Loading...
ST0301C- LR160619-INICAL ENGINEERING VIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 GENERAL REPORIT Report Date: June 19,, 2015 Test Date: June 10, 2015 Client: City of Coppell General Report No.: 01 Project Bethel and Coppell Rd. Paving & Utility Impr. Project No.: 214-0140 Identification Box Culvert Subgrade Observation Method of Test Visual Observation Page 1 of 1 One June 10, 2015, a representative of GEE Consultants, Inc. was authorized to perform visual observations of the proposed subgrade beneath the multiple box culvert. The box culvert was located in Southbound Coppell Rd., just North of Bethel Rd. We observed a layer of larger gravel placed in the bottom of the multiple box culvert excavation. It was our understanding this gravel layer was about 12 inches thick and placed on firm soils beneath. No observations or testing of the subgrade beneath the gravel layer was requested or performed. Water had collected on top of the gravel layer at numerous locations. Therefore concrete placement was cancelled on this date. cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell@copl2elltx.gov Ms. Michelle Matunas -City of Coppell via Email: mmatunas()a,coppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall(iDcoppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudillLa tiseo.com GEE Consultants, Inr.. TBPE Firm: F-3212 Reviewed by: c All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written app. oval. Our letters and reports apply only to the sample tested mid/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. �-� | �� | ° GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING | �� | ~ CONSTRUCTION MATERIALS TESTING GEEConsultants, Inc. �w 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972 MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date: June 11, '2015 Project No 214-0140 Client: City of Coppell Sample Date: April 28, 2015 Moisture Report No. 3 Prcj ect: Bethel and Coppell Rd. Paving & Utility ImpC Coppell, TX Identification: Moisture Density Relationship Test Procedure: ASTM D698 D4318D114 Test Results: Method_'''',''''''''''''''''''''''''''''''''''' /\ Optimum Moisture Content ........................ 16] percent Maximum Density ............................... 108.1 pounds per cubic foot Rammer Type ................................... Manual Material Description .............................. Brnvvo and Yellowish Brown Clayey Sand with Occasional Limestone and Sand Pockets Material Origin . . . . . . . . . . . . . . . . . . . . ' . . . . . . . . . . . . . STA 17f00 Moisture Preparation Procedure ..,.........,........ Air Dry Liquid Limit ,,.................................. 34 Plastic Limit .........................,.......... 15 Plasticity Index .................................. lq co: Mr. George Marshall - via: GEE Consultants, Inc. TBPE Firm: F-3212 Rcviewed by: Our letters and reports are for the exclusive use ofthe client to whom they are addressed. The use ofour name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed, and are not necessarily indicative ofthe quantities ofariparently identical or similar products.