Loading...
Westhaven 2- CS150326Kimley»>Horn Date: March 26, 2015 Job Number: 064447702 Project Name: Westhaven Phase 2B Transmittal To: Mr. George Marshall City of Coppell 265 Parkway Blvd. Coppell, TX 75019 972.304.3679 We are sending these by ❑ U.S. Mail ❑ FedEx ® Hand Deliver ❑ Other: We are sending you ® Attached ❑ Under separate cover via the following items: ❑ Shop Drawings ® Prints/Plans ❑ Samples ❑ Specifications ❑ Change Orders ❑ Other: Copies Date No. Description 1 set 3/27/15 01 City Mark -Ups 2 sets 3/27/15 02 Revised Plans 1 03/27/15 03 Street Capacity Exhibit 1 03/27/15 04 Comment Response Letter These are transmitted as checked below: ❑ For your use ❑ Approved as submitted ® Resubmit ® As requested ❑ Approved as noted ❑ Submit ❑ For review and comment ❑ Returned for corrections ❑ Return Remarks: Thank You, Copy to: L_ 71 pw,, 2c9l'S Signed Mark Harris, P.E. ❑ Copies for approval ❑ Copies for distribution ❑ Corrected prints Kimley»>Horn March 25, 2015 Mr. George Marshall City of Coppell 265 Parkway Blvd. Coppell, TX 75019 RE: Westhaven Phase 28 Dear Mr. Marshall: This letter is in response to your comments received on March 6, 2015. The following items have been addressed as per the referenced review: Plat - Show existing sewer easement down Windsor Road. (How will this be abandoned?) Response: Existing sanitary sewer easement has been shown as requested. Easement will not need to be abandoned as city R.O.W. will be dedicated over the same alignment. 2. Revise labels for "Future Phase 1" as Existing Phase 1. Response: Phase 1 label has been updated to call out existing phase 1 recording information. Paving Plan - 3. Show street intersections & PCI's in profile as well as plan view. Response: Road profiles have been updated to show the intersections as requested. 4. Paving notes references a sheet that does not exist. Response: Paving notes have been updated to reference the correct sheet. 5. Provide only one crosswalk location along Swearingin Road. Keep it lined up with trail. (grading plan seemed to show it correct) Response: Paving plans have been updated to show the barrier free ramps in the correct location. Drainage and Storm Drain Plan - 6. The 4 inlets along Swearingin Road need to be adjusted so the water along Wingate & Windsor does not have to follow the curb line around the tight corner. (or add additional inlets on Wingate & Windsor) Response: Swearingin and Wingate Road's street grades have been adjusted to provide -1.0% grade around the knuckle in drainage area R-2 to improve drainage. Adjusted street grades also reduced the size of drainage area R-2 to decrease the amount of flow coming to those inlets. Q-2 remains unchanged due to the low flows provided in that drainage area. Genesiskimley horn.com 1, 5750 00 Frisco, TX 75034 K:\FRI_Civil\64447702\Admin\Correspondence\Letters-Memos\Phase 2\20150324_Response Letter- Westhaven Phase 2B - First Round of Comments.doc Kimley>>)Horn Page 7. Q-2 & R-2 & S-1 appears to exceed street capacity. Response: Drainage areas have been adjusted so that street capacity has not been exceeded. A drainage area exhibit has been provided with this submittal showing the drainage sub divides to illustrate this. 8. Calcs for SD -Q indicate a 42" RCP however the profile labels a 48" RCP. Response: Calc's and profiles have been updated to call out 42" RCP in all locations. 9. On storm drain profiles show the existing sewer & services installed in earlier phase & label in profile as existing. Response: Existing sanitary line has been called out in profile view as requested. Water Plan - 10. The water line at the intersection of Johns Avenue & Wingate is right on the ROW line. Can this be shifted or provide an easement on lot? Response: Water line has been shifted south to move it away from the ROW and remove the need for an easement. 11. There is a waterline at inlet detail on this sheet however the inlets are not shown on the plan. Response: Inlets have been shown on the water plan. Sanitary Sewer Plan - 12. Call out size of sewer manholes. Response: Sewer manhole sizes have been called out requested. 13. Please include the as -built sheets for the existing sewer for reference in this set. Response: As -built sheets have been added to the set as requested. Miscellaneous - 14. Has the street light plan been submitted to Oncor? Response: Street light plan was sent to Oncor on 3/25/15. 15. Be sure to not install signs on street lights. Response: A note has been added to the sheet specifying, "No signs to be installed on light poles." 5750 Genesis Court, Suite 200, Frisco, TX 75034 Kimley>>> Horn Page 16. SWPPP - the storm drain outfall into the pond will need some sort of protection. Response: Storm outfall is under the normal pool elevation of the pond and above the bottom of the pond and therefore will not need any protection. Normal pool elevation has been shown on the profile to demonstrate outfall's location. 17. Remove all City standard details from the plans. All contractors must have our current set of construction detail s on the job. Response: City details have been removed from the plan set as requested. Please contact me at (972) 335-3580 or mike.molge(o-)kimley-horn.com should you have any questions. Sincerely, //-I- /Ntl-- Mike Molge, E.I.T.