Loading...
WA9302A-CS 960416SHIMEK, JACOBS FINKLEA CONSTRUCTION REPORT Project No. 94156 Date: 4/16/96 Prepared Is This A By: Matt Hiekey Working Day? [] Yes [] No Owner: City of Coppell Project Name: Village Parkway Pump Station Addition Construction Contractor: North Texas Municipal Construction Co., Inc Time Allotted: 300 Used: 61 Number Superintendent: Bill Bigham. Men Working: 5+ Hours: 11:45 am to 12:15 pm Weather Conditions: Clear and Cool Site Conditions: Clean and well maintained WORK DESCRIPTION 1. The contractor was working to expose joints on the 15 degree bend on the suction header to determine if the joints are restrained. It appears the joints are not restrained and will require welding so that the bend will be sufficiently restrained during the tapping operation. 2. We did not see any evidence of trench safety around the excavation. 3. NTMCC asked for "As Built" plans for the existing electrical conduits at the site. 4. We delivered a product data sheet for the existing roof material which is to be removed. 5. The taps to the suction header and discharge header are scheduled for Wednesday, April 17, 1996. cc: North Texas Municipal Construction Co.