Loading...
Irby Addition- LR150625TESTED FOR:DATE: 06/25/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1 06/25/15 SG 1 12.2 116.8 12.1 113 97 2-A 2 06/25/15 SG 1 12.2 116.8 12.3 112 96 2-A 3 06/25/15 SG 1 12.2 116.8 12.6 112 96 2-A 4 06/25/15 SG 1 12.2 116.8 13.0 112 96 2-A 5 06/25/15 SG 1 12.2 116.8 13.4 111 95 2-A 6 06/25/15 SG 1 12.2 116.8 12.7 112 96 2-A 7 06/25/15 SG 1 12.2 116.8 12.3 112 96 2-A TEST LOCATION: 1 2 3 4 5 6 7 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Todd Smith ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. PERCENT COMPACTION Coppell, Texas TECHNICIAN: 10' N and 10' W from SE Corner of Lot 6 50' N and 30' W from SE Corner of Lot 9 10' N and 15' W from SE Corner of Lot 8 10' N and 10' W from SE Corner of Lot 7 COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Northville Development, LLC 151171-4Irby Addition Phase II (Nine Oaks) Coppell, Texas SOIL ID NUMBER COMPACTION TESTS 50' N and 25' W from SE Corner of Lot 7 TEST NO. 10' N and 15' W from SE Corner of Lot 9 M. Howlader 45' N and 30' W from SE Corner of Lot 8 IN PLACE DRY DENSITY PCF DATE TESTED FOR:DATE: 06/25/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 8 06/25/15 SG 1 12.2 116.8 13.1 111 95 2-A 9 06/25/15 SG 1 12.2 116.8 13.5 111 95 2-A 10 06/25/15 SG 1 12.2 116.8 13.4 111 95 2-A TEST LOCATION: 8 9 10 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Todd Smith ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. TECHNICIAN: M. Howlader REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Northville Development, LLC Coppell, Texas Irby Addition Phase II (Nine Oaks)151171-4A Coppell, Texas 10' N and 10' W from SE Corner of Lot 5 50' N and 25' W from SE Corner of Lot 5 TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* 40' N and 20' W from SE Corner of Lot 6