Loading...
CRDC 14-01CS141006 Michelle Matunas From:Suki Y. Hay <shay@tnpinc.com> Sent:Monday, October 06, 2014 2:20 PM To:George Marshall Cc:Zegeye Gurmu; Chris Schmitt; Robert Jenkins Subject:RE: Bid Documents Attachments:_Combined Contract Doc_Draft.pdf; 100 % SEALED SET.pdf; _Section 6 - Technical Specifications_City Furnished.doc George, Per our discussion. Attached are: 1.Unsealed Contract Docs currently undergoing QAQC 2.Sealed plan set 3.Preliminary Draft of Pole Assembly and LED Luminaire spec for City editing/use (Note: missing gold paint finish, dimmable option, etc.) We will send the sealed contract docs later in the week once the internal QAQC is completed. -Suki Suki Hay, P.E. Traffic Engineer shay@tnpinc.com 817.665.7194 Direct From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Thursday, October 02, 2014 10:10 AM To: Suki Y. Hay Cc: Zegeye Gurmu; Chris Schmitt; Robert Jenkins Subject: RE: Bid Documents Thank You, I screwed up the bid schedule. We will follow the following instead: 1.NTB 10/7 2.Plans and Specs 10/10 upload and add #1 3.10/17 Add #2 4.Pre-bid on 10/21 – 2:00pm and Bid Open on 10/28. If I remember correctly all we need to modify is the NTB. Note that this is now Tuesdays… George Marshall, P.E. Traffic Engineer Engineering Department City of Coppell, TX www.coppelltx.gov 972-304-3562 (office) 469-964-4731 (cell) 1 Please take our customer service survey From: Robert Jenkins \[mailto:RJenkins@TNPINC.com\] Sent: Wednesday, October 01, 2014 3:01 PM To: George Marshall Cc: Suki Y. Hay; Zegeye Gurmu; Chris Schmitt Subject: Bid Documents George, We have incorporated your comments from last week and my review comments. Assuming that you are still planning to put the Bid Notification out tomorrow, we will plan to send you a pdf of the final sealed plans and documents in the morning. Then if you will confirm how many sets you want in your office, we will deliver them on Friday morning. That gives you a brief review time on changes. My comments included two items that I wanted to point out: 1.I changed the contract duration to 60 days in lieu of 120. 2.I chose to use references to TxDOT’s Specification Items 618, 620, and 624 for conduit, electrical conductors, and ground boxes. Although it does not matter so much on this project since the conduit will be in place, we are showing these items by reference in the Pay Item descriptions in lieu of including the Technical Specifications. Unless we hear otherwise we will send pdfs in the morning. Let us know your thoughts if needed. Thanks, Robert Robert W. Jenkins, P.E. Traffic Engineering Manager 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7160 Direct 817.404.2938 Mobile 817.336.2813 Fax rjenkins@tnpinc.com 2