Eckerd's-LR 990505 GEOTECHNICAL ENGINEERING
GEE Consultants, Inc.
CONSTRUCTION MATERIALS TI:STING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Report Date: May 5, 1999 Date Concrete Placed: April 12, 1999 Standard 6"x12"
Client: North American Properties-SW Area 28.27 Square Inches
project: Eckerds - Coppell Concrete Report No.: 20
Contractor: C.A. Walker Project No.: 298-0412
Concrete Supplier and Plant: TXI #41
Location of Placement: Sidewalk
MATERIALS ~ ..... ssn ~a~., '~'~. OBSERVA. TION DATA
Descr,p:mn . Lbs~CuYd~
Mix Number: 8203 Time Sample Batcbed: 11:33 am
Cement: Time Sampled: 12:25 pm
Sample Location: North entrance-sidewalk west side of ramp
Fly Ash: Track/Ticket No: 450/1285924
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 82°F
Pine Aggre~,ate: Concrete Range: §4°F
- Slump Range (inches~: ?s6"
Admixtures: Weather Conditions: Clear
I Time Started: 11:00 am
2 Time Completed: 02:00 pm
Added Water: -t Gallons Sample Air Content (%): N/A
Total Cubic Yards Placed: 20
Required Strength i Lbs./sq.in.): 3.000
.~peclmen .Measured Age Date Total Load Compress~,e Strennm Re.marks
Number S:umo, ~a. ) ; Days ~ Tested ~ Lbs. ~ ( Lb~. 'Sq. In. )
ECK 7'7, 23 05/05/99 87,380 3,090
ECK 78 28 05/10/99
? 1./-~"
ECK 79 28 05/10/99
ECK 80 H HOLD
Tes~ Methods Utilized Fracture Regular Cylinders Made By: 'ga
ASTM C-3[.C-39.C-14.3 ,Unless No,ed Otherw~sel
Remarks and/or Distribution:
cc: Mr. John Maggiore - North American Properties -SW
Mr. Lance Lilly - Richmond Group Architecture & Planning
Mr. GaD' Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppell
Mr. Larry. Davis - City of Coppell
our prim' written approval. Our 1etters and tepo~s apply o~ly to the sample ~.e. sted ired/or observed a~l are no~ necessarily indlca6ve of the quanuties of appa~arJy idenucal or simdat prOaucm.