Loading...
ST0502A- LR150409G -GEOTECHNICAL ENGINEERING E • ENVIRONMEN-17ALCONSULl'ING GEE Consultants, Inc. -CONSI RUCTION MATERIALS TESTING 10046 Monroe Drive D ) I I a -,, Texas 7:32 2 1) ,2 141) 352- 5433 Fax 1214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date. April 9. 2015 i)aw Concrete Placed Client: City of Coppell project: Freeport Pkwy from Ruby Rd, to Sandy Lake Rd. Contractor; CD Builders inc. Concrete Supplier and plant Argos 41 10 Location of Placenienr Columns 2 -E;2 -F; fly over utility S. and N. February 10, 2015 Standard 6"x12° CNfinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 131 project No.: 2 14-0 144 Source SSD Batch Wts. OBSERVATION DATA MATERIALS Description (Lbs/C uYd) Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate Fine Aggregate: Admixtures: 2 Added Water: Specimen Number FPP 521 Measured Slump (ill.) 1083 Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: 0 Time Completed: Sample Air Content Total Cubic Yards Placed: Required Strength (Lbs./sq.i FPP 522 4. FPP PP 523 FPP 524 , fest Methods Utilized ASTM C-31, C-39, C-143 Age (Days) 7 28 28 H Date 'I ested 2i17/I5 _3110/15 3/10/15 Hold Fracture Regular (Unless Noted Otherwise I otal Load I compressive Strength I (I,bs./Sq.In.) 41 "16 80' 11,1680-1 4060+- 1333)2720+ 4,690 Z 1 '34470 4,760+ Cylinders Made By: CP 10:34 AM 11:10 AM Inlet STA 15+00-17 4027 /1570336 62 OF 66 OF 4 Sunny 10:00 AM 1:00 PM 3.8 to 3600 Remarks Remarks and/or Distribution:- None cc: Rick Odell <ROdeII0)cOPPcI1tx,g0\`_' Mr, Michael Garza - City Of COPPell- Phone: 972-304-3679;via E-mail: MGarzacoppelltx-,_Wv Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 4 32-3124205via E-mail: mholmes@tnpine.com Mr. Francisco Luyando - CD Builders, Inc- Phone: 787-688-8207-, via E-mail: fluyando@,cdbuilderspr.com TBPF Firm: F-3212 Reviewed by: (EE Consultants, Inc.1" val of GEV. Consulta llie ase ot out nartle must V p products. 1 10 kNijoin they are addicssedand s11811 Ilka be reproduced without tile full 11, 1"o All letters gild reports ale 1`01 the exclvl�'ve ase of the C"e" � of the quataities of apparentlY ideatical ori site pi jecelve )it,, ),-lot written applo\al OLII ICUUS and reports aptliv only to ille sample tested and/or observed and are not tiecessaidy indicati, (; 1 - GEOTECHNICAL ENCINEIRING E • ENVIRONMENTAL CONSULTING JL— GEE Consultants, Inc. E • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 7522{3 i2141 352-5433 0 Fax (214) 3S, -I-6972 REPORT OF GROUT MIX OBSERVATION Report Date: April 10, 2015 Client: City of Coppell Project: Freeport Pkwy. Contractor: CD Builders Grout Supplier and Plant: Commercial Grade ()Llikrete Location ol'Placement: Tiebacks, Gabions 4. row 4, OBSERVATION DATA Time Sample Batched: 11: 3'7 Time SatoplQd, 11:40 Sample Location: 'Tiebacks Temperature: FPP 49 Ambient Range: 620E Concrete Rangc: 660F Weather Conditions: Sunny Slump Range (inches): N/A Time Started: 7:00AN/l Time Completed: 2:00 PN4 Sample Air Content(%): N/A Total Cubic Yards Placed: 2 Required Sireniath (I,bs./sq.in.):3000 31,400 Date Grout Placed: February 10,2015 2 Standard 2"x2" Specimens Grout Report No: 09 specimen Number \Isd Sl,,l,,p (Inst Age () Date ILe d I"I'd Load (I tis_) .,- Cons), e,s,, e Sit e,,gt 1, tt bs Sq I,a Remarks FPP 49 N/A 7 02/17/15 30,600 7,650 ITP 50 7 02,i 1 1'7'15 30,960 7,740 FPP 51 7 02/ 17115 31,400 7,850 FPP 52 28 03/ 10/15 32,480 8,120 FPP 53 28 01110115 32,380 8,100 FPP 54 28 03/10/15 29,660 7,420 Test Methods Utilized hacture Replar Specimens Made By: CP ASTM CI()I'),( _39,C-141 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Rick Odell <ROdell@coppelltx.,",ov> Mr, Michael Garza - Cit} Of ('()r)Pcll, Phone: 972-304-3679: via I --mail: MGarza(eL'coppclltx gov Mr. Much I-lohn- -'Feagi-le. Nall &, Perkins, pljolje: 432-312-4' 01, via F-inail: 1111101"IcsIt-i'llipilic ' corn Mr. Francisco Lu\ a ndo - CD Builders, uilders, I Ile., ('hone: 787-688-8207i via I mail: [ILI vando,,LicdbUildersprA116n1 Kevie cd h\: (;I,,E Consultants, Inc., �I receive 1,11alas, Inc 'I ht use Of OLII name Intl, All lValms and lepolts ate I'm the nclusi, e li,e "t 11C client to "hom tile\ ate add i ct,cd and 111111,1"t he reproduced '011olo the fall apploNal ot'GH jjjjV,jc rested and of and ate not llecesalll\ 111,11catlNe fl , the qjjantiiie5 ofappaietitl,� IdCal(lCal 01 [Tllli',Il laoducts, 0111 Pilot "totes appimal Our IVIIUI� and repoth applyle the.