Loading...
Irby Addition- LR150708TESTED FOR:DATE: 07/08/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 33 07/08/15 SG 1 12.2 116.8 12.6 112 96 2-A 34 07/08/15 FG-4.0 4 26.3 94.7 25.4 97 103 1-A 35 07/08/15 FG-3.5 4 26.3 94.7 25.8 95 101 1-A 36 07/08/15 FG-3.0 4 26.3 94.7 25.7 95 100 1-A 37 07/08/15 FG-2.5 4 26.3 94.7 26.1 94 99 1-A 38 07/08/15 FG-2.0 4 26.3 94.7 26.3 93 98 1-A 39 07/08/15 FG-1.5 4 26.3 94.7 26.0 94 99 1-A TEST LOCATION: 33 34 35 36 37 38 39 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Todd Smith ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. PERCENT COMPACTION Coppell, Texas TECHNICIAN: 30' W and 8' N from SE Corner of Lot 1 20' W and 5' N from SE Corner of Lot 1 25' W and 10' N from SE Corner of Lot 1 20' W and 6' N from SE Corner of Lot 1 COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Northville Development, LLC 151171-10Irby Addition Phase II (Nine Oaks) Coppell, Texas SOIL ID NUMBER COMPACTION TESTS 15' W and 10' N from SE Corner of Lot 1 TEST NO. 20' W and 10' N from SE Corner of Lot 1 M. Howlader 20' W and 8' N from SE Corner of Lot 1 IN PLACE DRY DENSITY PCF DATE TESTED FOR:DATE: 07/08/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 40 07/08/15 FG-1.0 4 26.3 94.7 25.8 94 99 1-A 41 07/08/15 FG-0.5 4 26.3 94.7 25.7 93 99 1-A 42 07/08/15 FG 4 26.3 94.7 25.4 94 99 1-A TEST LOCATION: 40 41 42 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Todd Smith ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. TECHNICIAN: M. Howlader REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Northville Development, LLC Coppell, Texas Irby Addition Phase II (Nine Oaks)151171-10A Coppell, Texas 20' W and 10' N from SE Corner of Lot 1 25' W and 5' N from SE Corner of Lot 1 TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* 20' W and 5' N from SE Corner of Lot 1