MA 10-07-CS140714
FLAGGING REQUEST FORM
To be completed by FWWR
Job name Bowman Const
For questions, scheduling, and
Sub/M.P. Fort Worth 31.2
cancellation:
TWC or Restricted? TWC
Cancellations must be made by phone (no
FWWR Job Number 346
voicemail) 24-hours in advance.
Brief Description Install brick pavers
Est. calendar duration 6
Larry Hopkins
Agreement name, Dart
National Railroad Safety Services
parties, effective date
(m) 214.417.7400, (o) 817-275-6777
CSJ if applicable N/A
Submit form by email to: Bill Parker, Dir.
Planning, wrp@fwwr.net
Current flagging information
within 25’ of center line of track
Flagger required when with men, material or equipment
Flagger may be required at any time work is performed by a third party in FWWR right-of-way
$128.75/hour, eight-hour minimum per day = STANDARD RATE
Terms: Net 30 days, outstanding balances after 30 days will be charged a $25 dollar late fee and finance charge
of 1.5% per month.
ts
Requesting party shall be liable for all attorney fees and costs necessarily incurred to collect overdue amoun
Flagging day (8-hour minimum) includes travel time, job briefing time, flag set up time
Rates include all applicable taxes; flagging billable monthly, Net 30 basis, billed per project agreement
$193.13/hour (1-½ time) from eight to twelve hours = OVERTIME RATE
Projects with a flagging day up to 12 hours per 24-hour period require a single flagger*
Projects with a flagging day from 13 to 16 hours per 24-hour period require two eight-hour flagger shifts
Projects with a flagging day from 16 to 24 hours per 24-hour period require three eight-hour flaggers shifts
Flagging should be scheduled no less than 48-hours in advance
Cancellations must be made by phone (no voicemail) 24-hours in advance
To be completed by Requestor
***************MUST COMPLETE “BILL TO PARTY” OR REQUEST WILL BE DENIED***************
Company Name Jim Bowman Construction Co., LP
Contact Name/Title Adrian Bowman, General Manager
Phone numbers 214-535-6588 Mobile / 972-423-1313 Office
Email Address adrian@bowmanconstruction.com
Fax Number 972-423-1313
Mailing Address for 2716 S. Rigsbee Dr.
Invoices, This the Plano, TX 75074
“BILL TO PARTY”
Brief Description of Barricading, Removal, and Replacement of all concrete pavement in the
Planned Work. Note intersection of Belt Line Road and MacArthur Blvd for the City of Coppell.
portions within 25’ of
center line.
Recommend
attaching exhibit with
submittal of this form.
R.R. M.M. or Xing Xing immediately north of Beltine Rd. on MacArthur Blvd – City of Coppell
Estimated Duration Monday, 7/14 from 9am to 5pm for barricading and pavement removals
Is T.R.O.E. done ?
FWWR 010 238 03/13/2014