Loading...
Re COPPELL ROAD SOUTHMarty, I'm having a hard time justifying the expense. I think we should do something from the top of the headwall to the edge of the slope of the yard. I do not think we should bring it into the yard, and especially not all the way to the asphalt. The driveway itself is covered under pay item # 129. My estimate is it would take about 9 tons to cover this area. The proposed cost of $100/ton seems high to me. If we can cover the area described above for $500 then I would authorize you to proceed. Call me in the office to discuss this. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Marty Murphy" <Martym@JRJPaving.com> 1/11/2010 2:12 PM >>> Any news on the rip rap at the end of Mitchell, I have a crew that can install this week if we get the approval. Marty Murphy, Business Manager JRJ Paving, L.P. 1805 Royal Lane, Ste. 107 Dallas, TX. 75229 214-466-8340 214-466-8354 fax