Loading...
Re Southwestern Blvd 24 Water Line at BridgeI have not been able to view the attachment, but I have sent it on to our public works department for review. If we have more accurate information I will send it to you. We will also go out to the field and investigate this location. We have a vac truck, and we may be able to expose the line and have your surveyor come out and take some shots on it. I'm in class today and tomorrow, but I'll get back with you either tomorrow afternoon or Monday. Keith -----Original Message----- From: "Smith, Madonna" <msmith@Halff.com> To: Keith Marvin <KMARVIN@ci.coppell.tx.us> Cc: Dave Littleton <dlittleton@halff.com> Sent: 5/15/2008 1:02:04 PM Subject: Southwestern Blvd. 24" Water Line at Bridge Keith, The attached .pdf shows the Southwestern Blvd. proposed bridge abutment shaft and the 24" water to be very close to one another. The 24" is shown based on record information from the City and field surveyed valve locations. The pdf is not to scale, but there is less than 1' of clearance between the two. It may be possible to modify the abutment to avoid the water main, but we will need to know the exact horizontal location of the pipe. The alternative would be to relocate a portion of the 24" water main in Southwestern to eliminate the conflict with the proposed bridge abutment. I can, with your approval, have our SUE group perform the locate. We do not have a budget in the contract for this type of work, and I've received an estimate of $2,000 max to locate the water main. The maximum fee is based on needing to use the vac truck due to the excessive depth (15 ft) at this location. I will call you to follow up and get your direction on how you would like us to proceed. Thanks, Madonna Madonna Smith, P.E. Project Manager HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214-217-6688 Fax 214-739-0095 www.halff.com