I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder or individual(s) engaged in the same line of business prior to the official opening of this bid. Further, I certify that the Bidder is not now, nor has been for the past six (6) months, directly or indirectly concerned in any pool, agreement or combination thereof, to control the price of services/ commodities bid on, or to influence any individual(s) to bid or not to bid thereon." Name and Address of Bidder:______________________________________________________ ______________________________________________________________________________ Telephone: ( )________________ by:___________________________________________ Title: ___________________________Signature:______________________________________ SUBSCRIBED AND SWORN to before me by the above named _________________________ on this the __________________ day of ___________________________________20________ Notary Public in and for the State of __________________ ________________________________________________ 1-25 Bidding Documents If BIDDER IS: An Individual By_______________________________________________________________________(Seal) (Individual's Name) doing business as ________________________________________________________________ Business address ________________________________________________________________ ______________________________________________Phone No. ______________________ A Partnership By_______________________________________________________________________(Seal) (Firm Name) ______________________________________________________________________________ (General Partner) Business address _______________________________________________________________ _____________________________________________Phone No. ______________________ A Corporation By____________________________________________________________________________ (Corporation Name) ______________________________________________________________________________ (State of Incorporation) By____________________________________________________________________________ (Name of person authorized to sign) ______________________________________________________________________________ (Title) (Corporate Seal) Attest__________________________________________________________________________ (Secretary) Business address ______________________________________________________________ ____________________________________________Phone No. ______________________ A Joint Venture By____________________________________________________________________________ (Name) (Address) By____________________________________________________________________________ (Name) (Address) (Each joint venture must sign. The manner of signing for each individual, partnership and corporation that is a partner to the joint venture should be in the manner indicated above.) 1-26 Bidding Documents CONFLICT OF INTEREST QUESTIONNAIRE FORM CIQ For vendor or other person doing business with local governmental entity This questionnaire is being filed in accordance with chapter 176 of the Local Government Code by a person doing business with the governmental entity. By law this questionnaire must be filed with the records administrator of the local government not later than the 7th business day after the date the person becomes aware of facts that require the statement to be filed. See Section 176.006, Local Government Code. A person commits an offense if the person violates Section 176.006, Local Government Code. An offense under this section is a Class C misdemeanor. OFFICE USE ONLY Date Received 1 Name of person doing business with local governmental entity. 2  Check this box if you are filing an update to a previously filed questionnaire. (The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than September 1 of the year for which an activity described in Section 176.006(a), Local Government Code, is pending and not later than the 7th business day after the date the originally filed questionnaire becomes incomplete or inaccurate.) 3 Name each employee or contractor of the local governmental entity who makes recommendations to a local government officer of the governmental entity with respect to expenditures of money AND describe the affiliation or business relationship. 4 Name each local government officer who appoints or employs local government officers of the governmental entity for which this questionnaire is filed AND describe the affiliation or business relationship. 1-27 Bidding Documents FORM CIQ CONFLICT OF INTEREST QUESTIONNAIRE Page 2 For vendor or other person doing business with local governmental entity 5 Name of local government officer with whom filer has affiliation or business relationship. (Complete this section only if the answer to A, B, or C is YES. This section, item 5 including subparts A, B, C & D, must be completed for each officer with whom the filer has affiliation or other relationship. Attach additional pages to this Form CIQ as necessary. A. Is the local government officer named in this section receiving or likely to receive taxable income from the filer of the questionnaire?  Yes  No B. Is the filer of the questionnaire receiving or likely to receive taxable income from or at the direction of the local government officer named in this section AND the taxable income is not from the local governmental entity?  Yes  No C. Is the filer of this questionnaire affiliated with a corporation or other business entity that the local government officer serves as an officer or director, or holds an ownership of 10 percent or more?  Yes  No D. Describe each affiliation or business relationship. 6 ____________________________________________________ ___________________ Signature of person doing business with the governmental entity Date 1-28 Bidding Documents SECTION 2 CONTRACT DOCUMENTS 2-1 Contract Documents STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE THIS AGREEMENT is dated as of the __________ day of __________________ in the year 2014 by and between the CITY OF COPPELL, TEXAS, a municipal corporation (hereinafter called OWNER) and _________________ (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: This work shall consist of installing City furnished illumination poles with fixtures on existing foundations and furnishing and installing wiring to connect and energize fixtures using existing conduit and electrical service points. The overall scope of work shall include all the components necessary to complete the construction of continuous roadway lighting systems on the following arterial segments: • Freeport Parkway South - between Sandy Lake Road and Ruby Road • West Sandy Lake Road - between Coppell Road North and Denton Tap Road. These segments are being reconstructed or have been recently reconstructed as four lane divided facilities with illumination foundations and conduit to accommodate the LED illumination poles and wiring. On Freeport Parkway the electrical service for the illumination was installed with the service for the irrigation, shown as E1 and E3 on the Illumination plans. On West Sandy Lake Road the electrical service for the Illumination was installed with the service for the traffic signals at North Coppell Road (E4), South Coppell Road (E5), and Whispering Hills (E6). Lighting for the roadway bridges in these segments was installed as part of the roadway reconstruction projects and is not a part of this contract. The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: 2-2 Contract Documents Construction of: LED Illumination Upgrade on Freeport Parkway South (Sandy Lake Road to Ruby Road) and West Sandy Lake Road (North Coppell Road to Denton Tap Road) PROJECT NO. TR14-01 Bid No. Q-1014-01 Article 2. ENGINEER. The Project has been designed by Teague Nall and Perkins, Inc. Contract administration will be provided by the City of Coppell Engineering Department who is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. CONTRACT TIME. 3.1. The Work will be completed within 60 calendar days of receiving City furnished illumination poles for each phase (Freeport Parkway South and West Sandy Lake Road) of the project and after pole foundations, conduits, and service points have been installed by others. Contract time is suspended when illumination poles are not available or pole foundations, conduits, and service points have not been installed by others. The Contract time commences to run as provided in Item 103.2 of the General Provisions, and the work shall be completed and ready for final payment in accordance with Item 109.5 of the General Provisions. Article 4. CONTRACT PRICE. 4.1. OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents in current funds subject to additions and deductions by Change Orders as provided in the contract documents in accordance with the unit prices listed in the Proposal and Bid Schedule, Section 1 of these contract documents. The total contract sum shall be the amount of: $ . The total tangible personal property cost included in the contract sum is: $ Article 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Item 109.5 of the General Provisions. Applications for Payment will be processed by ENGINEER as provided in the General Provisions. 5.1. Progress Payments. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by ENGINEER, each month during construction as provided below. 2-3 Contract Documents All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in Item 109.5 of the General Provisions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Provisions. 5.1.1. Prior to Completion, progress payments will be made in an amount equal to the percentage indicated in Item 109.5.2 of the General Provisions, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with Item 109.4 of the General Provisions. 5.2. Final Payment. Upon final completion and acceptance of the Work in accordance with Item 109.5.4 of the General Provisions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said Item 109.5.4. Article 6. INTEREST. No interest shall ever be due on late payments. Article 7. CONTRACTOR'S REPRESENTATIONS. In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations: 7.1. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in Item 102.3 of the General Provisions, and accepts the determination set forth in Item SC-105.1.3 of the Supplementary Conditions of the extent of the technical data contained in such reports and drawings upon which CONTRACTOR is entitled to rely. 7.2. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 7.1 above) which pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, progress, performance, or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of Item 102.3 of the General Provisions; and no additional examinations, investigations, explorations, tests, reports, studies, or similar information or data are or will be required by CONTRACTOR for such purposes. 7.3. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes all responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, 2-4 Contract Documents explorations, tests, reports, studies, or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of Items 102.3, 103.1 and 104.1 of the General Provisions. 7.4. CONTRACTOR has correlated the results of all such observations, examinations, investigations, explorations, tests, reports, and studies with the terms and conditions of the Contract Documents. 7.5. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. Article 8. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work consist of the following: 8.1. This Agreement (pages 2-2 thru 2-7, inclusive). 8.2. Exhibits to this agreement (immediately following this Agreement, inclusive), including Performance Bond, Payment Bond and Maintenance Bond. 8.3. Certificate of Insurance. 8.4. Notice of Award. 8.5. Part 1: Standard Specifications for Public Works Construction – North Central Texas Council of Governments Fourth Edition. 8.6. Supplementary Conditions to the NCTCOG, Division 100: General Provisions (pages 3-2 thru 3-10, inclusive). 8.7. Specifications bearing the title: "Construction Specifications and Contract Documents for the " LED Illumination Upgrade on Freeport Parkway South (Sandy Lake Road to Ruby Road) and West Sandy Lake Road (North Coppell Road to Denton Tap Road) (Project No. TR14-01) for the City of Coppell". 8.8. Drawings (Construction Plans) entitled: “LED Illumination Upgrade on Freeport Parkway South (Sandy Lake Road to Ruby Road) and West Sandy Lake Road (North Coppell Road to Denton Tap Road) (Project No. TR14-01) for the City of Coppell”. 8.9. The following listed and numbered addenda: ___________________ 2-5 Contract Documents 8.10. CONTRACTOR's Bid Proposal and Bid Schedule of Section 1 - Bidding Documents. 8.11. Documentation submitted by CONTRACTOR prior to Notice of Award. 8.12. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Written Amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to Items 104.2 and 109.3 of the General Provisions. 8.13. The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). The Contract Documents may only be amended, modified, or supplemented as provided in Items 104.2 and 109.3 of the General Provisions. Article 9. MISCELLANEOUS. 9.1. Terms used in this Agreement which are defined in Item 101. of the General Provisions will have the meanings indicated in the General Provisions. 9.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assignors and legal representatives to the other party hereto, its partners, successors, assignors and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents. 2-6 Contract Documents Article 10. OTHER PROVISIONS. IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in triplicate. One counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER. All portions of the Contract Documents have been signed or identified by OWNER and CONTRACTOR or by ENGINEER on their behalf. This Agreement will be effective on ____________________________________, 2014. OWNER: City of Coppell CONTRACTOR: 255 Parkway Boulevard Coppell, TX 75019 BY: _____________________________ BY: ________________________________ TITLE: __________________________ TITLE: _____________________________ ATTEST: _________________________ ATTEST: ___________________________ Address for giving notices: Address for giving notices: P.O. Box 9478 ___________________________________ Coppell, Texas 75019 Attn: Ken Griffin, P.E. ___________________________________ Dir. of Engineering/Public Works (If OWNER is a public body, attach (If CONTRACTOR is a corporation, attach evidence of authority to sign and evidence of authority to sign.) resolution or other documents authorizing execution of Agreement.) 2-7 Contract Documents Certificate of Insurance After award of contract, Contractor will provide Owner With Certificate of Insurance, which will be executed and bound here with final documents. Please see the Standard Specifications for Public Works Construction – North Central Texas Council of Governments Fourth Edition, Item 103.4 for insurance policies required.  Contractor’s Insurance o Worker’s Compensation – As set forth in the Workers Compensation Act o Commercial General Liability - $1,000,000 Accident/Occurrence o Automobiles - $500,000 Combined single limit per occurrence o Owner’s Protective Liability - $600,000 per occurrence; 1,000,000 aggregate o “Umbrella” Liability - $1,000,000 per occurrence with drop down coverage o Liability (Public) - $1,000,000 Aggregate; $1,000,000 Products & Completed Operations Aggregate  Additional insured – The Owner shall be named as an additional insured on the Commercial General Liability (Public), Owner’s Protective Liability, and Excess/Umbrella Liability Insurance Policies furnished by the Contractor. Please see the Standard Specifications for Public Works Construction – North Central Texas Council of Governments Fourth Edition, Item 107.2 for indemnification requirements. 2-8 Contract Documents Instructions for Bonds A. The surety on each bond must be a responsible surety company that is qualified to do business in Texas and satisfactory to the Owner. B. The name and residence of each individual party to the bond shall be inserted in the body thereof, and each such party shall sign the bond with his usual signature on the line opposite the scroll seal, and if signed in Maine, Massachusetts or New Hampshire, an adhesive seal shall be affixed opposite the signature. C. If the principals are partners, their individual names will appear in the body of the bond, with the recital that they are partners composing a firm, naming it, and all the members of the firm shall execute the bond as individuals. D. The signature of a witness shall appear in the appropriate place, attesting the signature of each individual party to the bond. E. If the principal or surety is a corporation, the name of the State in which incorporated shall be inserted in the appropriate place in the body of the bond, and said instrument shall be executed and attested under the corporate seal, the fact shall be stated, in which case a scroll or adhesive seal shall appear following the corporate name. F. The official character and authority of the person or persons executing the bond for the principal, if a corporation, shall be certified by the secretary or assistant secretary according to the form attached hereto. In lieu of such certificate, records of the corporation as will show the official character and authority of the officer signing, duly certified by the secretary or assistant secretary, under the corporate seal, to be true copies. G. The date of this bond must not be prior to the date of the contract in connection with which it is given. 2-9 Contract Documents PERFORMANCE BOND STATE OF TEXAS } COUNTY OF DALLAS } KNOW ALL MEN BY THESE PRESENTS: That ____________________________________ whose address is ___________________________________________________________, hereinafter called Principal, and __________________________________________________ , a corporation organized and existing under the laws of the State of _____________ , and fully licensed to transact business in the State of Texas as Surety, are held and firmly bound unto the CITY OF COPPELL, a municipal corporation organized and existing under the laws of the State of Texas, hereinafter called "Beneficiary", in the penal sum of _____________________________________________________________ DOLLARS ($___________________ ) in lawful money of the United States, to be paid in Dallas County, Texas, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents. This Bond shall automatically be increased by the amount of any Change Order or Supplemental Agreement which increases the Contract price, but in no event shall a Change Order or Supplemental Agreement which reduces the Contract price decrease the penal sum of this Bond. THE OBLIGATION TO PAY SAME is conditioned as follows: Whereas, the Principal entered into a certain Contract with the City of Coppell, the Beneficiary, dated the _______ of ____________ , A.D. 2014, which is made a part hereof by reference, for the construction of certain public improvements that are generally described as follows: Construction of: LED Illumination Upgrade on Freeport Parkway South (Sandy Lake Road to Ruby Road) and West Sandy Lake Road (North Coppell Road to Denton Tap Road) PROJECT NO. TR14-01 Bid No. Q-1014-01 NOW, THEREFORE, if the Principal shall well, truly and faithfully perform and fulfill all of the undertakings, covenants, terms, conditions and agreements of said Contract in accordance with the plans, specifications and Contract documents during the original term thereof and any extension thereof which may be granted by the Beneficiary, with or without notice to the Surety, and during the life of any guaranty or warranty required under this Contract, and shall also well and truly perform and fulfill all the undertakings, covenants, terms, conditions and agreements of any and all duly authorized modifications of said Contract that may hereafter be made, notice of which modifications to the Surety being hereby waived; and, if the Principal shall repair and/or replace all defects due to faulty materials and workmanship that appear within a period of two (2) years from the 2-10 Contract Documents date of final completion and final acceptance of the Work by Owner; and, if the Principal shall fully indemnify and save harmless the Beneficiary from all costs and damages which Beneficiary may suffer by reason of failure to so perform herein and shall fully reimburse and repay Beneficiary all outlay and expense which the Beneficiary may incur in making good any default or deficiency, then this obligation shall be void; otherwise, it shall remain in full force and effect. PROVIDED FURTHER, that if any legal action be filed on this Bond, exclusive Venue shall lie in Dallas County, Texas. AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the Work to be performed thereunder or the specifications accompanying the same shall in anyway affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work or to the Specifications. This Bond is given pursuant to the provisions of Chapter 2253 of the Texas Government Code, and any other applicable statutes of the State of Texas. The undersigned and designated agent is hereby designated by the Surety herein as the Resident Agent in Dallas County or Denton County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship, as provided by Article 7.19-1 of the insurance Code, Vernon's Annotated Civil Statutes of the State of Texas. IN WITNESS WHEREOF, this instrument is executed in _______________ copies, each one of which shall be deemed an original, this the ______ day of __________________, 2014. PRINCIPAL SURETY ______________________________ ___________________________________ By: ___________________________ By:_______________________________ Title: __________________________ Title:______________________________ ATTEST: ATTEST: ______________________________ _________________________________ Resident Agent of the Surety in Dallas or Denton County, Texas, for delivery of notice and service of the process is: NAME: ______________________________________________________________________ ADDRESS: _____________________________________________________________________ NOTE: Date of Performance Bond must be date of Contract.. If Resident Agent is not corporation, give person's name. 2-11 Contract Documents PAYMENT BOND STATE OF TEXAS } COUNTY OF DALLAS } KNOW ALL MEN BY THESE PRESENTS: That ________________________________ whose address is _________________________________________________________ , hereinafter called Principal, and __________________________________________________ , a corporation organized and existing under the laws of the State of _____________ , and fully licensed to transact business in the State of Texas as Surety, are held and firmly bound unto the CITY OF COPPELL, a municipal corporation organized and existing under the laws of the State of Texas, hereinafter called "Beneficiary", in the penal sum of ___________________________ _________________________________________________________DOLLARS ($___________________ ) in lawful money of the United States, to be paid in Dallas County, Texas, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents. This Bond shall automatically be increased by the amount of any Change Order or Supplemental Agreement which increases the Contract price, but in no event shall a Change Order or Supplemental Agreement which reduces the Contract price decrease the penal sum of this Bond. THE OBLIGATION TO PAY SAME is conditioned as follows: Whereas, the Principal entered into a certain Contract with the City of Coppell, dated the _______ of ____________ , A.D. 2014, which is made a part hereof by reference, for the construction of certain public improvements that are generally described as follows: Construction of: LED Illumination Upgrade on Freeport Parkway South (Sandy Lake Road to Ruby Road) and West Sandy Lake Road (North Coppell Road to Denton Tap Road) PROJECT NO. TR14-01 Bid No. Q-1014-01 NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties and make prompt payment to all persons, firms, subcontractors, corporations and claimants supplying labor and/or material in the prosecution of the Work provided for in said Contract and any and all duly authorized modifications of said Contract that may hereafter be made, notice of which modification to the Surety is hereby expressly waived, then this obligation shall be void; otherwise it shall remain in full force and effect. PROVIDED FURTHER, that if any legal action be filed on this Bond, exclusive Venue shall lie in Dallas County, Texas. 2-12 Contract Documents AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the Work to be performed thereunder or the Plans, Specifications, Drawings, etc., accompanying the same, shall in anyway affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work to be performed thereunder. This Bond is given pursuant to the provisions of Chapter 2253 of the Texas Government Code, and any other applicable statutes of the State of Texas. The undersigned and designated agent is hereby designated by the Surety herein as the Resident Agent in Dallas County or Denton County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship, as provided by Article 7.19-1 of the insurance Code, Vernon's Annotated Civil Statutes of the State of Texas. IN WITNESS WHEREOF, this instrument is executed in _______________ copies, each one of which shall be deemed an original, this the ______ day of ___________________, 2014. PRINCIPAL SURETY ______________________________ ___________________________________ By: ___________________________ By:________________________________ Title: __________________________ Title: _______________________________ ATTEST: ATTEST: ______________________________ ________________________________ The Resident Agent of the Surety in Dallas or Denton County, Texas, for delivery of notice and service of the process is: NAME: ______________________________________________________________________ ADDRESS: ______________________________________________________________________ NOTE: Date of Performance Bond must be date of Contract. If Resident Agent is not a corporation, give a person's name. 2-13 Contract Documents MAINTENANCE BOND STATE OF TEXAS } COUNTY OF DALLAS } KNOW ALL MEN BY THESE PRESENTS: THAT ________________________ _________________________________ as Principal, and ___________________________, a corporation organized under the laws of _____________________________________, as sureties, do hereby expressly acknowledge themselves to be held and bound to pay unto the _____________________________, a Municipal Corporation, Texas, the sum of ___________________________________________ Dollars and __________________________ Cents ($_____________), for the payment of which sum will and truly be made unto said __________________________________, and its successors, said principal and sureties do hereby bind themselves, their assigns and successors jointly and severally. THIS obligation is conditioned; however, that whereas, the said ______________________________________________________________________ has this day entered into a written contract with the said __________________________________ to build and construct LED Illumination Upgrade on Freeport Parkway South (Sandy Lake Road to Ruby Road) and West Sandy Lake Road (North Coppell Road to Denton Tap Road), (Project No. TR14-01), Bid No. Q-1014-01, which contract and the plans and specifications therein mentioned, adopted by the _____________________________ are hereby expressly made a part thereof as through the same were written and embodied herein. WHEREAS, under the plans, specifications, and contract, it is provided that the Contractor will maintain and keep in good repair, the work herein contracted to be done and performed, for a period of two (2) years from the date of the acceptance of said work, and to do all necessary repairs and/or reconstruction in whole or in part of said improvements that should be occasioned by settlement of foundation, defective workmanship or materials furnished in the construction or any part thereof or any of the accessories thereto constructed by the Contractor. It being understood that the purpose of this section is to cover all defective conditions arising by reason of defective material and charge the same against the said Contractor, and sureties on this obligation, and the said Contractor and sureties hereon shall be subject to the liquidation damages mentioned in said contract for each day's failure on its' part to comply with the terms of said provisions of said contract. Now, therefore, if the said Contractor shall keep and perform its' said agreement to maintain said work and keep the same in repair for the said maintenance period of two (2) years, as provided, then these presents shall be null and void, and have no further effect, but if default shall be made by the said Contractor in the performance of its' contract to so maintain and repair said work, then these presents shall have full force and effect, and said ________________________ shall have and receive from the said Contractor and its' principal and sureties damages in the premises, as 2-14 Contract Documents provided; and it is further agreed that this obligation shall be a continuing one against the principal and sureties, hereon, and that successive recoveries may be and had hereon for successive branches until the full amount shall have been exhausted; and it is further understood that the obligation herein to maintain said work shall continue throughout said maintenance period, and the same shall not be changed, diminished or in any manner affected from any cause during said time. IN WITNESS WHEREOF, the said __________________________________ has caused these presents to be executed by ________________________________________ and the said _____________________________________________ has caused these presents to be executed by its Attorney in fact and the said Attorney in fact ____________________________ , has hereunto set his hand, the ______________ day of _______________________, 2014. PRINCIPAL SURETY _______________________________ ___________________________________ By: ____________________________ By:________________________________ Title: ___________________________ Title:_______________________________ WITNESS: ATTEST: _______________________________ __________________________________ NOTE: Date of Maintenance Bond must not be prior to date of Contract. 2-15 Contract Documents SECTION 3 STANDARD SPECIFICATIONS SUPPLEMENTARY CONDITIONS 3-1 Standard Specifications Supplementary Conditions CITY OF COPPELL SUPPLEMENTARY CONDITIONS TO THE NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS GENERAL PROVISIONS THESE SUPPLEMENTARY CONDITIONS AMEND THE STANDARD SPECIFICATIONS FOR THE PUBLIC WORKS CONSTRUCTION – NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS, FOURTH EDITION AS INDICATED BELOW. ALL PROVISIONS WHICH ARE NOT AMENDED OR SUPPLEMENTED REMAIN IN FULL FORCE AND EFFECT. ALL PROVISIONS AMENDED REMAIN IN FULL FORCE AND EFFECT AS AMENDED. DIVISION 100: GENERAL PROVISIONS ITEM 101. – DEFINITIONS & ABBREVIATIONS SC-101.1 Engineer: The word "Engineer" or “ENGINEER” in these contract documents and specifications shall be understood as referring to CITY ENGINEER, City of Coppell, P.O. Box 9478, Coppell, TX 75019, Engineer of the Owner, or such other representatives as may be authorized by said Owner to act in any particular position. Owner: The word "Owner" or “OWNER” in these contract documents and specifications refers to the CITY OF COPPELL acting through its authorized representatives. Consulting Engineer: Wherever the word “Consulting Engineer” or "Design Engineer" is used in the Specifications and Contract Documents, it shall be understood as referring to the Design Engineer or his authorized representative, Teague Nall and Perkins, Inc., 1100 Macon Street, Fort Worth, Texas 76102. Working Day: Add the following sentence to the end of the “W orking Day” definition: “Hours worked before 8:00 a.m. or after 5:00 p.m., all weekends and holidays are subject to overtime. Overtime request or scheduled testing must be made in writing and approved by the City of Coppell. Seventy-two hours advance-notice is required. All overtime incurred by the City for inspection services and any overtime incurred by the testing laboratory shall be paid by the CONTRACTOR. If not paid, such cost may be deducted from partial payments.” All other terms used in these Supplementary Conditions which are defined in the General Provisions shall have the same meanings used in the General Provisions. 3-2 Standard Specifications Supplementary Conditions ITEM 103.3 – SURETY BONDS SC-103.3.1 Add following sentence to Item 103.3.1: "Maintenance Bond shall be required in the amount of 50% of the cost of the public improvements for a 2 year period." ITEM 103.4 - INSURANCE SC-103.4.6 Add the following new item: “103.4.6 If OWNER requests in writing that other special insurance be included in the property insurance policy, CONTRACTOR shall, if possible, include such insurance, and the cost thereof will be charged to OWNER by appropriate Change Order or Written Amendment. Prior to commencement of the Work at the site, CONTRACTOR shall in writing advise OWNER whether or not such other insurance has been procured by CONTRACTOR.” SC-103.4.7 Add the following new item: “103.4.7 CONTRACTOR intends that any policies provided in response to Item 103.4 shall protect all of the parties' insured and provide coverage for all losses and damages caused by the perils covered thereby. Accordingly, all such policies shall contain provisions to the effect that in the event of payment of any loss or damage the insurer will have no rights of recovery against any of the parties named as insured or additional insured, and if such waiver forms are required of any Subcontractor, CONTRACTOR will obtain the same.” SC-103.4.7.1 Add the following new item: “103.4.7.1 Teague Nall and Perkins, Inc. shall be included as an “Additional Insured” on all project liability insurance.” 3-3 Standard Specifications Supplementary Conditions ITEM 103.6 - NOTICE TO PROCEED AND COMMENCEMENT OF WORK SC-103.6 Add following sentence to end of Item 103.6. “Before CONTRACTOR starts the Work at the site, a conference attended by CONTRACTOR, ENGINEER and others as appropriate will be held to discuss the schedules referred to in Items 105.3, 108.1 and 109.5.1, to discuss procedures for handling Shop Drawings and other submittals and for processing Applications for Payment, and to establish a working understanding among the parties as to the Work.” ITEM 104.2 - CHANGE OR MODIFICATION OF CONTRACT SC-104.2.1 Amend the last sentence in Paragraph two of Item 104.2.1 to delete the following phrase: "except as provided below." Add the following sentence to the end of paragraph two in Item 104.2.1: "The unit price of an item of Unit Price Work shall be subject to re-evaluation and adjustment under the following conditions:” ITEM 105.1 – CONTRACT DOCUMENTS SC-105.1.1 Add the following language at the end of the Item 105.1.1: "If there is any conflict between the provisions of the Contract Documents and any such referenced standard specifications, manuals or codes, the provisions of the Contract Documents shall take precedence over that of any standard specifications, manuals or codes." SC-105.1.3 Amend the first sentence of Item 105.1.3 by changing "such copies" to be "five copies". Add the following to the end of Item 105.1.3: "In the preparation of Drawings and Specifications, the Design Engineer has established and relied upon the following reports of exploration and tests of subgrade conditions at the site of the work: Geotechnical Engineering Study – Freeport Parkway (Sandy Lake Road to Wagon Wheel Park) Coppell, Texas, by CMJ Engineers, dated February 2008. Geotechnical Engineering Study – West Sandy Lake Road (S.H. 121 to Denton Tap Road) Coppell, Texas, by CMJ Engineers, dated April 2001. 3-4 Standard Specifications Supplementary Conditions Copies of these reports are available upon request. The CONTRACTOR may also take borings at the site to satisfy himself as to subsurface conditions." ITEM 105.2 - WORKMANSHIP, WARRANTIES AND GUARANTEES SC-105.2.2 Amend the first sentence of Item 105.2.2 to change the words "one year" to "two years". ITEM 105.4 – CONSTRUCTION STAKES SC-105.4 Delete the first paragraph of Item 105.4 in its entirety and insert the following in lieu thereof: "Construction stakes/surveying shall be provided by the CONTRACTOR. Monumentation has been provided for establishing vertical and horizontal control. The CONTRACTOR shall be responsible for establishing all lines and grades, and the precise location of all proposed facilities. The ENGINEER may make checks as the Work progresses to verify lines and grades established by the CONTRACTOR to determine the conformance of the completed Work as it progresses with the requirements of the construction documents. Such checking by the ENGINEER shall not relieve the CONTRACTOR of his responsibility to perform all Work in connection with Contract Drawings and Specifications and to the lines and grades given therein." ITEM 107.3 - OWNER'S OFFICERS, EMPLOYEES OR AGENTS SC-107.3.2 Replace Item 107.3.2 with the following new paragraph: “107.3.2 Conflict of Interest City Charter states that no officer of the City shall have a financial interest, direct or indirect, in any contract with the City, nor shall be financially interested, directly or indirectly, in the sale to the City of any land, or rights or interest in any land, materials, supplies or services. This prohibition does not apply when the interest is represented by ownership of stock in a corporation involved, provided such stock ownership amounts to less than one percent (1%) of the corporation stock. Any violation of this prohibition will constitute malfeasance in office. Any officer or employee of the City found guilty thereof should thereby forfeit his office or position. Any violation of this prohibition with the knowledge, expressed or implied, of the persons or corporations contracting with the City shall render the contract voidable by the City Manager or the City Council. The CONTRACTOR 3-5 Standard Specifications Supplementary Conditions represents that no employee or officer of the City has an interest in the CONTRACTOR.” ITEM 107.14 - STATE AND LOCAL SALES AND USE TAXES SC-107.14 Delete the language in Item 107.14 in its entirety and substitute the following in lieu thereof: “Recent legislation has removed the sales tax exemption previously provided by Section 151.311 of the Tax Code covering tangible personal property purchased by a contractor for use in the performance of a contract for the improvement of City-owned realty. It is still possible, however, for a contractor to make tax-free purchase of tangible personal property, which will be incorporated into and become part of a City construction project through the use of a "separated contract" with the City. A "separated contract" is one, which separates charges for materials from charges for labor. Under such a contract, the contractor becomes a "seller" of those materials, which are incorporated into the project, such as bricks, lumber, concrete, paint, etc. The contractor issues a resale certificate in lieu of paying the sales tax at the time such items are purchased. The contractor then receives an exemption certificate from the city for those materials. (This procedure may not be used, however, for materials, which do not become a part of the finished product. For example, equipment rentals, form materials, etc. are not considered as becoming "incorporated" into the project). Utilization of this "separated contract" approach eliminates the need for bidders to figure in sales tax for materials, which are to be incorporated into the project. The successful bidder's bid form will be used to develop the "separated contract" and will determine the extent of the tax exemption. Upon execution of the construction contract, the CONTRACTOR shall furnish a breakdown (per item) of: 1) materials incorporated into the project; and 2) labor, equipment, supervision and materials not incorporated into the project.” ITEM 107.19 - PROTECTION OF WORK AND OF PERSONS AND PROPERTY SC-107.19.2.1 Add the following new Item 107.19.2.1 immediately after Item 107.19.2: “107.19.2.1 Should CONTRACTOR cause damage to the work or property of any separate contractor at the site, or should any claim arise out of CONTRACTOR's, OWNER’s, ENGINEER’s, Consulting Engineer’s or any other person’s actions, CONTRACTOR shall promptly attempt to settle with such other contractor by agreement, or to otherwise resolve the dispute by arbitration or at law. CONTRACTOR shall, to the fullest extent permitted by Laws and Regulations, indemnify and hold OWNER, ENGINEER and Consulting Engineer harmless from and against all claims, damages, losses 3-6 Standard Specifications Supplementary Conditions and expenses (including, but not limited to, fees of engineers, architects, attorneys and other professionals and court and arbitration costs) arising directly, indirectly or consequentially out of any action, legal or equitable, brought by any separate contractor against OWNER, ENGINEER or Consulting Engineer to the extent based on a claim arising out of CONTRACTOR'S performance of the Work. Should a separate contractor cause damage to the work or property of CONTRACTOR or should the performance of work by any separate contractor at the site give rise to any other claim, CONTRACTOR shall not institute any action, legal or equitable, against OWNER, ENGINEER or Consulting Engineer or permit any action against any of them to be maintained and continued in its name or for its benefit in any court or before any arbiter which seeks to impose liability on or to recover damages from OWNER, ENGINEER or Consulting Engineer on account of any such damage or claim. If CONTRACTOR is delayed at any time in performing or furnishing Work by any act or neglect of a separate contractor and OWNER and CONTRACTOR are unable to agree as to the extent of any adjustment in Contract Time attributable thereto, CONTRACTOR may make a claim for an extension of time in accordance with Item 108.8. An extension of the Contract Time shall be CONTRACTOR's exclusive remedy with respect to OWNER, ENGINEER and Consulting Engineer for any delay, disruption, interference or hindrance caused by any separate contractor.” ITEM 107.23 – EXISTING STRUCTURES, FACILITIES AND APPURTENANCES SC-107.23.2.1 Add the following new Item 107.23.2.1 immediately after Item 107.23.2: “107.23.2.1 Existing Utilities and Sewer Lines: The CONTRACTOR shall be responsible for the protection of all existing utilities or service lines crossed or exposed by the construction operations. Where existing utilities or service lines are cut, broken or damaged, the CONTRACTOR shall replace the utilities or service lines with the same type of original construction, or better, at his own cost and expense. This includes any and all irrigation systems, whether or not they are identified on the plans. If it is necessary to change or move the property of any owner or of a public utility, such property shall not be moved or interfered with until authorized by the ENGINEER. The right is reserved to the owner of any public utility to enter upon the limits of the project for the purpose of making such changes or repairs of their property that may be made necessary by the performance of this contract.” 3-7 Standard Specifications Supplementary Conditions ITEM 108.1 – PROGRESS SCHEDULE SC-108.1 Amend the first sentence of Item 108.1 by adding the following at the beginning of the sentence: "If requested by OWNER or ENGINEER". ITEM 108.3 - OTHER CONTRACTORS; OBLIGATION TO COOPERATE SC-108.3 Delete the last sentence of the second paragraph of Item 108.3 and substitute the following in lieu thereof: "In such event, CONTRACTOR shall be entitled to an extension of working time only for unavoidable delays verified by the ENGINEER, as provided in Item 108.8; however, no increase in the contract price shall be due the CONTRACTOR." Insert the following sentence at the end of the second paragraph of Item 108.3: "The ENGINEER shall coordinate such other work with the CONTRACTOR and schedule events to minimize delay caused to the CONTRACTOR. No additional time shall be given to the CONTRACTOR of such related work except as provided in Item 108.8." ITEM 108.8 - DELAYS; EXTENSION OF TIME; LIQUIDATED DAMAGES SC-108.8 Add the following at the end of the last paragraph in Item 108.8: "No extension of the contract time shall be allowed unless the CONTRACTOR can demonstrate the delay caused an adverse impact to the critical path and that loss of time can not be made up by revising the sequence of the work of the project." 3-8 Standard Specifications Supplementary Conditions SECTION 4 SPECIFIC PROJECT REQUIREMENTS 4-1 Specific Project Requirements SPECIFIC PROJECT REQUIREMENTS The construction specifications, which apply to this project are the Standard Specifications for Public Works Construction - North Central Texas Council of Governments Fourth Edition. The following Specific Project Requirements contain general and specific project requirements applicable to this project in the City of Coppell. These individual specifications control for this project. Additional amendments to the NCTCOG Standard Specifications are contained in Section 3 - Supplementary Conditions to the Standard Specifications for Construction. In the event that an item is not covered in the Project Drawings (Construction Plans) and these Specifications, then the Standard Specifications for the City of Coppell, Texas shall apply. In addition, reference to the following shall be considered as referring to the specifications or Method of Test as set forth by these organizations and shall be considered as part of the Specifications when referenced. A.S.A. American Standards Association A.S.T.M. American Society of Testing Materials A.A.S.H.T.O. American Association of State Highway & Transportation Officials A.C.I. American Concrete Institute A.W.S. American Welding Society A.W.W.A. American Water Works Association S.S.P.C. Steel Structures Painting Council, Federal Specifications Treasury Department U.L. Underwriters Laboratories N.E.M.A. National Electrical Manufacturers Association W.P.C.F. Water Pollution Control Federation TX.DOT Texas Department of Transportation C.D.G.S. City of Dallas General Specifications S.S.P.W.C.N.C.T. Standard Specifications for Public Works Construction North Central Texas T.M.U.T.C.D. Texas Manual on Uniform Traffic Control Devices 4-2 Specific Project Requirements 1.1 OWNER: The "OWNER" or “City” as referred to in these Specifications is the City of Coppell, 255 Parkway Boulevard, P.O. Box 9478, Coppell, Texas 75019. 1.2 ENGINEER: The "Engineer" as referred to in these Specifications is the City Engineer, City of Coppell, Engineer of the Owner, or such other representatives as may be authorized by said Owner to act in any particular position. 1.3 CONSULTING ENGINEER: Wherever the word “Consulting Engineer” or "Design Engineer" is used in the Specifications and Contract Documents, it shall be understood as referring to the Design Engineer or his authorized representative, Teague Nall and Perkins, Inc., 1100 Macon Street, Fort Worth, Texas 76102. 1.4 STANDARD CONSTRUCTION SPECIFICATIONS FOR THE CITY OF COPPELL: All improvements described in this Proposal and Construction Drawings shall be performed in accordance with the Project Drawings and Specifications. In the event that an item is not covered in the Project Drawings and Specifications, then the City of Coppell Standard Construction Details (Ord.#2006-1129), and Appendix ‘C’ Design Criteria and Standards in the City of Coppell Subdivision Ordinance (Ord.#94-643) shall apply. Perform work in accordance with the details shown on the plans and the requirements of this Item: • Use established industry and utility safety practices when installing poles or luminaires located near overhead or underground utilities. Consult with the appropriate utility company before beginning work. • Prevent scarring or marring of the poles, mast arms, and fixtures. Replace damaged components. Repair damaged painted areas of the illumination assembly in accordance with a method approved by the manufacturer. • Stake, install, and align each roadway illumination assembly as shown on the plans. The Department may shift an assembly’s location, if necessary, to secure a more desirable location or to avoid conflict with utilities. • Install roadway illumination assembly components in accordance with the details, dimensions, and requirements shown on the plans 1.5 SITE: The CONTRACTOR shall limit his work to the area shown on the Project Drawings as within the street right-of-way. Entrance onto private property shall be at the expressed approval of the ENGINEER, only. 1.6 PROJECT DESCRIPTION: This work shall consist of installing City furnished illumination poles with fixtures on existing foundations and furnishing and installing wiring to connect and energize fixtures using existing conduit and electrical service points. 4-3 Specific Project Requirements The overall scope of work shall include all the components necessary to complete the construction of continuous roadway lighting systems on the following arterial segments: • Freeport Parkway South - between Sandy Lake Road and Ruby Road • West Sandy Lake Road - between Coppell Road North and Denton Tap Road. These segments are being reconstructed or have been recently reconstructed as four lane divided facilities with illumination foundations and conduit to accommodate the LED illumination poles and wiring. On Freeport Parkway the electrical service for the illumination was installed with the service for the irrigation, shown as E1 and E3 on the Illumination plans. On West Sandy Lake Road the electrical service for the Illumination was installed with the service for the traffic signals at North Coppell Road (E4), South Coppell Road (E5), and Whispering Hills (E6). Lighting for the roadway bridges in these segments was installed as part of the roadway reconstruction projects and is not a part of this contract. 1.7 EXPLANATION OF CONTRACT TIME: The Original Contract Time will not be adjusted for any reason, cause or circumstance whatsoever, regardless of fault, save and except in the instance of a catastrophic event (i.e., war, invasion, riot, declared state of emergency, national strike, or other situations as declared by the OWNER). The parties anticipate that delays may be caused by or arise from any number of events during the course of the Contract, including, but not limited to, work performed, disruptions, permitting issues, actions of suppliers, subcontractors or other contractors, actions by third parties, weather, weekends, holidays, or other such events, forces or factors sometimes experienced in roadway construction work. Such delays or events and their potential impacts on performance by the CONTRACTOR are specifically contemplated and acknowledged by the parties in entering into this Contract. Further, any and all costs or impacts whatsoever incurred by the CONTRACTOR in accelerating the CONTRACTOR’s work to overcome or absorb such delays or events in an effort to complete the Contract prior to expiration of the Original Contract Time, regardless of whether the CONTRACTOR successfully does so or not, shall be the sole responsibility of the CONTRACTOR in every instance. In the event the project is altered by work deleted, change orders, supplemental agreements, utility conflicts, design changes or defects, extra work, right of way issues, or other situations which are not the fault of or a direct result of CONTRACTOR negligence which may impact the critical path of the project construction schedule, the OWNER may choose to negotiate the extension or reduction of the Original Contract Time with the CONTRACTOR. 4-4 Specific Project Requirements In the event of a catastrophic event (i.e., war, invasion, riot, declared state of emergency, national strike, or other situations as declared by the OWNER) directly and substantially affecting the CONTRACTOR’s operations on the Contract, the CONTRACTOR and the OWNER shall agree as to the number of calendar days to extend the Original Contract Time. In the event the CONTRACTOR and OWNER are unable to agree to the number of calendar days to extend the Original Contract Time, the OWNER shall unilaterally determine the number of calendar days to extend the Original contract Time reasonably and necessary and due solely to such catastrophic event and the CONTRACTOR shall have no right whatsoever to contest such determination, save and except that the CONTRACTOR establishes that the number of calendar days determined by the OWNER were arbitrary or without any reasonable basis. 1.8 SAFETY PRECAUTIONS: The CONTRACTOR shall comply with all applicable laws including the Occupational Safety and Health Act of 1970, ordinances, rules, regulations and order of any public authority have jurisdiction for the safety of persons or property to protect them from damage, injury or loss. He shall erect and maintain, as required by existing conditions and progress of the work, all reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent utilities. 1.9 SOIL INVESTIGATION: A geotechnical investigation report from previous project(s) is available and will be made available to the CONTRACTOR upon request. The CONTRACTOR shall also visit the site and acquaint himself with the site conditions. 1.10 SURVEY AND FINISHED GRADES: Horizontal and vertical control from previous project(s) is available by the OWNER. The CONTRACTOR shall be responsible for layout and staking of all grades and lines for construction utilizing qualified survey personnel. The CONTRACTOR shall preserve all stakes or markings until authorized by the ENGINEER to remove same. The CONTRACTOR shall bear the cost of the re-establishing any control or construction stakes destroyed by either him or a third party and shall assume the entire expense of rectifying work improperly constructed due to failure to maintain established points and marks. No separate payment shall be made to the CONTRACTOR for construction staking which shall be considered incidental to the project and payments made under specific Pay Items shall be considered as full compensation for these requirements. 1.11 CONFORMITY WITH DRAWINGS: All work shall conform to the lines, grades, cross-sections, and dimensions shown on the Drawings. Any deviation from the Drawings which may be required by the exigencies of construction will be determined by the ENGINEER and authorized by him in writing. 4-5 Specific Project Requirements 1.12 TESTING LABORATORY SERVICE: The OWNER shall make arrangements with an independent laboratory acceptable for testing as required by the construction plans and standard specifications. The CONTRACTOR shall bear all related costs of retests, or re-inspections. The CONTRACTOR shall notify the ENGINEER in a timely manner of when and where tests or inspections are to be made so that they may be present. One copy shall be provided to the CONTRACTOR of all reports and laboratory test results. Testing by the OWNER does not alleviate the CONTRACTOR’s responsibility for his own quality assurance/quality control testing. CONTRACTOR shall replace any deficient construction items. 1.13 SUSPENSION OF WORK: If the work should be stopped or suspended under any order of the court, or other public authority, the OWNER may at any time during suspension upon seven days written notice to the CONTRACTOR, terminate the Contract. In such an event, the OWNER shall be liable only for payment for all work completed plus a reasonable cost for any expenses resulting from the termination of the Contract, but such expenses shall not exceed $5,000. 1.14 PRESERVATION OF TREES: Permission of the ENGINEER must be obtained for removal of trees that obstruct the installation of the improvements as outlined for this project in these Contract Documents. The penalty for the removal or destruction of a tree without obtaining written permission from the ENGINEER shall be $500.00 per caliper inch payable to the OWNER. If damage is occurring or is likely to continue, tree guards shall be erected when so directed by the ENGINEER at the CONTRACTOR's expense. 1.15 COOPERATION OF CONTRACTOR: The CONTRACTOR shall have on the project at all times, as his agent, a competent Superintendent capable of reading the plans and specifications and thoroughly experienced in the type of work being performed. The Superintendent shall have full authority to execute orders or directions and to promptly supply such materials, equipment, tools, labor and incidentals as may be required. Such superintendence shall be furnished irrespective of the amount of work contracted. The Superintendent and the CONTRACTOR shall be responsible for supervision of all work performed by the subcontractor at all times during construction. 1.16 WARNING DEVICES: The CONTRACTOR shall have the responsibility to provide and maintain all warning devices and take all precautionary measures required by law to protect persons and property while said persons or property are approaching, leaving or within the work site or any area adjacent to said work site. Compensation will be paid to the CONTRACTOR for the installation or maintenance of any warning devices, barricades, lights, signs or any other precautionary measures required by law for the protection of persons or property under pay item to “Furnish, Install, Maintain, and Remove Traffic Control Devices”. 4-6 Specific Project Requirements The CONTRACTOR shall assume all duties owned by the City of Coppell to the general public in connection with the general public's immediate approach to and travel through the work site and area adjacent to said work site. Where the work is carried on, in, or adjacent to, any street, alley, sidewalk, public right-of-way or public place, the CONTRACTOR shall at his own cost and expense provide such flagmen and watchmen and furnish, erect and maintain such warning devices, barricades, lights, signs and other precautionary measures for the protection of persons or property as are required by law. The CONTRACTOR shall submit a traffic control plan to be reviewed by the City prior to the beginning of work. In preparing the traffic control plan, the CONTRACTOR shall take into account that the project will be constructed in multiple phases. The CONTRACTOR shall be responsible for placing notices on private residences prior to the beginning of each phase that shows revised traffic patterns. No lane shall be barricaded before 9:00 a.m. or after 4:00 p.m. The CONTRACTOR's responsibility for providing and maintaining flagmen, watchmen, warning devices, barricades, signs, and lights, and other precautionary measures shall not cease until the project shall have been fully and finally accepted by the OWNER. If the ENGINEER discovers that the CONTRACTOR has failed to comply with the applicable federal and state law (by failing to furnish the necessary flagmen, warning devices, barricades, lights, signs or other precautionary measures for the protection of persons or property), the ENGINEER may order such additional precautionary measures as required by law to be taken to protect persons and property, and to be reimbursed by the CONTRACTOR for any expense incurred in ordering such additional precautionary measures. In addition, the CONTRACTOR will be held responsible for all damages to the work and other public or private property due to the failure of warning devices, barricades, signs, lights, or other precautionary measures in protecting said property, and whenever evidence is found of such damage, the ENGINEER may order the damaged portion immediately removed and replaced by and at the cost and expense of the CONTRACTOR. If the damages are not corrected in a timely fashion, then the City shall have the right to repair the damage and charge the cost back to the CONTRACTOR. All of this work is considered incidental to pay item entitled, “Furnish, Install and Maintain Traffic Control Devices”. 1.17 EXISTING UTILITIES, STRUCTURES AND OTHER PROPERTY: In regards to existing utilities, structures and other property within, crossing or adjacent to the site, the CONTRACTOR understands and accepts the following conditions: a. Prior to any excavation, the CONTRACTOR shall determine the locations of all existing water, gas sewer, electric, telephone, telegraph, television, and 4-7 Specific Project Requirements other underground utilities and structures. This includes the water and sanitary sewer services. b. After commencing the work, the CONTRACTOR will use every precaution to avoid interferences with existing underground and surface utilities and structures, and protect them from damage. c. Where the locations of existing underground and surface utilities and structures are indicated, these locations are generally approximate, and all items that may be encountered during the work are not necessarily indicated. The CONTRACTOR shall determine the exact locations of all items indicated, and the existence and locations of all items not indicated. d. The CONTRACTOR shall repair or pay for all damage caused by his operations to all existing utilities, public property, and private property, whether it is below ground or above ground, and he shall bear sole responsibility to settle the total cost of all damage suits which may arise as a result of this operations. e. To avoid unnecessary interferences or delays, the CONTRACTOR shall coordinate all utility removals, replacements and construction directly with the appropriate utility company. 1.18 DRAINAGE: The CONTRACTOR shall maintain adequate drainage along the project and provide for positive drainage from adjoining properties, at all times. 1.19 PROJECT MAINTENANCE: The CONTRACTOR shall maintain, and keep in good repair, the improvements covered by these plans and specifications during the life of the contract. 1.20 CLEANUP: During Construction. The CONTRACTOR shall at all times keep the job site as free from all material, debris and rubbish as is practicable and shall remove same from any portion of the job site when it becomes objectionable or interferes with the progress of the project, and/or when requested to do so by the OWNER. Final. Upon completion of the work, the CONTRACTOR shall remove from the site all plant, materials, tools and equipment belonging to him and leave the site with an appearance acceptable to the ENGINEER and the OWNER. The CONTRACTOR shall thoroughly clean all equipment and materials installed by him and shall deliver over such materials and equipment in a bright, clean, polished and new-appearing condition. 1.21 INSPECTION: The word "Inspection" or other forms of the word, as used in the contract documents for this project shall be understood as meaning an OWNER's agent will observe the construction on behalf of the OWNER. The agent will 4-8 Specific Project Requirements observe and check the construction in sufficient detail to satisfy himself that the work is proceeding in general accordance with the contract documents, but he will not be a guarantor of the CONTRACTOR's performance. 1.22 DISPOSAL OF WASTE AND SURPLUS EXCAVATION: All trees, stumps, slashings, brush or other debris removed from the site as a preliminary to the construction of the various improvements shall be removed from the property by the CONTRACTOR. Any required burning and/or disposal permits shall be the sole responsibility of the CONTRACTOR. All excavated materials in excess of that required for backfilling shall be removed from the job site and disposed of in a satisfactory manner by the CONTRACTOR. 1.23 WATER FOR CONSTRUCTION: The CONTRACTOR shall make the necessary arrangement for securing and transporting all water required in the construction of this project, including water required for mixing of concrete, sprinkling, testing, flushing, flooding, or jetting. The CONTRACTOR shall provide water as required at his own expense. 1.24 GUARANTEE: All work shall be guaranteed against defects resulting from the use of inferior materials, equipment or workmanship for a period of two (2) years from the date of final completion and acceptance of the project. 4-9 Specific Project Requirements SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 1.1 GENERAL: A. CONTRACTOR to submit Shop Drawings, Product Data and Samples as required by the Contract Documents and as specified in other sections of the specifications. 1.2 SHOP DRAWINGS: A. As soon as practicable after contract award, submit to the ENGINEER, for review, the required number of bound copies of shop drawings of all items as specified in the various sections of these specifications, accompanied by letters of transmittal. B. Shop drawings shall include: Manufacturer's catalog sheets and/or descriptive data for materials and equipment; showing dimensions, performance characteristics, and capacities and other pertinent information as required to obtain approval of the items involved. C. No work requiring shop drawings will be executed until review and acceptance of such drawings has been obtained. 1.3 PRODUCT DATA: A. Preparation: 1. Clearly mark each copy to identify pertinent products or models. 2. Show performance characteristics and capacities. 3. Show dimensions and clearances required. B. Manufacturers standard schematic drawings and diagrams: 1. Modify drawings and diagrams to delete information that is not applicable to the work. 2. Supplement standard information to provide information specifically applicable to the work. 1.4 SAMPLES: Provide samples as indicated in other parts of these specifications. 1.5 CONTRACTOR RESPONSIBILITIES: A. Review Shop Drawings and Product Data prior to submission. B. Determine and verify: 1. Field measurements. 2. Field construction criteria. 3. Catalog numbers and similar data. 4-10 Specific Project Requirements 4. Conformance with specifications. C. Coordinate each submittal with requirements of the work and of the Contract Documents. D. Begin no work that requires submittals until return of submittals with ENGINEER's review. E. Keep one (1) approved copy of shop drawings or product data at job site at all times. 1.6 SUBMISSION REQUIREMENTS: A. Make submittals promptly and in such sequence as to cause no delay in the work or in the work of any other contractor. B. Number of submittals required: 1. For shop drawings and product data: Submit the number of copies that the CONTRACTOR requires, plus two that will be retained by the ENGINEER. C. Submittals shall contain: 1. The date of submission and the dates of any previous submissions. 2. The project title. 3. The names of: a. Contractor b. Supplier c. Manufacturer 4. Identification of the product. 5. Field dimensions, clearly identified as such. 6. Relation to adjacent or critical features of the work or materials. 7. Applicable standards, such as ASTM or Federal Specification numbers. 8. Identification of deviations from Contract Documents. 9. Identification of revisions on re-submittals. 10. Contractor's stamp, initialed or signed, certifying to review of submittal, verification of products, field measurements and field construction criteria, and a\coordination of the information within the submittal with requirements of the work and of Contract Documents. 11. Fabrication and erection drawings lists and schedules. 12. Basis of design and design calculations signed and sealed by a registered professional engineer. 13. Seal and signature of a register engineer on all structural submittals. 4-11 Specific Project Requirements D. REVIEW: 1. Shop drawing and product data information review will be general. Such review will not relieve the CONTRACTOR of any responsibility and work required by the Contract. 2. Satisfactory shop drawings will be so designated and all sets, except four (4), returned to the CONTRACTOR. Rejected shop drawings will be so designated and all sets except two (2) will be returned to the CONTRACTOR, with indications of the required corrections and changes. 3. Rejected shop drawings will be corrected and resubmitted to the ENGINEER for Acceptance. 1.7 RESUBMISSION REQUIREMENTS: A. Make any corrections or changes in the submittals required by the ENGINEER and resubmit until accepted. B. Shop Drawings and Product Data: 1. Revise initial drawings or data, and resubmit as specified for the initial submittal. 2. Indicate any changes that have been made other than those requested by the ENGINEER. 1.8 ENGINEER'S RESPONSIBILITIES: A. Review submittals with reasonable promptness. B. Affix stamp and initials or signature, and indicate requirements for re- submittal, or acceptance of submittal. C. Return submittals to CONTRACTOR for distribution, or for resubmission. 4-12 Specific Project Requirements SECTION 5 DESCRIPTION OF PAY ITEMS SECTION 5 - DESCRIPTION OF PAY ITEMS This section includes comments concerning various Pay Items so that the CONTRACTOR can fully understand the scope of work contemplated and required under each of the Pay Items. 1. Construction No Pay Items: All work necessary for the orderly completion of the project, but not specifically included as a pay item in the Proposal, shall be considered subsidiary to the Contract and no separate or additional payment will be made therefore. For example, there shall be no separate payment for the following: (a) removal and replacement of any existing signs; (b) removal of spoils; (c) water for construction; (d) construction staking and/or layout; (e) surveying to re-establish grade; (f) maintenance of streets during construction; (g) sprinkling for dust control; (h) project trailer, if needed; and/or (i) any other incidentals necessary to complete the work, whether directly called out within the plans or implied. 2. Construction Pay Items: Pay items as listed in the proposal shall be measured and paid for in accordance with the applicable measurement and payment paragraphs in the Standard Specifications for Public Works Construction - North Central Texas Council of Governments Fourth Edition, unless modified by these special provisions. All work for this project shall be governed by the Standard Specifications for Public Works Construction – North Central Texas Council of Governments Fourth Edition, the City of Coppell Standard Construction Details (Ord. #2006-1129), and Appendix "C" Design Criteria and Standards in the City of Coppell Subdivision Ordinance (Ord. #94-643), together with any additional Supplementary Conditions, Specific Project Requirements, General Notes or Description of Pay Items included herein. I-1 Pay Item – Furnish, Install, Maintain, and Remove Temporary Traffic Control Devices: This work includes furnishing, installing, and maintaining the required temporary traffic control devices & lane closures (including temporary channelizing devices, signage & traffic barriers as needed) during each phase of construction as shown and/or indicated on the plans or as determined by the Engineer, in accordance with the appropriate details and specifications, including the TMUTCD. This work also includes the use of flagman, if necessary, to control traffic in an orderly manner as it enters, exits and/or passes through the construction area. Measurement and payment for the temporary traffic control devices furnished, installed and maintained, work performed and materials furnished shall be made on the basis of the bid price per lump sum (LS) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete all phases of the work. 5-2 Description of Pay Items Measurement and payment shall be as follows: Sixty percent (60%) of the amount bid shall be paid following the installation and removal of the traffic control devices for the completion of the Illumination pole installations along the West Sandy Lake portion of the project. Forty percent (40%) of the amount bid shall be paid following the installation and removal of the traffic control devices for the completion of the Illumination pole installations along the Freeport Parkway portion of the project. I-2 Pay Item – Installation of Illumination Pole Assembly and Luminaires: This work shall include installation of City furnished Illumination poles, luminaire arms, transformer bases, and luminaires as indicated in the plans. Said pole assemblies and luminaires shall be installed in accordance with City of Coppell standards and the manufacturer’s specifications. This work shall also include: (a) Mobilization, defined as all necessary equipment, supplies, materials, and personnel on the job site ready to begin construction. Contractor is to contact/coordinate with George Marshall, City of Coppell Traffic Engineer at 972-304-3562 at least 48 hours prior to inventory and schedule pick up of the Illumination poles located at 816 S. Coppell Road. (b) Restore parkways and disturbed Areas, or other improved areas that are disturbed to an equal or better condition than prior to construction, in accordance with the appropriate details and specifications, including NCTCOG Items 202.2, 202.3, 202.4, 202.5, 202.6 & 202.7. (c) Performing and passing a 30 day continuous performance test of the lighting system These items of work will not be paid for directly but shall be considered subsidiary to this pay item. Any item indicated in the plans to be directly called out or implied for which there is no specific pay item shall be considered subsidiary to this pay item. Measurement and Payment shall be made on the basis of the bid price per each (EA) complete pole assembly and luminaires of the type specified and shall be the total compensation for furnishing all labor, materials, equipment, and incidentals necessary to complete the work. I-3 Pay Item – Type ‘A’ Ground Box with Apron: This work shall include the furnishing and installation of ground boxes in accordance with TxDOT standards and specification Item 624 "Ground Boxes”, and appropriate TxDOT standard details. Measurement and Payment shall be made on the basis of the bid price per each (EA) and shall be the total compensation for furnishing all labor, materials, equipment and incidentals necessary to complete the work. 5-3 Description of Pay Items I-4 Pay Item – 2” PVC Schedule 40 Conduit (Trench or Bore): This work shall include the furnishing and installation of 2” Schedule 40 PVC conduit (Trench or Bore) in accordance with TxDOT standards and specification Item 618 "Conduit”, and appropriate TxDOT standard details. Measurement and Payment shall be made on the basis of the bid price per linear foot (LF) and shall be the total compensation for furnishing and installing conduit; by jacking, boring, tunneling, excavating, or mounting on structure; furnishing and placing backfill; furnishing and installing mounting brackets; furnishing all labor, materials, equipment and incidentals necessary to complete the work. I-5 Pay Item – 1 Conductor #8 Gauge Bare Wire: This work shall include the furnishing and installation of 1C #8 gauge bare wire in multiple locations of the project in accordance with TxDOT standards and specification Item 620 "Electrical Conductors”, and appropriate TxDOT standard details. Measurement and Payment shall be made on the basis of the bid price per linear foot (LF) and shall be the total compensation for furnishing all labor, materials, equipment and incidentals necessary to complete the work. I-6 Pay Item – 1 Conductor #8 XHHW Wire – Red: This work shall include the furnishing and installation of 1C #8 Gauge XHHW Red wire in multiple locations of the project in accordance with TxDOT standards and specification Item 620 "Electrical Conductors”, and appropriate TxDOT standard details. Measurement and Payment shall be made on the basis of the bid price per linear foot (LF) and shall be the total compensation for furnishing all labor, materials, equipment and incidentals necessary to complete the work. I-7 Pay Item – 1 Conductor #8 XHHW Wire – Black: This work shall include the furnishing and installation of 1C #8 Gauge XHHW Black wire in multiple locations of the project in accordance with TxDOT standards and specification Item 620 "Electrical Conductors”, and appropriate TxDOT standard details. Measurement and Payment shall be made on the basis of the bid price per linear foot (LF) and shall be the total compensation for furnishing all labor, materials, equipment and incidentals necessary to complete the work. 5-4 Description of Pay Items