ST0502A- LR150308(; . GEOTECHNICAL ENGINEERING E| | wENVIRONMENTAL CONSULTING E | -CONSTRUCT10N MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 �214) 352-5433 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Client: Cfh/ o[CunDC } Gcncm| Report No: 87 Project Freeport Pkvvv Project No.: 214-144 Identification Reiril'orcing Steel Observation MxthodofYest Visual Observation Page I of I ReSo|a On pcinxooin�gre|�uyuhuxncdo\thcf�Umw|n�|ncudons Piers: 2 -D.2 -C,2 -l' The following discreparcies were noted and called to the attention of Alciandro a representative of CDBUilders. |. Clean rdbo 2, Use rebar SUpport for vertical bars and spiral 3,For spiral make one turn flat ]" below top ofounoreto The above discrepancies were corrected as noted. Technician: CP oc� Mr. Rick DoU-ChyofCoppcU Via F --Mail: KO Dell|kx.�ov M,, Michael Garza - City o[CoppcU. phone: 972-2U4-367Y;via E-n.m |: NlOurzu((�.coppc|kx.gov Mr. Mitch Holmes Tcu-)ou,Nall &Perkins, Phone: 432-3l2420tvia E'mxi|: mho|mcuoympinc.com Mr. Fmndson[uyundo-CD Builders, Inc., phone: 787-688-8207-, via [-mai|: Uuyundo��odhoi|desprmm iNICAL ENGINEERING; VIR()NMENTAL CONSULTING * CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive * Dallas, Texas 75229 * (214) 352-5433 * Fax (214) 352-6972 REINFORCING STETI., I'L CEW NT Report Date: March 8, 2015 Test Date: February 2, 2015 Client: City of Coppell Project Freeport llkwy. Identification Reinforcing Steel Observation Method of Test Visual Observation (Jeneral Report No.: 88 Project No.: 214-144 Page l of 1 Results On Eebruar / 2_20 15. reinforcing steel was observed at the followinz3 locations: Bridge columns, bent 3, stage 2. Abutment 4, wing wall 4 - elevation. The following discrepancies were noted and called to the attention of AIe'andro a representative of CDBuilders. 1. Fix min I turn flat of spiral bottom end of columns. 2. Clean the bottom area. 3, Use rebar support: Tor rebar. "I°he above discrepancies were corrected as noted. "Technician: CP cc. Mr. Rick O Dell- City of Coppell Via E -Mail: R O Dell j�Coppellix.gov Mr. Michael Garza - City ofCoppell, Phone: 972-304-3679; via ['I -mail: MGarzae(i coppelltx.gov Mr. Mitch 1-16mes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholines(a),tnpinc.com Mr. Francisco Luvando - CI) t§uilders, Inc., Phone: 787-688-8207; via E-mail: flu andoriters r cdbuil,d.coixi GEE Consultants, Inc. TBPF Firm: F-3212 Reviewed by: ,..,;s and re ports are for the exclusive use of" the diem to whine they are addressed and shall not be reproduced without the full approval of GEE_ C.onsultanis, Inc. 1 ht use of Mw name mast iecene All Icut.�s� l - - <,w prior wntlCn approval Our letters and reports apply only to the sarnplc tested and ur obsei ved and are not nacessattly indicative of the quanttpes of apparently identical or snnilar products. Ia GEOTECHNICAL ENGINEERING I • ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING GEE Consultan"t,"f 10046 Monroe Drive ,e Dallas, Texas 75229 0 (214) 352-5433 Fax (214) 352-697.2 REINFORCING STEEL PLACEMENT Report Date: March 8, 2015 'hest date: February 3, 2015 Client: City of CoppelI General Report No.: 89 Project Freeport Plcwv ProjectNo.: 214-144 Identification Rcinf6reing Steel Observation Method ofTest Visual Observation Page 1 of 1 Resnhs on Fcbruary 3 2015. reinforcing steel was observed at the following locations: Tie -backs gabian l ,row 3; stage 2. "File following discrepancies were noted and called to the attention of Ale'andra a representative of CDF3uilders 1. Use rebar support 2. Fix rebar in the middle for end. The above discrepancies were corrected as noted. Technician: CP cc', Mr. Flick 0 Dell- Cite ofCoppell Via F -Mail: R 0 Dell «CoppC lltx.t_)ov Mr, Michael C.,arza - Cite ofCoppell, Phone: 972-304-3679. via E-mail: MGarza(�vcoppelltx.gov Mr, Mitch Holmes -Teague, Nall & Perkins, Phone: 432-312-4205 via Fu -marl mholmes@tnpinc.com Mr. Francisco I,uyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: flu yandocdbuilderspr.corn GEE Consultants, Inc. TRPE Firm: F-3212 Reviewed by:�" client to "horn the ate addressed and shall not be reproduced �rithout the fS.dl apptoo�al h uaI Consultants Inc. l e ticalOor snnil01 lv1JOliSt 1roductsccrve flees and reports arc t'w- the exulusi� c use 01 tile Y tmt prior winten appt'oval Our Ietiets and reports apply only t6 the szutple tested and of obimed and are not necessarily mdtcaUse of the quannnes orapparently identical r I* GEOTECHNICAL ENGINEERING I # ENVIRONMENTAL CONSULTING s • CONSTRUCTION MATERIALS TESTING::, GEE Consultants, Inc. 101046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 i -11r • . r r Report Date; Glarc�i3 20 [[ __ __-- - inspection Date: — -_ February O4, -2O-1-5 " -- Client: City of C:oppelI, Report No. 10 Project: Freeport Pkwy 20' 20' Identification: Straight -Shaft Tieback Project Number: 214-144 Method of Test: Visual Observation Page: I of t Tie- E3ack # Shaft Size Depth to Bearing Strata Req'd. Pent. Actual Pent. Total Depth Bearing Material Casin- Remarks Depth GI -2-F 6" 20' 20' 20' 20' Dark gra shale N/A G1 -2-G 6" 20' 20' 20' 20' Dark gray shale N/A -1 6" 20' 20' 20' 20' Dark gra y shale N/A 2-1 LG 6" 20'5" 20' 20'5" 20'5 Dark gra shale N/A �1-17 2-,I 6" 19'8" 20' 19'8" 19'8" Dark gra > shale N/A PALLJr • :rotes: Gabion d, Ro\i 1 Stage 2 cc: Mr. Rick 0 Dell- City oii Coppell Via E -Mail: R O Dell(c Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGaria(ttcoppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E -snail: mholmes ct tnpinc.corn NIr. Francisco L,uyando - CD Builders, Inc.. Phone: 787-688-8207: via E-mail: fluyarndo cr cdbuilderspr.corn GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: our pnoi written appyal_ our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative 01,010 quantities orapparent1% identical or similar products_ I • GEt9TECHNIC:AL ENGINEERING • ENVIRONMENTAL CONSULTING E I • C_0 'STRUCTI(^)N MATERIALS TESTING GEE Consultants, 10046 Monroe Drive + Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 REINFORCING STEEL PL,ACEMFIN" Report Date: March 8, 2015 Test Date: February 5, 2015 Client: City of Coppell General Report No.: 90 Project Freeport Pkwy Project No.: 214-144 identification Reinforcing Steel Observation Method of Test Visual Observation Page l of 1 Results on February 5, 101 s reinforcing steel was observed at the following locations: Abutment 1; Stage 2 and wing wall. The following discrepancies were noted and called to the attention of Alejandro„ a representative of CDBuilders. 1. Supplemented 2 bar 1/6 in the end. 2. Clean pieces of wood out from the bottorn. The above discrepancies were corrected as noted. Technician: CP QC, Mr. Rick 0 Dcll- City ofCoppell Via 1�-Mail: R O Dell c Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-.3679, via F -mail, MGarzar�i)coppelltx.gov Mr. Mitch flolmcs -'Teague, ]*loll & Perkins, Phone: 432-3 12-4205via E-mail: tnholmes(�;tnpine.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via F -mail fluyando a,edbuilderspr.com GEE; Consultants, Inc. THPE Firm: F-3212 Reviewed by: 'x "I",C uic 11,711rthe eliea! to 1ah1111, are addle+sed and 111,11, not be leprothiaed without tile r�a e hill appul of Cil [ Conxdtantti I x l h o� ow urmc mutt ic�.ene Alileuls lotrzprntaare t out Pilot ts�ntten appro thea ,al Cour lentis and reports only to the sanq>Ie tested and or ol'tseised and arc 1101 nea'ssatih indicative of the quanhus of apparently idunlixai Ill snndai products. C; I . GEOTECHNICAL ENGINEERING ENVIRONMENTALCONSULTING E I -CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 PIER OBSERVATION REPORT Report Date. �1Gfarc�J, �T�______ __� Inspection Date: Te�irUary lam, �. Client: City of Coppel I Report No. I Pro.ject: Freeport Pkwy Identification: Strai ght- Shaft Tieback Project Number: :, Pai4e: I of I Method ofTest: Visual Observation Notes: cc Mr. Rick 0 Dell- City of COPPell Via E --Mail: R 0 Mr, Michael Garza - City Of COPPCII, Phone: 972-304-3679; via E-mail: MGarza(Pt coppelltx.-(-Iov Mr, Mitch I loh-nes - Teague, Nall & Perkins, Phone: 432-312-4205, via E-mail: inholnics((�Jnpitic.corn Mr. Francisco LLIyando - CD Builders, Inc., Phone: 787-688-8207-, via E-mail: fluyando jc ,cd bu i Iderspr. coin GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: f, I I IQ quantities infaPpa 10 Id N identical I i)i sill' i I at pros tic is our prior Written approval. Out letters and reports apply , only tothe Sample tested and/or observed and are not necessar, I v indicative 0 Bearing Material I I Casing Depth Remarks Pieri� '1 Shaft Size Depth to Bearing Strata Rcqd. pent. Actual Peru, J otal Depth 4-44' 6" 201 20' 20' 20' Light brown sandy clav N/A Dry, Clean 4-441 6" 10, 2 20' 20' 20' Light brown sandy clay N/A Dry, Clean 'ry" C 4-4-11 6" 201 20' 20' ?0, - Light brown sandy clay N/A Clear le Dry, Clean 4-4-1 6" 201 20' 20' 20' Light brown sandy ck N/A l call Clean Dry, Clean Dry, MD —6 20' '20' — 20' 20' 20' 2 20' j j2 20' 20' 1 20' -)0, - 20' 20' — 20' 20' -)0. 20' Dark ra shale Dark ra shale Dark ra shale 1 Dark gra shale N/A N/A -_ N/A N/A Dry. (,'lean C I Clean D Clean Dry, Clean ----------- CI D can D!j,_CIean lean Dry, C can 4-4-J " 4-4-K 6 " 4-4-L 6" 4-4-M W, Notes: cc Mr. Rick 0 Dell- City of COPPell Via E --Mail: R 0 Mr, Michael Garza - City Of COPPCII, Phone: 972-304-3679; via E-mail: MGarza(Pt coppelltx.-(-Iov Mr, Mitch I loh-nes - Teague, Nall & Perkins, Phone: 432-312-4205, via E-mail: inholnics((�Jnpitic.corn Mr. Francisco LLIyando - CD Builders, Inc., Phone: 787-688-8207-, via E-mail: fluyando jc ,cd bu i Iderspr. coin GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: f, I I IQ quantities infaPpa 10 Id N identical I i)i sill' i I at pros tic is our prior Written approval. Out letters and reports apply , only tothe Sample tested and/or observed and are not necessar, I v indicative 0 |N|[ALEN(JNWEERIN(3 # CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 REINFORCING STEEL PLACEMEN'r Report Date: March 5,70l5 Client: City of Coppell ProjJect Freeport Pkwy Wcmi6cmkm Reinforcing Steel Observation Test Date: February 10, 201-5 General Report wn:q4 ProJect NO.: 214-144 ,Method ofTest \/inVo O�acrv8dun ^~^ Page I0fl On reinforcing steel was observed n1the following locations: Tiebacks -6ubiun4; row 4; stage 2. The following discrepancies were noted and called Nthe attention ofJose u representative of 1. Use four supports for each rehar. 2, Clean rr6arofclay. The above discrepancies were corrected as noted. Technician: CP p«: Mr. Rick ODell- City ofCoppcUVia E-Mai|:KO |kx.gov M, Michael Garza ' City ofCoppdi` Phone: 972-304'367p;via E-mui\:KGarzu((?icnppo|hx -g�1uv M: Mitch Holmes -Tcuguc Nall ~ Perkins. Phone: 432-3|2~42U5;via [-mui|:mho|mos6ol mpin o-oom i\dorqx �omMr. Francisco Luyun4oCuK i|uxm.Inc.,uPhone: 787'68X4O07-,v�C+noU:Uuyan_ ~_^ GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: , . j��, 11 orse of -tire Client to os lorla drey ate addressed and shill olot be leplOdUCCLI IIIII(Alt tile ()Ill. jeltels arid lepoiis apply Only to tile sample tested and/oll ot)smed and are not riecessanh ordicatm of' the quaritities of appareritl% identical 11 �ilallal pioduc s Out plim %�rilterl approval. I * GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING * CONSTRUCTION MATERIALS TESTING 1 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 REINFORCING STEEL PLAC✓I MI NT Deport Date: March S, 2015 Test nate: February 10, 2015 Client: City of Coppell General Report No.: 93 Project Freeport Pkwy Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of 1 Results on 1' ebruary l0. 2015 reinforcing steel was observed at the following locations: Columns 2-E; 2-I Fly over utility S and N Inlet STA 15 � 00 bottom and wall The following discrepancies were noted and called to the attention of Ale'a�'o a representative of CD[3uildcrs. Columns: I. Clean the bottom of the columns Inlets: 1. Supplemented with rebar around hole pipe. 2. Use chairs on rebar. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 t:)ell- City of Coppell Via E -Mail: R O Dell(r)Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza(�,coppelltx.gov Mr. Mitch Holmes - T'eague, Nalt & Perkins, Phone: 432-312-4205 via E-mail: mholrnes(c�tnpinc.com Mr. Francisco Euyando - CD Builders, Inc., Phone: 787-688-8207, via E-mail fluNando c cdbtfilderspr,com GEF Consultants, Inc. TBPE Firm: F-3212 Reviewed by: utters and reports are for the cryu. I sive use of the client to whom they are addressed and shall not tie reproduced without the ftdl approval of (Ift (ellsultants eptly ulenneal oro,nmlar products our prior wr rtten approval. our letters and reports apply only to the sample tested andtor obsened and are not nece5saril} indicative of the quanlrties of app I -GEOTECHNICAL ENGINEERING * ENVIRONMENTAL CONSULTING E I -CONSTRUCTION MATERIALS TESTING "EE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 REINFORCING STEEL, PLACEMENT Report Date: March 5, 2015 Test gate: February 9, 2015 Client: City of Coppcll Project Freeport Pkwy Identification Rcinl'orcing Steel Observation Method of Test V .sual Observation General Report No.: 92 Project No.: 214-144 Page 1 o IF 1 Results On February 9, 2015. reinforcing steel was observed at the following locations: Abutment 1; stage 2-elcvation. Columns 2D; 2G The following discrepancies were noted and called to the attention of Alefandro a representative of CDBuilders. 1. Use rebar support between rebar and forms. 2. Clean the bottom area. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick O Dell- City of Coppell Via 1✓, -Mail: R O Dell(a.Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza(c�eoppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes�)tnpinc.com Mr. Francisco Luyando - CD Fluilders, Inc., Phone: 787-688-8207; via E-mail: fluyandoC(cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: - ' All letters and repoits me for the exclusive use of the client to whom they are addiessed and shall not be ieptoduced without the full approval of Old, Cnsaltants. Inc. The use of our name must receive our p im limen approval Our ]cite s and reports apply onk to the sample tested and'or observed and are not necessai ily indicative of the quantities of apparently identical or similar products- • C;EOTECHNPC'AL ENGINEERING • ENVIRONMENTAL CONSULTING E 1 + (--ONSTRUCTION MATERIALS TESTING GEE Consultants, 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 REINFORCING 'STEEL PLACWENT Report Date: Match 8, 2015 Test mate: February 6, 20115 Client: City of CoppelI General Report No.: 91 Project Freeport Pkwy Project No.: 214-144 Identification Reinfi-rcing Steel Observation Method of Test Visual Observation Page 1 of l Results On February 6,20 15 reinforcing steel was observed at the following locations: 'hie -Back (G-2) side of the bridge Abutment stage 2 and wing wall There were no discrepancies. Technician: RA cc: Mr. Rick O Dell City of Coppell Via E -Mail: R O Dell(WOppelltx.gov Mr. Michael Garza - City ofCoppell, Phone: 972-304-3679; via E-mail: MGarza((Tcoppelltx.gov Mr. Mitch Holmes -Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mhoimes(a)tnpinc.com Mr. Francisco Iluyando - CD Builders. Inc., Phone: 787-688-8207; via E-mail: ALIyandoncdbuilderspr.com GEE Consultants, Inc. TBP>u Firm: F-3212 Reviewed by: VII Iettcis and reports ail lot till 'I'll""e u c of the chem t� c hum the ate addie,sed and shall not he tepjodueed tsrthoW the Iull appio,al of (,t ( Consultants. Inc I he uu of a name nurst 'CQ el%e our phot wnllen approval (An leuc,s end repoiis applq onh 10 the sample tested and or obse"Cd and are not oecessai il% indwame of the gttanuues of apparently idem eal of sumlai lnoduct, (; I . GEOTECHNICAL ENGINEERI"JG E I - ENVIRONMENTAL CONSULTING E I -cONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: March 11, 2015 Date Concrete lllacc& Jal`)Uary 20, 2015 Standard 6",\12" (Ondeps Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches pro ' ject: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No., 120 Contractor CD Builders Inc. project No,: 214-0144 Concrete Supplier and Plant: Argos 9111 Location of placement: Pavement bike trail MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (i,bs,/CuYd) Mix Number: 1273 Cement: F1\ Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 2 Added Water: 0 Time Sample Batched: Time Sampled: Sample Location: 8:33 AM 10:45 AM STA 24-80 to 24+90 STA 21+20 to 2 1 -� 30 STA 19, 40 to 19+50 Truck // Ticket No: 5038 /1557109 'Temperature: Date I ested Ambient Range: 48 'F Concrete Range: 58 OF Slump Range (inches): 5.0 Weather Conditions: Partly Cloudy Time Started: 8:00 AM Time Completed: 10:45 AM Sample Air Content 5.0 Total Cubic Yards Placed: 8 Reouired Strength (Lbs./sci.in.): 3600 Specimen Number Measured Slump (in,) Age (Days) Date I ested l'otal Load (Lbs') Compressive Strength (Lbs./SclAn.) Remarks FPP 477 7 1/27/15 156,140 5,520 FPP 478 28 21/17/ t5 165,880 5,870 5.0 FPP 479 28 2/17/15 168,780 5,970 FPP 480 1-1 Hold I I Test Methods Utili/'ed Fracture Regular (Minders Made Hv CP ASTM C-31, C-39. C-143 (t in less Noted Otherwise) Remarks and/or Distribution:- None cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-104-3570 Mr. Michael Garza - City of Coppell, Phone: 972-304-3679.- via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes(a)tnpinc.com Mr. Francisco LUyando - CD Builders, Inc., Phone: 787-688-8207, via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and iepons are Car the exctumNe use of the client to wh0111 they are addressed and shall not be reproduced without the toll aplaoa] of' GET C'onsult'ants, Inc. rhe use of our name Inust leceiw our Prior wlittell apploNaL Our letters and reports apply only to the sample tested alldor observed and are not necessarily indicatne of the quantities of apparently identical or sinulai products. G | -GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING E | -CONSTRUCTION MATERIALS TESTING GEE Consultan*c Inc. "f 10046 Monroe Drive Dadas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 REPORT OFCONCRETE MIX OBSERVATION Report Date: March 11, 2015 Date Cortercte Placed. January 23, 2015 Standard 6"xl2" Cylinders c|ielu City of Coppell Cylinder cmos-swmn |xreu:zx,z7svomu|no»es Protect [oopou Pk*yrrom Ruby Rd. W Sandy Lake Rd. Concrete Report No.: 122 c^n/momc CD Builders Inc. Project No. - 2|4-O}44 Cvncmosupnx*and Plant: Ar -os 4111 Location ofllla�'.cnicnt, Piers bridge stage 2 Source SSD Batch\�s ���������� . OBSERVATION DATA Description (LbaACuYd) ` K4ixNumbcc 1083 Time Sample Batched: 9:44 PM Cement: 'Time Bonp|cd: 10:30 P&4 Fh&dz 3ump|uLocukm: Piers: 4 -k4 -L Coarse AggruQmtc: liuck/Ticket No: 6011 /1558828 Intermediate Aggregate: � � Tunpcmtuo� FPP 486 Fine Aggregate: AmhicmRanoc� � 51 OF 159,360 Concrete Ranoe: 62°F Admixtures: Slump Range (inchco): 4{) | Weather Conditions: Mostly Cloudy 2 Time Started: 7:30 AM Added Water: 0 Time Completed: 5:30 PM 5,790 Sample Air Content 44 Total Cubic Yards Placed: 28 kcouiudStronLyth(Lbs.6o.in]: 3600 Specimen Number MC,iWred slurnp (ill) Age (Days) Date Tested l'otal Load (l.bs.) (',)in press i Nic Strength (Lbs./Sq.ln.) Remarks FPP 486 28 2/20/15 159,360 5,640 4.0 FPP 487 28 2/201/15 163,620 5,790 1'est Methods Utilized I"racture RCOUlar CP (Minders, Made ffi: Remarks and/or Distribatiow- None cc: Mr. Larry Davis - City ofCoppcU. Phone: 972-304-3684; via Fax: 972-304-3570 K4r. Michael Garzo- City ofCopprU, Phone: 972-304-3679; via E-mail: hx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-3!2-42O5, via E-mail: mho|mcs((�tnpinc.com Mr. Francisco Luymndo-CD Builders, Inc., Phone: 787-688-8207� vio[-rnui|: Ouvnndo((-�xdhuiNenprcom ` GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed Iffil - GEOTECHNICAL ENGINEERING �� �� | ~ENV|k0N��ENTALOONSUOAhJ�� � E I# C'ONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION «vpo«oum: Client: wojcor Conoxomc Conu�mSupplixand Plant: Location of, Placement: March |i20|5 Date Concrete Placed: January 2i20|5 Standard a"x|r^cOmuos City ofCoppd| Cylinder Cross-sectional Area: a8,/7Square Inches Freeport Pkwy Rnm Ruby Rd. /oSandy Lake Rd. Concrete xupmwv.: |2| CD Builders Inc. r"iuotwo.:2|4-0\44 Argos #|08 Yiom MATERIALS Sou Source SSD Batch . OBSERVATION DATA Cornpressive Strength (Ibs./Sq.lnj Remarks Description bo/Cd 40 Mix Number: 1083 Time Sample Batched: 4:19 PM C*mult: Time Sampled: 5:40 PM PhAsh: 4960 Smnp|uLucahm: 4-P;4-3;441;4]�8u-c2 Coarse Aggregate: Truck /'Ticket No: 6011 /1558828 Intermediate Aggregate: Temperature: H Hold Ambient c Xun� 59"P Fine Aggregate: � Test Methods Utilized Concrete Range: 60 OF Admixtures: (Unless Noted Otherwise) Slump Runge (inches): 475 / Weather Conditions: Mostly Cloudy 2 Time Started: 8:00 AM Added 'Kxter O Time Completed: 6:45 P Sample An- Content 4.8 Total Cubic Yards Placed: N x,voired �,l,cnwh0in]- 3600 specillion Number McaSUred S11.1111P (ill.) Age (Days) Date Vested Total Load (I'hs.) Cornpressive Strength (Ibs./Sq.lnj Remarks FPP 481 40 3/2/15 143,220 5,070 FPP 482 40 3 712 1/ 15 140,260 4960 4.75 FPP 484 H Hold Test Methods Utilized FractUre Regular C'Minders Made 11\1: CP ASTM C-3 1, C-39, C- 143 (Unless Noted Otherwise) Remarks and/or Distril)110011:- None cc: Mr. inrryDavis - City ofCoppcU, Phone: 972-304-3684-. via Fax: 972-304-3570 Mx Michael Garza - City of(oppoU. Phone: 972-304-3679: via [-muil: MC U1z-gov Mr. Mitch Holmes TcaguC. Nall & Perkins, Phone: 432-3|2~4205; via F" -nail: nJho|mroCi.Nnpixc.cov Mr. Francisco Lxyando - CD Builders, Inc., Phone: 787-688-8207� via E-mail: Muyuxdo(�odhui|dorspconn GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed tINICAL ENGINEERING # CONSTRUCTION MATERIALS TESTING GEE Consultan4c, Inc. taf ------------ 10046 Monroe Drive 40 Dallas, Texas 75229 (214) 352-5433 •Fax (22114) 3152-690772 REPORT OF CONCRETE MIX OBSERVATION Report Date: March 11, 2015 Date Concrete Placed: January 29, 2015 standard 6"x12" Cylinders Client: City of Coppell Pro , ject: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Cylinder Cross-sectional Area: 28.27 Square Inches Contractor CT) Builders Inc. Concrete Report No.: 126 Concrete Supplier and Plant: Argos 4111 Project No.: 2 14-0144 Location of Placcnictit: Piers MATERIALS Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate Fine Aggregate: Admixtures: 2 Added Fater: Source ' I Description Specimen Date Measured Numher 7 Slump (in.) FPP 501 2/26/15 28 FPP 502 14 1 fold FPP 503 1.5 FPP SO4 Test Methods Utilized ASTM C-31, C-39, C-143 Remarks and/or Distribution:- None 1273 SSD Batch Wts, (l,bS/CLIYd) OBSERVATION DATA Age Date (Days) Tested 7 2151115 28 2/26/15 28 21/26/15 14 1 fold Fracture Regular (Unless Noted Otherwise Time Sample Batched: Time Sampled: Sample Location: Truck Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range �e (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content Total Cubic Yards Placed: Requir d Strenrth (Lbs./sq.in. Total Load Coiapressive Strength (Lbs') (f.bs./Sq.1n.) 113,940 4,030 179,860 6,360 213,280 7,540 Cylinders Made t3\: CP 8:00 AM 8:45 AM Piers I -J bridge stage 4030 , 1562803 59 "T 60 OF .3.5 Partly Cloudy 7:30 AM 5:30 PM 3.4 8 3600 Remarks cc: Mr. Larry Davis - City or Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarzaC(I)coppelltx.(Iov Z� Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4"205; via E-mail: inholines Cy.,upinc.corn Mr. Francisco I-uyando - CD Builders, Inc., Phone: 787-688-8207; via F -mail: tlLIN)ando((�cdbuilderspr.coiii GEE Consultants, Inc. 'TAPE Firm: F -3212T Reviewed by: All Jeltets and reports are fOr the e,,ebl,j, e use of the -eel, to oNbOjthe\ tile addiessed and shtlll n(,A be iepmduced lvithOut tile full appioval of (A-1, Collstift"Ints- 111C, HIC USe Of' OUJ lltllljC ITILISf le,xlve (qll pliol oNlittell apprmal Our lellel's and reports Ippily 011k to tile ample temcd and Ot )hseived and lue not nece,saijk Olkhctlll�e of the (Illaiiti(tes of apparently identical or similar products