Eagle Point-CS 930915OOPpBI'.I', PI:JB~IC WORKS
D&TBI
TOt
FROM:
~eptember 1§, 1993
~mrr¥ Davis, Construction Xnspector
Howard L, Pa££ord, U~lll~les Superintendent
Walk-through of Eagle Po£nt Estates
Field personnel performed a final walk-~hrough of tl~e above
referenced project ~his morning. Below I have listed those items
i + 47.00 Line E - Manhole in street needs to be
poured.
pebble Cresk ~ Long Meadow - Main line valve in street
needs poured.
0 + 00 Line E - Manhole needs poured in etreet~ alee
check for inflow,
Wilshire & Falls Road - Main line valve in street needs
poured.
Station ~6 + 02.18 Line 6 - Manhole needs poured in
street,
6. Sra. #4 + 54.10 - Manhole need~ poured in street,
Falls Road & Lon~ Meadow - Main line valve needs poured
in street.
Please ensure that each of these items are corrected pr~or to
n~epta~ o~ thi~ proJeGt,
H~P/dm
WALKTHRU.MLP/EAGLEPT.HLP