Loading...
WA9302A-CS 960402SHIMEK, JACOBS FINKLEA CONSTRUCTION REPORT Project No. 94156 Date: 4/2/96 Prepared Is This A Owner: City of Coppell Project Name: Village Parkway Pump Station Addition Construction Contractor: North Texas Municipal Construction Co., Inc Time Allotted: 300 Used: 47 Number Superintendent: Bill Bigham. Men Working: 4 Hours: 9:40 am to 10:00 am Weather Conditions: Clear and Cool Site Conditions: Clean and well maintained WORK DESCRIPTION 1. T.U. Electric will begin repairing the damaged transformer on April 3, 1996. The T.U. representative and the North Texas Municipal Construction Co. electrical sub-contractor Texsun, indicated that delivery of the wire was scheduled for April 2, 1996. T.U. Electric and Texsun indicated that they would have the project superintendent contact Ted Dutt and inform him of the pump station shutdown. 2. The silt fence containing the soil debris in the northwest comer of the job site will need to be repaired. 3. The electrical sub-contractor was pulling wire through the relocated electrical duct bank. cc: North Texas Municipal Construction Co.