ST0502A- LR150417iNIC-AL ENGINEERING VIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texis 75229 • (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 17, 2015 Test Date: April 7, 2015 Client: City of Coppell General Report No.: 95 Project Freeport Pkwy Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of I Results On April 7, 2015 reinforcing steel was observed at the following locations: Columns - post trail bridge stage 2. The following discrepancies were noted and called to the attention of Alejandro a representative of CD Builders 1. Clean out bottom area 2. Make sure is rebar support provides proper cover for concrete. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- CitY of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes -'Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants. Inc. The use of out name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. GEOTECHNICAL ENGINEERING C- ENVIRONMENTAL CONSULTING GEE Consultants, Inc. JJ- CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive 0 Dallas, Texas 75229 & (214) 352-5433 • Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 20, 2015 Test Date: April 14, 2015 Client: City of Coppell General Report No.: 106 Project Freeport Pkwy Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of I Results On April 14, 2015 reinforcing steel was observed at the following locations: Pavement north bound STA. 14+80 to 15+50. The following discrepancies were noted and called to the attention of Antonio representative of CD Builders. 1. Missing 2 rebar connections with existing pavement. 2. Need to use diagonal rebar int the comer of forms for inlet 3. Clean area. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza'- City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes'; Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@edbuil"r.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive out prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products,