Loading...
Irby Addition- LR150625 (2)TESTED FOR:DATE: 06/25/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 11 06/25/15 #DIV/0! 12 06/25/15 #DIV/0! 13 06/25/15 #DIV/0! 14 06/25/15 #DIV/0! 15 06/25/15 #DIV/0! 16 06/25/15 #DIV/0! 17 06/25/15 #DIV/0! TEST LOCATION: 11 12 13 14 15 16 17 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Todd Smith ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. PERCENT COMPACTION Coppell, Texas TECHNICIAN: COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Northville Development, LLC 151171-5Irby Addition Phase II (Nine Oaks) Coppell, Texas SOIL ID NUMBER COMPACTION TESTS TEST NO. M. Howlader IN PLACE DRY DENSITY PCF DATE TESTED FOR:DATE: 06/25/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 11 06/25/15 SG 1 12.2 116.8 17.7 99 85 2-B 12 06/25/15 SG 1 12.2 116.8 14.0 108 92 2-B TEST LOCATION: 11 12 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Todd Smith ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. TEST NO. 10' N and 30' W from SE Corner of Lot 8 M. Howlader IN PLACE DRY DENSITY PCF DATE Irby Addition Phase II (Nine Oaks) Coppell, Texas SOIL ID NUMBER REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Northville Development, LLC 151171-5 COMPACTION TESTS Coppell, Texas COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % PERCENT COMPACTION TECHNICIAN: 10' N and 25' W from SE Corner of Lot 7