Loading...
Eagle Point-CS 930524The City With A Beautiful Future May 24, 1993 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Murray Construction Co., Inc. 515 N. Kealy Ave. Lewisville, TX 75057 RE: Eagle Point Village at Riverchase Dear Sir: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, May 22, 1993. The overtime rate including salary and benefits is $29.00 per hour. Four hours were charged to your company on that date. Please send a check for $116.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Alan Johnson If you should have any questions, please contact me at (214) 393-1016. Sincere~ ~f Larry Davis Construction Inspector Finance Department Doug Stevens, Engineering Technician file/orr. Itt ... ~765 P02 TEL N0:214 21~-0019 Nay ~9, 2.993 2SS PaFkviy Blvd. Attn: Mr. Larry Dtv~s Sub~ect: "Eagle Point V~llage it Riverchase" Request to work Hay 22, 1993 Dear Larry, Me requeet that we may work on the eub~ect project on Saturday, N&y 22, 1993. 8~nceroly, Carol Ann Milliams CA /h NO. KEAtY AVE. L.EWIII~VILLE. TEXAS ?t0~7 4~14] 4~l~l-4.leS PAX (l'lA) SIS-OCI1S