DetourGentlemen, I received a call this evening from the Deputy Fire Chief concerning the quality of the current detour in use on Southwestern Blvd. The Fire Department is concerned about potential damage to their apparatus, and the possibility of a delayed response to a critical incident as a result of the condition of this detour. As most of you know the city went to considerable additional expense to ensure that this road would remain open for the duration of construction. The sole reason for that was the fire station. We need to improve the condition of this detour as soon as possible, and maintain it in an acceptable condition for the duration of its use. I am happy to coordinate a meeting with the Fire Department to discuss their specific concerns if needed. Feel free to contact me to discuss this matter. Keith -----Original Message----- From: "Matt Oyen" <MattO@PacTrust.com> To: Keith Marvin <KMARVIN@ci.coppell.tx.us> Cc: Dave Littleton <dlittleton@halff.com> To: Jorge Rodriguez <jrodriguez@halff.com> Cc: Kody Harris <kharris@lhlacy.com> Sent: 12/11/2009 11:38:34 AM Subject: RE: HDPE alternative This solution of utilizing HDPE pipe with a concrete collar at the transition is acceptable to PacTrust. However, we would obviously defer to the City for approval of the temporary alternate native for piping over the existing AT&T duct bank. Thanks, Matthew Oyen, PE Construction Manager Pacific Realty Associates, L.P. (PacTrust) 15350 SW Sequoia Pkwy, Suite 300 Portland, OR 97224 Office: 503 624-6300 Cell: 503 523-7619 matto@pactrust.com ________________________________ From: Rodriguez, Jorge [mailto:jrodriguez@halff.com] Sent: Friday, December 11, 2009 9:23 AM To: Matt Oyen; Keith Marvin Cc: Harris, Kody; Littleton, Dave Subject: HDPE alternative Hi guys I attach a temporary alternative using HDPE pipe at AT&T crossing location. Also, as the flow line at the existing Box Junction Box is a little higher than shown on the plans, I had to raise the flow line of Lat B-5 wye inlet as shown. The sketch shows the adjusted flow lines from Sta. 0+00.0 to Lat B-5. If this alternative is acceptable, please disregard the previous ones I sent. Please call Dave Littleton at 214-346-6213 or me if any question thanks Jorge Rodriguez, P.E. Project Manager HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214-346-6203 Fax 214-739-0095 www.halff.com