ST0502A- LR150217• GEOTECHNICAL ENGINEERING t;EECo►nsultanInc.1 ENVIRONMENTAL CONSULTING CONSTRUCTION MATERIALS TESTING 0046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-697-1 GENERAL REPORT SIEVE ANALYSIS Report Date: Feburary 17,2015 Test Date: December 3,2014 Client: City of Coppell General Report No.: 08 Project: Freeport Pkwy Project No: 214-144 Identification: Sieve Analysis of Road Mixed Material (cement treated) Method of Test: TEX-101-E Page I of I Results S cifications Tex-DZFT' Item 275 - 2004 Actual Percent P Minimum Percent Passing Location V/4" Sieve _i/4"Sieve Noe 13/4" Sieve 314 Sieve #4 Sieve Driveway -3 West Lane 100.0 100.0 75.3 100.0 85.0 60.0 STA 1+70 Driveway 4 West L 100.0 97.4 74.0 STA 3+10 Driveway 3 East Lane 100.0 93.8 64.2 STA 3+30 Driveway 3 East Lane 100.0 100.0 70.8 STA 1+90 Technician: CP cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarzac coppelltx.ggv Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail n1olmes(&,tnpinc,com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207-. via E-mail: fluyando@cdbL]ilderspr.com ,r_ F 3212 hv- F Con!"��of'�e_ JBPV Firm ' F-_ Reviewed Consultants, Inc. The u All letters and reports are for d he client to whont they are addressed and shall not he reproduced without the ['oil approval of GEE is" use of our name must receive our prior written approval Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of identical or similar products. VIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 • Fax (214) 352-6972 Report Date: February 18,2014 Date Grout Placed: February 10,20 15 Standard 2"x2" Specimens Client: City of Coppell Project: Freeport Pkwy, Grout Report No: 09 Contractor: CD Builders ';rout Supplier and Plant: Commercial Grade Quikrete Location of Placement: Tiebacks, Gabions 4, row 4, stage 2 OBSERVATION DATA Time Sample Batched: 1 1 :35 Time Sampled: 11:40 Sample Location: Tiebacks Temperature: FPP 49 Ambient Range: 62°F Concrete Range: 66°F Weather Conditions: Sunny Slump Range (inches): NIA Time Started: 7:OOAM Time Completed: 2:00 PM Sample Air Content(%): N/A Total Cubic Yards Placed: 2 Required Strength (L.bsJsq.in.):3000 31400 Specimen Number Msd. Slump (Inst Age (D vs) Date Tested Total Load (Lbs.) Compressive Strength (Lbs /S In Remarks.) FPP 49 N/A 7 02/17/15 30600 7650 FPP 50 7 02/17/15 30960 7740 FPP 51 '7 02/17/1.5 31400 7850 FPP 52 28 03/10/15 FPP 53 28 03/10/15 FPP 54 28 03/10/15 Test Methods utilized ASTM CI019, C-39, C -I43 Fracture Regular (unless Noted Otherwise) Specimens Made By: CP Remarks and/or Distribution: cc: Rick Odell <ROdell@coppelltx,gov> Mr. Michael Garza - City of Coppell. Phone: 972-304-3679; via E-mail: MGarza(a-coppelltx.gov Mr. Mitch Holmes -Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail mholmes(a)tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail t1uyando@cdbuiiderspr.com GEE; Consultants, Inc. ^�! -� Reviewed by u—(, �y4o"V f C All tetters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GFE Consultants, Inc,. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities ofapparently identical or siinilar products, GE01"ECHNICAL ENGINEERING F'�VIRONMENTAL CONSULTING E UEE Consultants, Inc. i E a 'C'ONSTRUCTION NIATERIALSTESTINIG roe Drive Dallas, lexaS .7-3229 f`ax 1214 352-6,)71' REINFORCING STEEL PLACEMENT Report Date: February 16, 2015 Test Date: December 2, 2014 Client: City of Coppell General Report No.: 86 Project Freeport Pkwy Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page I of I Results On December 2,2014 reinforcing steel was observed at the following locations: Inlet Sta. 13+20 South bound Inlet Sta. 2+45, 5+45, 7-1-17 North boud The following discrepancies were noted and called to the attention of Antonio a representative of CDBuilders. 1. Clean the bottom area 2. Fix chair for rebar. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; 12-4205; via E-mail: mholmes@tnpine.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuil(.ierspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must re our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.