Eckerd's-LR 990330· G · GEOTECHNICAL ENGINEERING
I Ej. ENVIRONMENTAL CONSULTING GEE Consultants, Inc.
E- CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (2! 4) 352-6972
REPORT OF CONCRETE MIX INSPECTION
Report Date: March 30, 1999 Date Concrete Placed: March 9, t999 Standard 6'x12"
Client: North American Properties-SW Area 28.27 Square Inches
Project: Eckerds - Coppell Concrete Report No.: 15
Contractor: C.A. Walker PmjeLt No.. 298-0412
Concrete Supplier and Plant: TXI Plant/#41
Loc:mon ot Placement: Pavement
MATERIALS s .... - ~s~ B~,, w,,. LNSPECTION DATA
Mix Number: '1203 Time Sample Berthed: :0:25 am
Cement: Time Sampled: I i. 15 am
Fly Ash: Sample Locauon: 65' W. ~ g' S. ,n NW corner ,~t imildmg
Track/Ticket No: ~37:'. 254
Coarse Aggregate: Temperature:
h~termed~ate Aggregate: Amment Range:
Fine Aggregate: Concrete Range:
Adnuxmres: Slump Range ,inches}: 4~i"
Weather Condinm~s: Cloudy
~ Time Started: 10:t~) am
2 Time Cm~pleted: ~3:~} pm
Added Water' 20 Gallons Sample :Mr C,,ntent, % 3. ~ :a ~';
Tntal Cubic Yams Placed: 20
Reqmred Strengm, Lbs.. ~q.m..' 3
ECK 57 7 03,.'09/99 68,240 2.410
ECK 58 28 03/30/99 104,460 · 3.700
43..;"
ECK 59 28 03/30/99 104,400 3.690
ECK 60 H HOLD
!'est Me:h(~.ts L'~fi~zea Fracture Regular Cylinders Made By: RB
&STM C'-3;.('-39.C'-:z5 Unless Nome Otherwise! '
Remarks and;or Distribution:
cc: Mr. John Maggiore - North American Properties -SW
Mr. Lance Lilly - R~chmond Group Architecture & Planning
Mr. Gary Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppeil
Mr. Lar~' Davis - City of Coppell
A:I let[ers a~ re~r[s arc :~ :he cxc:us~ use of ~ client to w~m they ~e add~s~ a~ s~ll ~ ~ rep~ed ~t t~ lull e. ppr~al m GEE Comu,[an~. I~. The ~se ~,t uur amc :'~ust