Loading...
Vista Point II- LR140611American sdX31 's Rehab Ar Inspections INC (214) 536-2915 LOW PRESSURE AIR TEST FOR GRAVITY SArIITAIA _ ft S31 � Test Procedures : Each section of sewer shall be tested between successive manhole Z�-�,, Air shall be introduced into the pipeline until 4.0 psi gauge pressure has been reach ,r At that time the flor shall be reduced and the internal air pressure shall be maintained between 3.5 and 4.5 psi gairat least two (utes to allow the air temperature to come to equilibrium with the temperature of the pipe walls. Pres ilgj1 be constantly monitored by a gauge and hose arrangement separate from the hose used to introduce air mlb ei-m'e. Pressure in the pipe shall not be allowed to exceed 5 psi. After the temperature has stabilized and no air leaks at the plugs have been found, the air pressure shall be used to determine that time lapse required for the air pressure to drop to 2.5 psi gauge. If the time lapse required for the air pressure to decrease from 3.5 to 2.5 psi exceeds that shown in the following table, the pipe shall be presumed to be within acceptable limits for leakage. If the time lapsed is less than that shown in the table, the contractor shall make corrections to reduce the leakage to acceptable limits. Contractor: Barbosa Date: 6/11/14 Project: Children's Learning Adventure Job#: Location: Tested By: Oscar Inspector: Rick O'Dell City Of. Coppell Line Information Test Results Air Test Mandrel Line Station to Station Size Linear Feet Time Passed Passed A 3+66-3+39 10" 23 9:27 Yes Yes 3+39-0+00 IV 333 9:27 Yes Yes Contractor: Barbosa Date: 6/11/14 Project: Children's Learning Adventure Job#: Location: Tested By: Oscar Inspector: Rick O'Dell City Of. Coppell American Rehab & Inspections, INC. (214) 536-2915 MANHOLE VACUUM TEST R Test Procedures Sd7- �$IQi10IAI® JNI1S31 Vn Plug all manhole entrances and exits other than the manhole top acceing suitably sized �umatic or mechanical pipeline plugs. Install the vacuum tester head assembly at the top acf marsh < <ttach vacuum pump to test head and start pump. Open Inlet/outlet ball valve and evacuate the m"eo `Hg. approximately negative 5 PSIG, 0.3 bar) Close vacuum inlet/outlet ball valve and monitor vacuum for specified test period. MANHOLE NUMBER HG.PSIG TIME PASSED A 3+66 -10 60 Sec Yes A 3+37 -10 60 Sec Yes A 0+00 -10 60 Sec Yes Contractor: Barbosa Date: 6/11/14 Project: Children's Learning Adventure Job#: Location: Tested By: Oscar Inspector: Rick O'Dell City Of : Coppell