Loading...
Re Downstream AssessmentThanks Morgan. We'll look this over. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Morgan McDermott" <mem@freese.com> 4/16/2008 2:56 PM >>> Keith- Attached is our documentation of the downstream assessment. It should be noted that the drainage areas mentioned (15A and 15B) reflect as-built plans and future roadway plans for Coppell and Bethel Road by FNI. The results show that the proposed site does not cause increase in stream flow at the outfalls. FNI plans on upgrading the infrastructure along Bethel and Coppell Roads to verify that the increased runoff will be conveyed to Tributary G-1, in which case detention on the site is not required. Please feel free to call myself or Mike with any questions. Thanks! Morgan McDermott, P.E., CFM Freese and Nichols, Inc. 1701 North Market Street, Suite 500 Dallas, Texas 75202 * 214-217-2200 (office) * 214-217-2201 (fax) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation.