Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CRDC 14-01 CS150330
Opinion of Probable Construction Cost np teague nail & perkins Client: City of Coppell March 30, 201 Project: Sandy Lake and Denton Tap Intersection Improvements (Paving and Utility) TNP TNP No.: CPL14141 -- 90% SUBMITTAL Title: Intersection Improvements 1 No. Item Description Item Cost INTERSECTION IMPROVEMENTS - DTR/SLR 1 Mobilization $23,000.00 2 Demolition Removal $62,049.00 3 Utility $17,060.00 4 Pavement $150,864.00 5 Relocate overhead utilities > } Coi ✓,` �'--- $486,035.00 SUBTOTAL $739,008.00 15% Contingency $110,851.20 $849,859.20 DENTON TAP ROAD ILLUMINATION 1 Light foundations $123,000.00 2 Poles Luminaaires $492,000.00 3 Conduit $96,225.00 4 Ground Box Wire $62,707.00 5 Power Service Equipment $42,000.00 SUBTOTAL $815,932.00 15% Contingency $122,389.80 $938,321.80 DENTON TAP ROAD / SANDY LAKE ROAD STREETSCAPE 1 Mobilization (5%) $98,711.20 2 Demolition Removal $151,292.00 3 Planting $578,816.00 4 Hardscape Fencing $354,614.00 5 Hardsca e - DTR SLR -- ALLOWANCE $100,000.00 6 Planting Misc $194,491.00 7 Irrigation $197,495.00 8 Sandy Lake Road refurbishment $397,516.00 SUBTOTAL $2,072,935.20 15% Contingency $310,940.28 $2,383,875.48 SUBTOTAL CONTINGENCY TOTAL $ 3,627,875.20 $ 544,181.28 $ 4,172,056.48 ❑ No Design Completed ❑ Preliminary Design Final Design