Loading...
Eckerd's-LR 990505 GEOTECHNICAL ENGINEERING GEE Consultants, Inc. CONSTRUCTION MATERIALS TI:STING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: May 5, 1999 Date Concrete Placed: April 12, 1999 Standard 6"x12" Client: North American Properties-SW Area 28.27 Square Inches project: Eckerds - Coppell Concrete Report No.: 20 Contractor: C.A. Walker Project No.: 298-0412 Concrete Supplier and Plant: TXI #41 Location of Placement: Sidewalk MATERIALS ~ ..... ssn ~a~., '~'~. OBSERVA. TION DATA Descr,p:mn . Lbs~CuYd~ Mix Number: 8203 Time Sample Batcbed: 11:33 am Cement: Time Sampled: 12:25 pm Sample Location: North entrance-sidewalk west side of ramp Fly Ash: Track/Ticket No: 450/1285924 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 82°F Pine Aggre~,ate: Concrete Range: §4°F - Slump Range (inches~: ?s6" Admixtures: Weather Conditions: Clear I Time Started: 11:00 am 2 Time Completed: 02:00 pm Added Water: -t Gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 20 Required Strength i Lbs./sq.in.): 3.000 .~peclmen .Measured Age Date Total Load Compress~,e Strennm Re.marks Number S:umo, ~a. ) ; Days ~ Tested ~ Lbs. ~ ( Lb~. 'Sq. In. ) ECK 7'7, 23 05/05/99 87,380 3,090 ECK 78 28 05/10/99 ? 1./-~" ECK 79 28 05/10/99 ECK 80 H HOLD Tes~ Methods Utilized Fracture Regular Cylinders Made By: 'ga ASTM C-3[.C-39.C-14.3 ,Unless No,ed Otherw~sel Remarks and/or Distribution: cc: Mr. John Maggiore - North American Properties -SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. GaD' Stokes - C.A. Walker Construction Mr. Lee Stone - City of Coppell Mr. Larry. Davis - City of Coppell our prim' written approval. Our 1etters and tepo~s apply o~ly to the sample ~.e. sted ired/or observed a~l are no~ necessarily indlca6ve of the quanuties of appa~arJy idenucal or simdat prOaucm.