Loading...
Founders Crossing- LR150429TESTED FOR:DATE: 04/29/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 19 04/29/15 FG-7.5 1 17.2 108.0 22.8 101 94 1-A 20 04/29/15 FG-7.5 1 17.2 108.0 22.3 102 94 1-A 21 04/29/15 FG-7.0 1 17.2 108.0 23.4 101 93 1-A 22 04/29/15 FG-7.0 1 17.2 108.0 23.1 101 93 1-A 23 04/29/15 FG-6.5 1 17.2 108.0 22.7 101 94 1-A 24 04/29/15 FG-6.5 1 17.2 108.0 22.5 101 94 1-A 25 04/29/15 FG-6.0 1 17.2 108.0 22.3 102 94 1-A TEST LOCATION: 19 20 21 22 23 24 25 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Daniel Jauregui ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. PERCENT COMPACTION Coppell, Texas TECHNICIAN: 10' N and 35' E from SW Corner of Building 1 30' N and 20' E from SW Corner of Building 1 65' N and 15' E from SW Corner of Building 1 75' N and 10' E from SW Corner of Building 1 COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Founders' Crossing, LLC 150902-10Founders' Crossings Phase 1 - Lot 1, Block A Coppell, Texas SOIL ID NUMBER COMPACTION TESTS 40' N and 35' E from SW Corner of Building 1 TEST NO. 70' N and 10' E from SW Corner of Building 1 M. Howlader 25' N and 30' E from SW Corner of Building 1 IN PLACE DRY DENSITY PCF DATE TESTED FOR:DATE: 04/29/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 26 04/29/15 FG-6.0 1 17.2 108.0 22.5 101 94 1-A TEST LOCATION: 26 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Daniel Jauregui ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. TECHNICIAN: M. Howlader REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Founders' Crossing, LLC Coppell, Texas Founders' Crossings Phase 1 - Lot 1, Block A 150902-10A Coppell, Texas TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* 50' N and 20' E from SW Corner of Building 1