Loading...
ST0301C- LR150618 (4)G1 • GEOTECHNICAL ENGINEERING El • ENVIRONMENTAL CONSULTING GEE Consultants, Inc. r- I • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: June 18, 2015 Test Date: June 11, 2015 Client: City of Coppell General Report No.: 2 Project Bethel and Coppell Rd. Paving & Utility Impr. ProjectNo.: 214-0140 Identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of 1 Results On June 11, 201. reinforcing steel was observed at the following locations: 1) Box Culvert W. Side of Bridge (Bottom Slab) The following discrepancies were noted and called to the attention of Zepriano, a representative of Tesio Pavin;, 1) Pump water out from the bottom. 2) Add vertical U bar 3) Clean mud off of rebar The above discrepancies were corrected as noted. Technician: BT cc: Mr. George Marshall - via: GMarshall@coppelltx.gov Mr. Rick Odell - via: Rodell@coppelltx.gov GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: t—lel 01" " All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants Inc The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities ofapparently identical or similar products.