ST0301C- LR150707 (3)• GEOTECHNICAL. ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: July '7, 2015 Test Date: June 29, 2015 Client: City of Coppell General Report No.: 6 Project Bethel and Coppell Rd. Paving & Utility Impr. Project No.: 215-0140 Identification Reinforcing Steel Observation Method of Test Visual Observation Fage 1 of 1 Results On June 29, 2015 reinforcing steel was observed at the following locations: 1) Box Culvert (Tor) Stab) The following discrepancies were noted and called to the attention of Edgar, representatives of Tiseo Paving. 1) Fix spacing of F2 bars to meet 18"max requirement. 2) Fix spacing of E bars to meet 6" requirement The above discrepancies were corrected as noted. Technician: BT *Note: Rebar partially covered by forms prior to inspection. cc: Mr. Rick Odell - City of Coppell via E-mail: Rodellgcoppelltx.gov Mr, Michelle Matunas - City of Coppell via Email: mmatunas(fa,coppelltx,gov Mr. George Marshall - City of Coppell via Email: gmarshall(a),coppelltx.gov_ Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(aOseopaving.com GEE Consultants y Inc TBPE Firm: F-3212 Reviewed by: -1 - All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative ofthe quantities of apparently identical or similar products. iNICAL ENGINEERING VIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, 10046 Monroe Drive 0 Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: July 7, 2015 Test Date: June 23, 2015 Client: City of Coppell General Report No.: 7 Project Bethel and Copped Rd. Paving & Utility Impr. Project No.: 215-01.40 Identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of 1 Results On June 23, 2015 reinforcing steel was observed at the following locations: 1) Box Culvert Walls (Two Southern Most Walls) There were no discrepancies. Technician: BT *Note: Forms in place prior to inspection. cc: Mr. Rick Odell - City of Coppell via E-mail: Rodeligcoppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunasncoppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshallr?a,coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudillLi)tiseopaving.com GEE Consultants, Inc, TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.