Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Eckerd's-LR 990329
G · GEOTECHNICAL ENGINEt-KING E GEE Consultants, Inc. E · CONSTRUCTION MATERIALS TFSTING 10046 Monroe Drive · Dallas, Texas 75229 ° (214) 352-5433 · Fax (214) 352-6972 PIER INSPECTION REPORT Report Date: March 29, 1999 Inspection Date: March 2'4. 1999 Client: North American Properties-SW Pier Inspection Report No.: Project: Eckerds - Coppell Page Number: Page 1 of 1 Identification: Belled Piers Project Number: 298-04!2 Method of Test: Visual Pier Shaft Bell Total Bearing Casing # Size Size Depth Material Depth Remarks 13A * 24" 48" 10'6" Gray Sandy Clay N/A Clean, Dtw,. Plumb 13A * 24" 48" 10'0" Gray Sandy Clay N/A Clean, Dr,,'. Plumb 13A * 24" 48" 10'4" Gray Sandy Clay N/A Clean, Dr,,,. Plumb I3A * 24" 48" 10'4" Gray Sandy Clay N/A Clean. Dr3'. Plumb 13 B ~ 32" 48" 10'2" Gray Sandy Clay N/A Clean Dr,,'. Plumb Wall Pier ~* 18" 48" 11'0" Gray Sandy Clay N/A Clean. Dry. Plumb Wail Pier ~x 18" 48" 9'6" Gray Sandy Clay N/A Clean, Drx,. Plumb Wall Pier x~ 18" 48" 9'4" Gray Sandy Clay N/A Clean Dry. Plumb Wall Pier ~' 18" 48" 9'5" Gray Sandy Clay N/A Clean Dry. Plumb Wall Pier ~* 18" 48" 9'10" Gray Sandy Clay N/A Clean, Dm'. Plumb Wall Pier ~* 18" 48" 9'8" Gray Sandy Clay N/A Clean. DO'. Plumb Wall Pier ~'* 1§" 4§" 10'3" Gray Sandy Clay N/A Clean. Dry.. Plumb · NW corner of Fire Station yard "~ East side of building parallel with road cc: Mr. John Maggiore - Noah American Properties-SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. Gary Stokes - C.A. Walker Construction Mr. Lee Stone - City of Coppell Mr. Lar~'v. Davis- Cit,'. of Coppell '