Loading...
ST0502A- ST150402• GEOTECHNICAL ENGINEERING o ENVIRONMENTAL CONSULTING GEE * CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive i Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 GMERAt, REPORT SIEVE ANALYSIS Report Date: April 2, 2015 Test Date: October 1, 2014 Client: City of Coppell General Report No.: I Project: Freeport Pkwy Project No: 214-144 Identification: Sieve Analysis of Road Mixed Material (cement treated) Page 1 of I Method of Test: TEX-101-E Results S ecifications Technician: Tex -DOT Item 275 - 2004 Minimum Percent Pal 1'teve leve leve 100.0 85.0 60.0 cc: Mr. Rick O Dell- City ofCoppell Via E -Mail: RODel1@C0ppelltx.g0v Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes- Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr, francisco Luyando- CD Builders, Inc., Phone, 787-688-8207, via E-mail: fluyando@cdbuilderspr TBPE firm. E-3212 Reviewed b GEE Consultants, Inc. { ..M.. . the client Co rahom they ate addressed and shall not be repioduced v.ithorut the hull rnof lr'e !the want t es oitapparently dents 1 at}sunilar ptroductseeit:e All letters and reports are tot thesr escluve use of _ our pricer Will n approval. ()III Ictters and reports apply only to the sample tested andor observed and are not necessaril} Actual Percent Passu Location 1314" Sieve-374"�eve4�eve I, Southbound I -ane, 100.0 91.7 60.4 STA 34+50 Outside Lane 2, Southbound Lane, 100.0 96.1 74.6 STA 33+50 Inside Lane 3, Southbound Lane 100.0 95.0 743 STA 35+50 Outside Lane 4, Southbound Lane 100.0 93.0 61.8 STA 33+00 Inside Lane 5, Southbound Lane 100.0 96.0 85.0 STA 31-1-50 inside Lane 6, Southbound Lane 100.0 95.2 72.5 STA 30-,50 Outside L ane Technician: Tex -DOT Item 275 - 2004 Minimum Percent Pal 1'teve leve leve 100.0 85.0 60.0 cc: Mr. Rick O Dell- City ofCoppell Via E -Mail: RODel1@C0ppelltx.g0v Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes- Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr, francisco Luyando- CD Builders, Inc., Phone, 787-688-8207, via E-mail: fluyando@cdbuilderspr TBPE firm. E-3212 Reviewed b GEE Consultants, Inc. { ..M.. . the client Co rahom they ate addressed and shall not be repioduced v.ithorut the hull rnof lr'e !the want t es oitapparently dents 1 at}sunilar ptroductseeit:e All letters and reports are tot thesr escluve use of _ our pricer Will n approval. ()III Ictters and reports apply only to the sample tested andor observed and are not necessaril} • GEOTECHNICAL ENGINEERING El - ENVIRONMENTAL CONSULTING E I -CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 GEE Consultams, Inc. (214) 352-5433 • Fax (214) 352-6972 REPORT OF GROUT MIX OBSERVATION Report Date: April 2, 2015 m Date Oni Placed:October 8, 2014 Standard 2-x2" Specimens Client: City of Coppell Grout Report No: 05 Project: - Freepott Pkwy. Contractor: CD Builders Grout Supplier and Plant: Commercial Grade Quikrete location of Placement: 10,420 OBSERVATION DATA 'rime Sample Batched: 11:00 AM Time Sampled: 11:15 AM FPP 26 Gabion, Row 3, Tie Back C, 1), E Sample Locatiow 10,420 remperature: 7 Ambient Range 81 "F Concrete Range 85"F Weather Conditions: Cloudy Slump Range (inches): N/A "Time Started: 7:00 AM Time Completed: 12:30 PM Sample Air Content(%): N/A 'total Cubic Yards Placed: 0.5 Required strength (Lbs./sq.in.); 3000 Msd. Slumi Ade Date FEMMM FPP 25 N/A 7 10/15/14 10,260 FPP 26 7 10/15/14 10,420 FPP 27 7 10/15/14 10,940 EPP 28 28 11/05/14 16,740 FPP 29 28 11/05/14 16,940 FPP 30 28 11/05/14 16,340 Compressive Strength 's(I 11, 2,570 2,610 2,740 4,190 4,240 4,090 rest Nlethods I H117ed tai 111, SpQcilnews %ladc 1 11 3\ CI) — Asn—i ( "I'll C-11, ( - 143, Remarks and/or Distribution: CC' Mr. Rick 0 Dell- Citv, of Coppell; via E-mail� RODell"ti COPPC,Itx,pov Mr. Michael Garza -'City orcoppell. PllonQ: 972-304-3679, via t: -mail ,M(iarza(d,coppelltx-90v Mr. Mitch Holmes -'league_ Nall & Perkins, phone: 432-312-4205; via E-mail: niholmes,(�(,tripincxom Mr, Francisco Luyando - CD Builders. Inc., Phone: 787-688-8207: via 1:. -mail. lluyando,tkdbuilderspr,com Remarks CEE Consultants, Inc. 'Ifie use of our nanie inust Tccci�c letters and reports are for the exclusive use Of the client to whorn they are add, essed and shall not be I eprodced without the ful I appi oval of G E F consultants, I rc - All sample tested and/or obsei ved and arerr ot necessarily indicative of the quantities of apparently ident ical ot sirru lai products our prior wrifien approval, out letters and reports apply only to the I Cj • GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING GEE Consultants, • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 Y Fax (214) 352-6972 Report Date: April 2, 2015 Date Grout Placed: October 20, 2014 Standard 2"x2" Specimens Client: City of Goppell Project. Freeport'Pkwy. Grout Report No: 06 Contractor: CD Builders Grout Supplier and Plant: Commercial Grade Quikrete Location ofPlacemenr Tic Back Gabion 4 Stage -1, -Rom 2, Nr. G to C) _ OBSERVATION DATA Time Sample Batched: 5:08 .AM Time Sampled:_ 5:10 PM Sample Location: Tie backs Gabion 4: Row 2, Stage 1: Nr. G to 0 Temperature: {Ins.) Ambient Range: Concrete Range: 82°F Weather Conditions: Partly Cloudy Slump Range (inches): N/A `rime Started: 7:30 AM Time Completed: 7:30 PM Sample Air Content(%): N/A Total Cubic Yards Placed: 1 Required Strength (Lbs./sd.in.): 3000 specimen Msd-Slump Aue Dare Tested 'otalLoad ILbs.) Corot, essi,e strength OAb,lSq in.).. _ Remarks Numbet' {Ins.) (Da',) FPP 31 N/A 7 10/27114 12,300 3,080 FPP 32 7 10/27/14 12,560 3,140 FPP 33 7 101/27/14 11,200 2,800 FPP 34 28 1 1 / 1 '7/ 14 16,200 4,050 FPP 35 28 1117/14 16,920 4,230 FPP 36 28 11/17/14 17,500 4,380 Fracmre'Regular Specimens Made By: CP Test M1tethoda Utilized - - ..�-,-.r`r„a rz❑ r_raz .(Unless Noted 6therwiseY — '�� Remarks and/or Distribution: CC' Mr. Rick 0 Dell- City of Coppell: via E -math R0Dell,dcoppellt\.gov Mr: Michael Garza - City of C oriPell, Phone 972-304-3679, via E-mail: MC iarza a coppellty 9 - Mr. Mitch Iholmes - Teague, Nall & Perkins, Phone: 432-312-1205, via I mail: mholmes'u rapine corn Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: tlayandrnt-cdbuilderspr.com 2Reviel, d by (;E ('onsultants Inc. - - - - 'i tile exeluSlve use of the client to 1hom thea, are addressed and shall not be reproduced without the full approval of C [.E Consultants. Inc. 'I lie m e use o our nae Onus ry tecee All letters and reports are bill t u our prior written approval, Our letters and hepotts apply only to ure satriple tested andpr obsrOtcd and are 1101 necessarily indicanve of the quantities of apparently identical or similar products.