Loading...
WA9302A-CS 960409SHIMEK, JACOBS FINKLEA CONSTRUCTION REPORT Project No. 94156 Date: 4/9/96 Prepared Is This A By: Matt Hiekey Working Day? [] Yes [] No Owner: City of Coppell Project Name: Village Parkway Pump Station Addition Construction Contractor: Noah Texas Municipal Construction Co., Inc Time Allotted: 300 Used: 54 Number Superintendent: Bill Bigham. Men Working: 2 Hours: 9:00 am to 9:30 am Weather Conditions: Clear and Cool Site Conditions: Clean and well maintained WORK DESCRIPTION 1. Several piping options for Pumps 5 & 6 were reviewed with Ted Dutt and Larry Davis. The City was in agreement that the piping for Pump 5 shall remain the same while the taping sleeve for Pump 6 shall be placed on the bend of the discharge header. Placing the tapping sleeve on the discharge header bend required one additional piping bend. 2. T.U. electric has repaired the damaged transformer. 3. Ted Dutt was expecting to shut down the pump station so that the relocation and electrical connections of the electrical duct bank could be completed. cc: Noah Texas Municipal Construction Co.