Loading...
ST0301C- LR160625GEOTECHNICAL ENGINEERING E I* ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING -A- - GEE Consultanys, Inc. 10046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 • Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: June' 25, 2015 Test Date: June 19, 2015 Client: City of Coppell General Report No.: 4 Project Bethel and Coppell Rd. Paving & Utility Impr. project No.: 215-0140 Identification Reinf6rcing Steel Observation Method of Test Visual Observation Page I of I Results On June 19, 2015 reinforcing steel was observed at the following locations: 1) Box Culvert Walls (Middle Two Walls) The following discrepancies were noted and called to the attention of Zepriano, representatives of Tisio Paving 1) Rebar touching form walls, use chairs to meet 2" concrete cover requirement. The above discrepancies were corrected as noted. Technician: BT *Note: Rebar partially covered by forms prior to inspection. cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell@col2pelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(a4copyelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall(i�covpelltx.gov Mr. Robert Caudill -Tisco Paving via Email: rcaudillneltiseol)avin GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed b �4_ �u All letters and reports are for the exclusive use of the client to whom they are addressed and shall not DC reproduced without the full approval of EE Cons tants, Inc, The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.