Loading...
ST0301C- LR150618• GEOTECHNICAL ENGINEERING E • ENVIRONMENTAL CONSULTING GEE Consultants Inc. [-E] • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive 0 Dallas, Texas 75229 (214) 352-5433 • Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: June 18, 2015 Test Date: June 9, 2015 Client: City of Coppell General Report No.: 1 Project Bethel and Coppell Rd. Paving & Utility Impr. Project No.: 214-0140 Identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of 1 Results On June 9, 2015 reinforcing steel was observed at the following locations: 1) SD. Inlets at STA 5+38.33 Line F 2) STA 9+15.33 Line F 3) STA 11+51.98 Line F There were no discrepancies. Technician: HP cc: Mr. George Marshall - via: GMarshall@coppelltx.gov Mr. Rick Odell - via: Rodell@coppelltx.gov GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: I-' -. All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative ofthe quantities ofapparently identical or similar products.