ST0301C- LR150707 (3)• GEOTECHNICAL. ENGINEERING
E I • ENVIRONMENTAL CONSULTING
E I • CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: July '7, 2015 Test Date: June 29, 2015
Client: City of Coppell General Report No.: 6
Project Bethel and Coppell Rd. Paving & Utility Impr. Project No.: 215-0140
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Fage 1 of 1
Results
On June 29, 2015 reinforcing steel was observed at the following locations:
1) Box Culvert (Tor) Stab)
The following discrepancies were noted and called to the attention of Edgar, representatives of Tiseo Paving.
1) Fix spacing of F2 bars to meet 18"max requirement.
2) Fix spacing of E bars to meet 6" requirement
The above discrepancies were corrected as noted.
Technician: BT
*Note: Rebar partially covered by forms prior to inspection.
cc: Mr. Rick Odell - City of Coppell via E-mail: Rodellgcoppelltx.gov
Mr, Michelle Matunas - City of Coppell via Email: mmatunas(fa,coppelltx,gov
Mr. George Marshall - City of Coppell via Email: gmarshall(a),coppelltx.gov_
Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(aOseopaving.com
GEE Consultants y Inc TBPE Firm: F-3212 Reviewed by: -1 -
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of
our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative ofthe quantities of apparently
identical or similar products.
iNICAL ENGINEERING
VIRONMENTAL CONSULTING
• CONSTRUCTION MATERIALS TESTING
GEE Consultants,
10046 Monroe Drive 0 Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: July 7, 2015 Test Date: June 23, 2015
Client: City of Coppell General Report No.: 7
Project Bethel and Copped Rd. Paving & Utility Impr. Project No.: 215-01.40
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Page 1 of 1
Results
On June 23, 2015 reinforcing steel was observed at the following locations:
1) Box Culvert Walls (Two Southern Most Walls)
There were no discrepancies.
Technician: BT
*Note: Forms in place prior to inspection.
cc: Mr. Rick Odell - City of Coppell via E-mail: Rodeligcoppelltx.gov
Mr. Michelle Matunas - City of Coppell via Email: mmatunasncoppelltx.gov
Mr. George Marshall - City of Coppell via Email: gmarshallr?a,coppelltx.gov
Mr. Robert Caudill - Tiseo Paving via Email: rcaudillLi)tiseopaving.com
GEE Consultants, Inc, TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of
our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently
identical or similar products.