Cozby Remodel-CS150720
8350 N Central Expwy ■ Suite 1000 ■ Dallas, TX 75206-1612 ■ T: 972.235.3031 ■ F: 972.235.9544 ■ pkce.com
July 20, 2015
PK No.: 3593-14.414
Mr. Michael Garza, P.E.
Assistant Director of Engineering
CITY OF COPPELL
255 Parkway Boulevard
Coppell, Texas 75019
Re: WILLIAM T. COZBY LIBRARY
Coppell, Texas
Dear Mr. Garza:
This letter is to notify you that the enclosed Construction Plans have been revised in accordance
with your June 11, 2015, Review Memorandum. The following items have been addressed as per
the referenced review:
GENERAL
1. Add mayor and council to the cove page.
Response: Addressed.
DIMENSION CONTROL PLAN
2. Wrong way entry may still be an issue.
Response: Signage is being shown on architectural plans to control traffic flow.
3. Show the city of Coppell fiber optics along Heartz and the back of the library.
Response: Added per CAD files received from the City of Coppell.
SANITARY SEWER
4. Check the slope of the 4” sewer service, I believe the minimum requirement is 2%.
Response: Per TCEQ 4” site sewer can be min. 1% slope.
PAVING PLAN
5. Where is the sidewalk connection from the trail around the school to the library? Are there
stairs at the end of the sidewalk on the southwest corner? Should there be ADA accessibility?
Response: This has been coordinated between library staff and building staff.
Mr. Michael Garza, P.E.
July 20, 2015
Page 2
6. Include stamped concrete at the drive entrance per detail 2150-1.
Response: Addressed.
If you have any questions or need any additional information, please call at your earliest
convenience.
Sincerely,
Grant S. Clay, P.E.
GSC/smm
3596-14.414_Comment Response Letter