Loading...
DFW Trade B4-CS 970117 01-21-07 A10:33 IN A Future With A Past January 17, 1997 Mr. Matt Goodwin Goodwin and Marshall, Inc. 6001 Bridge Street, Suite 100 Ft. Worth, TX 76112 Fax: (817) 446-3116 Re: Construction & Platting Issues: Lots 1 and 2, and Tract A, Block 4 D/FW Trade Center Dear Mr. Goodwin: This letter is being sent to document the January 6th, 1997 meeting at our office with you, Ken Griffin (City of Coppell), Scott Dyer, Ed Kellie, John Robertson, and me. Listed in the first review letter for the final plat of the above referenced lots were a number of issues which were discussed and now require some clarification and corrections. This letter is to supersede the platting comments and miscellaneous comments issued in the previous letter. If we are not in agreement on any of the issues listed below, please call Scott Dyer to resolve any disagreement. The majority of these issues are merely clarifications or corrections. THE CITY OF GRAPEVINE PUBLIC WORKS DEPT. P.O. Box 95104 - Grapevine, Texas 76099 · Phone Metro 817/481-0372 · Fax 817/481-0369.~ Mr. Matt Goodwin January 17, 1997 If any additional comments arise, you will be notified as soon as possible. If you have any questions regarding these comments, please call me at (817) 481-0372. Sincerely, Mark C. Fredricks Graduate Engineer/Development cc: Plat File Mr. Kenneth Griffin, City of Coppell, P.O. Box 478, Coppell, TX 75019-0478 Mr. Doug Johnson, Industrial Developments International, 5420 LBJ Freeway, Suite 1275, Dallas, TX 75240 O: ~latling~.Iaa96~D FWI~4 .Rv2 D/FW Trade Center Lots 1, 2, and 3, Block 4 Issues January 17, 1997 OUTSTANDING ISSUES: * This plat needs to be approved by both the City of Grapevine and the City of Coppell prior to filing. The City of Grapevine will require one mylar with all signatures for our records. This plat will need to be filed with Dallas County by Goodwin and Marshall. * Per the Interlocal Agreement between the Cities of Grapevine and Coppell, the following applies to the site: 1. All building inspections will be made by Grapevine. Building inspection fees will be payable to the City of Grapevine. 2. The City of Grapevine standards will apply to all public street construction. Plans for Patriot Drive shall conform to the City of Grapevine standards. The City of Grapevine requests the following items be addressed during preparation of these plans: A. Supply the 100-year water surface elevation and velocities in Denton Creek adjacent to Patriot Drive. B. Maintain 1' of freeboard above the ultimate 100-year water surface elevation for the elevation of Patriot Drive. Note Revision: Discussions indicated that the main channel of Denton creek is 100+ feet from the edge of the property. The drainage easement on site is overflow from the main channel in the event of a major storm. The City will review the water surface elevations under ultimate conditions and make any necessary recommendations on slope protection. Note Correction: The City of Grapevine will not charge a 25 % surcharge on impact fees for property within Coppell. No impact fees are required. Clarification: Per discussion, the drainage easement for the plat will be defined based on the current fill and existing 100 year flood elevation. The f, liatiag conditions for post development will be submitted to FEMA. A revised model with ultimate development flows and post-construction grading will be submitted to our office during construction. Additional drainage easement (if any) will be added by Amended Plat. D/FW Trade Center Lots 1, 2, and 3, Block 4 Issues January 17, 1997 * It is our understanding that the triangular piece of property at the intersection of Patriot Drive and S.H. 121 Frontage Road is being platted as part of Tract A. * Specify the amount of square footage of each lot (and Tract A) that is in the City of Coppell and the City of Grapevine. GENERAL COMMENTS * Twenty-five (25) foot high, metal poles, with 175 watt, metal halide street lights are required at all intersections, ends of all cul-de-sacs and at mid block where the distance between intersections is more than 500 feet. These costs shall be paid (to T.U. Electric) by the developer prior to final acceptance of the improvements. The street light "layout" shall be submitted to the Public Works Department for review prior to Final Acceptance of this Subdivision. * A 6' sidewalk shall be constructed by the developer along Patriot Drive. The developer/owner shall also construct the barrier-free ramps at all street intersections with the paving of the streets. (Re: attached Barrier-Free Ramp) * The Street Sign Fee for the subdivision is $110.00 (2 intersections x $55 per intersection). The Street Sign Fee is due prior to the final acceptance of the public improvements by the City. O:~Platting~Jan96~DFWBk4.RV2