Loading...
Re Field Report No 2This is the first I heard that the city was expected to provide a temporary alternative to the school flasher. We will need to look into that issue. The city has ordered new flashers that we will supply to the contractor for installation rather than having to relocate the existing flashers. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Rodriguez, Jorge" <jrodriguez@halff.com> 10/1/2009 10:02 AM >>> Hi guys I attach the field report No. 2 and several pictures for your use and record. Please call me if any question. Picture 001: Water service connection to the north. Picture 004: Water pipe and bedding. Picture 006: Equipment, laborers and Fire Hydrant installed. Picture 009: Storm outlets at the creek. Picture 013: Sanitary Sewer connection to existing manhole. Picture 014: Storm Drainage Manhole. Picture 016: Grading and equipments. Picture 028: Water valves at Sta. 0+0.00 (Connection point). Picture 030: Pole inclined feeding lighted school sign. Picture 031: Grading and gravel stockpile. Thanks Jorge Rodriguez, P.E. Project Manager HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214-346-6203 Fax 214-739-0095 www.halff.com