Loading...
CRDC 14-01 CS150128 Michelle Matunas From:Guy Pokhrel <gpokhrel@tnpinc.com> Sent:Wednesday, January 28, 2015 10:20 AM To:Sherri Trahan; Mike Cook; Michael Cook; Stephen McGilvray Cc:Michael Wellbaum; George Marshall; Chris Schmitt; Sean Teague Subject:Utilities-Sandy Lake and Denton Tap Intersection Attachments:1.0 Exhibits-SOUTH DENTON TAP.pdf; 2.0 Exhibits-EAST SANDY LAE.pdf; 3.0 Exhibits- NORTH DENTON TAP.pdf Sherri, Mike, Stephen and George, Please find the attached layout sheets for utilities which shows proposed alignment of each underground utilities. Please note the following,  The utilities conduits will be on top (12” separation) of ONCOR conduits although the alignments are shown next to ONCOR conduits.  We are proposing all utilities conduits to be installed by boring.  All utilities conduits will be parallel and next to each other where possible.  There is no conduit for Time Warner Cable on Sandy Lake as the existing overhead line is abandoned. There are few items (pull box, vaults etc.) missing. We will incorporate those after I get feedback on the proposed alignment. Please take a look and let me know your question or comments. Thank you. Guy Pokhrel, P.E. 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Main 214.988.9923 Direct 214.461.9864 Fax gpokhrel@tnpinc.com 1