Loading...
MA 10-07-CS140807JIM BOWMAN CONSTRUCTION COMPANY, L.P. 2716 S. Rigsbee Dr. Plano, Texas 75074 (972) 423-1313 Project Name: Job #969 - Belt Line & MacArthur Brick Paver Replacement Estimate No. 1 Type of work: Concrete Paving contract Date 10 -Jun -14 Estimate Period: July 14, 2014 to August 2, 2014 Contract Amt. $ 599,931.00 Payable To: Jim Bowman Construction Co., L.P. 2716 S. Rigsebee Dr. Measure Plano, TX 75074 item Description Unit of Contract Work Done Total Work Done on Contract Price Amount Measure Quantity This Month Contract 1 Mobilization LS 1 1 1 $30,000.00 30,000.00 2 Prepare and Implement SWPPP LS 1 1 1 $3,000.00 3,000.00 3 Project Signs EA 4 $500.00 4 Remove and Dispose of Brick Pavers SY 2,810 2810.00 2810.00 $4.00 11,240.00 5 Remove and Dispose of Concrete SY 2,810 2810.00 2810.00 $12.00 33,720.00 6 Subgrade Preparation SY 2,589 2589.00 2589.00 $3.00 7,767.00 7 Barrier Free Ramp EA 4 4 4 $1,250.00 5,000.00 8 Pavement Markings LS 1 1 1 $19,600.00 19,600.00 9 Traffic Control LS 1 1 1 $40,500.00 40,500.00 10 Temporary Traffic Signal Riverchase LS 1 0.261 0.261 $90,000.00 23,500.00 11 12" RC Pavement with Monolithic Curb SY 1,705 1701.000 1701.000 $87.00 147,987.00 12 12" Stamped Pavement (15' Bands Only) SY 559 559.00 559.00 $165.00 92,235.00 13 12" Stamped Pavement (Center Detail) SY 218 218.00 218.00 $180.00 39,240.00 14 6" Stamped Pavement (Median Noses) SY 107 107.00 107.00 $142.00 15,194.00 15 4" Concrete Sidewalk SF 900 503.00 503.00 $5.00 2,515.00 16 Sod SF 1,000 1500.00 1500.00 $1.25 1,875.00 New Foundation & Pedestrian Pole & 17 Relocate Push Buttons EA 4 4 4 $3,600.00 14,400.00 18 Traffic Signal Pull Box, Remove & Replace EA 1 1 1 $950.00 950.00 Traffic Signal Pole Foundation Remove and 19 Replace EA 2 $20,500.00 Approved: Total Amount of Work Done $488,723.00 Jim Bowman Const r cti n Company, L.P. Less Retainage 5% $24,436.15 Other Amount Payable on Contract $464,286.85 Less Previous Payments Amount Due This Estimate $464,286.85 Page 1 of 1