Eckerd's-LR 990401 (2)· G · GEOTECHNICAL ENGINEERING
E[ · ENVIRONMENTAL CONSULTING GEE Consultants, Inc.
E · CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REPORT OF CONCRETE MIX INSPECTION
Report Date: April I, 1999 Date Concrete Placed: March 4, 1999 Standard 6'x12"
Client: North American Properties-SW Area 28.27 Square Inches
Project: Eckerds - Coppell Concrete Report No.: 17
Contractor: C.A. Walker Pr~oe'cI X,,. 298-04 12
Concrete Supplier and Plant: TXI Plant/#31
Locatwn of Placement: Paving
MATERIALS ~ ...... ,SD ~a:~,, ,~,. INSPECTION DATA
Dcscr:puun , Lbs~CuYd~
M~x Number: .'~203 Time Sample Batched: 08:55 am
Cement: Time Sampled: 10:00 am
Fly Ash: Sample Locatmn: 45' S. ~ 20' W ,,: SE .ortl~r ..~ hulidlnu
'Frock!Ticket No: 815/12565'.12
Coarse Aggregate: Temperature:
Inte~ediate Aggregate: Ambient Range: 76'F
Fine Aggregate: Concrete Range: ~5~F
Admixtures: Slump Range (~nches}: 6"
Weather Condmons: Clear
1 Time Started: 06:uO am
2 Time Cmnpleted: i 1:30 am
Added Water: ~ Ciallon~ Sample ..Mr CoHtent, % ;: 5 %
Total Cubic Yards Placed: 130
Reqmred Strength ~ Lbs. 'sq.m. ~: 3.000
%tuber '~lu:n3, ,::. · Days ~ 'res~ed , Lbs.. -bs.:Sq. hi.)
ECK 65 7 03/11,.'99 72.120 2.550
ECK 66 28 04/0 !..'99 101. 140 3,580
ECK 67 28 04/01/99 97,520 3,450
ECK 68 H HOLD
hSTM C-3[.C-39.C-;43 -Umess Noted Otherv.'~se~ Cylinders Made By: aG
Remarks andmr Distnbunon:
cc: Mr. John Maggiore - North American Properties -SW
Mr. Lance Lilly - Richmond Group Architecture & Planning
Mr. Gary Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppell
Mr. Larry Davis - City of Coppell
~ CO~I~]~t~][~C~ ~. Rev~d ~: -