ST0502A- LR150417 (2)iNICAL ENGINEERING VIRONMENTAL CONSULTING * CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: April 17, 2015 Date Concrete Placed: March 19, 2015 Standard 6"xI2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 138 Contractor: CD Builders Inc, Project No.: 214-0144 Concrete Supplier and Plant: Argos#125 Location or Placement: Pavement North Bound MATERIALS Source SSD [latch Wts. OBSERVATION DATA Total Load (I,bS,) Compressive Strength (I bs., Sq. I if.) Description (I bs CuYd) FPP 549 Mix Number: 1273 Time Sample Batched: 7:52 AM Cement: FPP 550 Time Sampled: 8:15 AM FIA, Ash: 157A604- Sample Location: STA 24--50 Pavement North Coarse Aggregate: 4 Bound Intermediate Aggregate: Truck / Ticket No: 7089 /1583406 Fine Aggregate: 28 Temperature: 161,300+ )00+ 5,710+ Ambient Range: 60 OF Admixtures: Hold Concrete Range: 68 OF I Test Methods Utilized Slump Range (inches): 4 2 (Unless Noted Otherwise) Weather Conditions: Cloudy Added Water: 0 Time Started: 7:00 AM Time Completed: 5:00 PM Sample Air Content (%): 3.6 Total Cubic Yards Placed: 10 ReOUired Strenath (I.,bs./sa.in.): 3600 Specimen Number Measured Slump (in.) Age (w\ S) Date 'I estQd Total Load (I,bS,) Compressive Strength (I bs., Sq. I if.) Remarks FPP 549 7 31/26/15 142,280 5,030 FPP 550 28 4/16/15 157A604- 5,570 4 FPP 551 28 4/16/15 161,300+ )00+ 5,710+ FPP 552 H Hold Test Methods Utilized Uracture Regular Cylinders Made l3v CP I ASTM C-31, C-39, C-143 (Unless Noted Otherwise) I Remarks and/or Distribution:- None cc: Rick Odell <ROdell@coppelltx,gov> Mr. Michael Garza - City of Coppell, Phone: 972-304-3679-, via E-mail: MGarza(�-�.Icoppelltx.gov Mr. Mitch Holmes - Teague, -Lie, Nall & Perkins, Phone: 432-3) 12-4205; via E-mail: i-nholmes@tnpinc.coni Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-6888207-, via E-mail: fluyando@edbuilderspncorn (IFE Consultants, Inc. I'BPE Firm: F-3212 Reviewed by: k w�,,)Ual_loc�­' All letters and reports are for the exclusive use of the Client to whom they are addressed and shall not be reproduced without tire full approval of GEE ('011SLIhaflIS, tire The use Of our name must receive Our prior written appimal Our letters and reports apple only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products, -IGI * GEOTECHNICAL ENGINEERING E I * ENVIRONMENTAL CONSULTING E I - CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: April 17, 2015 Date Concrete Placed Client: City of Coppell Pro , ject: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Contractor: CD Builders Inc. Concrete Supplier and Plant: Argos Location of Placement: Pavement North Bound STA 2' ) '-50 March 15, 2015 Standard 6"x12" Cylinders Cylinder Cross-sectional Area: 28.27 Square Incites Concrete Report No.: 139 Project No.: 214-6144 MATERIALS Source i Description SSD Batch Wts. OBSERVATION DATA (Lbs/CuYd) Age (Days) Mix Number: 1273 Time Sample Batched: 10:03 AM Cement: Time Sampled: 10:55 AM 7 Sample Location: STA 23+50 Pavement North FIN Ash: Bound Coarse Aggregate: Truck / Ticket No: 7083 /1583622 Intermediate Aggregate: Temperature: Fine Aggregate: Ambient Range: 63 OF Admixtures: Concrete Range: 70 `F I Slump Range (inches): 2.75 2 Weather Conditions: Cloudy Added Water: 0 Time Started: 7:00 AM Fracture Regular Time Completed: 5:00 PM (Unless Noted Otherwise) Sample Air Content (%): .3.8 Total Cubic Yards Placed: 110 Q—t;—ri Qtrpnoth it he /qn in )' 1600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks FPP 553 7 3/26/15 128,040+ 4,530+ FPP 554 28 1/ 416/15 154,340+- 5,460-+ FPP 555 2.75 28 4/16/15 175,580 6,210 FPP 556 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: CP ASTM C-31, C-39, C-1431 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Rick Odell <ROdcIF(ji)coppeIItx.gov> Mr. Michael Garza - City of Coppell, Phone: 972-304-3679-. via F-111ail.. MGarza6 , oppelltx.-ov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com '7 Mr. Francisco Luyando -CD Builders. Inc_ Phone: 787-688-8207; via E-mail: fIuyando(,nPcdbUiIderspr.corn GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are to, the exclusive use of the client to whomthey are addressed and shall not be reproduced without the full approval of GEE Consultauts. file The use of our [lame must receive our 1)[101 written approval Our letters and reports apply only to the sample tested andror observed and are not necessarily indicative of the quantities of apparently ideafical or similar products. G I* GEOTECHNICAL ENGINEERING E I* ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 & Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: April 17, 2015 Date Concrete Placed: March 19, 2015 Standard 6"xl2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches pro ' ject: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 140 Contractor: CD Builders Inc. Project No.: 214-0144 Concrete Supplier and Plant; Argos Location ol'Placement. Pavement North Bound STA 22+00 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (f.bs/CuYd) Mix Number: 1273 Time Sample Batched: 1:10 PM Cement: Time Sampled: 2:00 PM Fly Ash: Sample Location: STA 22+00 Pavement North Coarse Aggregate: 3/26/15 Bound Intermediate Aggregate: 'Truck / Ticket No: 3551 /1583842 Temperature: 4/16!15 Fine Aggregate: Ambient Range: 62 OF Admixtures: Concrete Range: 71 OF I Slump Range (inches): 3.5 2 Weather Conditions: Cloudy Added Water: 0 Time Started: 7:00 AM Time Completed: 5:00 PM Fracture Regular Sample Air Content (%): 3.4 (Unless Noted Otherwise) Total Cubic Yards Placed: 210 Reouired Streiwth (Lbs./so.in.): 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested 'Total Load (l,hs.) Compressive Strength (Lbs./Sq.lri.) Remarks FPP 557 7 3/26/15 127A00 -i 4,510-+ ,5104- FPP 558 FPP558 28 4/16!15 170.780 6,040 FPP 559 28 4/16/15 166,100 5,880 FPP 560 1-1 1 Hold I I Test Methods Utilized Fracture Regular CNiniders Made By: CP I ASTM C-31, C-39. 0-143 (Unless Noted Otherwise) - Remarks and/or Distribution:- None cc: Rick Odell <ROdell@coppelltx.gov> Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; 12-4205-, via E-mail: i-nholmes@tnpinc.com Mr, Francisco L,uyando - CD Builders, Inc.. Phone: 787-688-8207: via E-mail: fILlyando @cdbuilderspr,com GEE Consultants, tne. TBPE Firm: F-3212 Reviewed by: t All letters and reports are lot the e\JUSIVe LISC Of the Chellt to "110to they are addiowd and;hall not be leplo'lliced without the fult appioNal of GEF F Consultants, Inc. file use Of our name must receive out pilot written approlal. Out letters and iepoits appk only to the sample rested and (it observed and are not necosaitil indicative of the quantities of apparently identical or similar products. iNICAL ENGINEERING VIRONMENTAL CONSULTING * CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 # (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: April 17, 2015 Date Concrete placed, Client: City of Coppell Protect: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Contractor: CD Builders Inc. Concrete Supplier and Plant: Argos, 110 Location ot'Placement: pavement North Bound STA. 25-400 March 30, 2015 Standard 6"x12" Cylinders Cylinder Cross-sectional Area: 28.27 Square Inches Concrete Report No.: 155 Project No.: 2 14-0 144 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (L,bs/CuYd) Mix Number: 1273 Time Sample Batched: 12:54 PM Cement: 'Time Sampled: 1:35 AM Fly Ash: Sample Location: Pavement North Bound STA. Coarse Aggregate: 4/6/15 251-00 Intermediate Aggregate: Truck / Ticket No: 4073/1589795 Fine Aggregate: Temperature: 4/27/15 Admixtures: Ambient Range: 72 OF FPP 619 Concrete Range: 76 OF I Slump Range (inches): 4.5 2 Weather Conditions: Cloudy. Added Water: 0 Time Started: 7:30 AM Time Completed: 6:30 PM Fracture Regular Sample Air Content 4.0 (Unless Noted Otherwise) Total Cubic Yards Placed: 10 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs) Compressive Strength (Lbs./Sq.ln.) Remarks FPP 617 7 4/6/15 120,120 4,250 FPP 618 45 28 4/27/15 FPP 619 . 28 4/27/15 FPP 620 H Hold Test Methods Utilized Fracture Regular ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Cylinders Made By: CP Remarks and/or Distribution:- None cc: Rick Odell <RO&IIC(�coppelltx.gov> Mr. Michael Garza-- City of Coppell, Phone: 972-304-3679-, via E-mail: MGarza( coppelltx,gov Mr. Mitch I loh-nes - Teague. Nall & Perkins, Phone: 432-312-4205; via E-mail: rnholrnes�tnpinc.corn Mr. Francisco I_Llyando - CE) Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbt.lilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the eXCIUSIVC use of the CliCla to whom they are addressed and shall not be reproduced miliout the frill approval of GEF Consultants. Inc. rhe use of our name must receive our prior written approval- Our letters and reports apply only to the sample tested an(for observed and are riot necessarily indicative of the quantities of apparently identical or similar products. � | � � � | - GEOTECHNICAL, ENGINEERING Ei | -ENVIRONMENTAL CONSULTING CONSTRUCTION MATERIALS TESTING GEE Consultanis, Inc. l0046Monroe Drive Dallas, Texas 75229 (214)]52`S433 Fax(214)3S2-6972 REPORT OF CONC.1RETE MIX OBSERVATION Report Date: c/ienc pnuxu commm"c Concrete Supplier and Plant: Location of Placement: April l7,20|5 Date Concrete Placed: March 2k2U|5 Standard ox/z^Cylinders `y Ci of Coppell Cylinder Cross-sectional Area: zo.z7Square Inches Kuhv Rd. to Sandy |-ake Rd Concrete Report wu: 151 cu Builders Inc. proJeu No.: 214-0144 Pavement South Bound 8TA.4+QO MATERIALS Source / SSD,Batch Wts. OBSERVATION DATA Compressive Strength (Lhs.�S+lnj Remarks Description (Lbs/CuYd) 7 Mix Number: 1272 Time Sample Batched: 11:09 AM Cement: Time Sampled: 12:10 PM Fly Ash: Sample Location: Pavement South Bound STA. Coarse Aggregate: 28 4/23/15 4+80 Intermediate Aggregate: Truck / Ticket No: 7089/1587605 Fine Aggregate: Temperature: ' Admixtures: Test Methods Utilized Ambient Range: 60 `F ASTM C-31, C -39 C-143 (Unless Noted Cfther,kisc) Concrete Range: 68 `F | Slump Range (inchcu' : 2,5 2 Weather Conditions: Cloudy/ Windy xuVnd Water: 0 Time Started: 8:15 AM Time Completed: 4:00 PM Sample Air Content (Y): 3.6 Total Cubic Yards Placed: 118 Specimen Number Measured Slurnp (in) Age (Da\ s) Date Tested Total Load (I,bs.) Compressive Strength (Lhs.�S+lnj Remarks FPP 601 7 4/2/15 1 19,680 4,230 FPP 603 28 4/23/15 Test Methods Utilized Fracture Regular ASTM C-31, C -39 C-143 (Unless Noted Cfther,kisc) ylinders Made By� CP Remarks and/or Distributiow- None cc: Rick Odell <KOdeU |hx.gov> Mr. Michael Ourzu-City o[Cuppo|i Phone: 972-304-3679; yk/ E-mail: \kx.gnv Mr. Mitch uohneo ' Teague, Nall 8L Perkins, Phone: 432-3 12-4205; via E-mail: mho|mcs@c,)tnpinc.uom Mk. Francisco Luyundo-CD Rui|doo. Inc., Phone: 787-688'8207; via E-mail: OuyanJo0cdbui|derspnoom GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: G - GEOTECHNICAL, ENGINEERING E! E | ° CONSTRUCTION MATERIALS TESTING * ENVIRONMENTAL CONSULTING GEE Consultams, Inc.�� 10046 MonroeDhve ~ Dallas, Texas 75229 ° (214)]S2 -S43] ° Fax(2l4)352-6972 REPORT OFK-ONE MIX OBSERVATION Report Date: April 17, 2015 Date Concrete Placed: March '10, 2015 Standard 6"xl2" Cylinders om*c City of Coppell Cylinder Cross-sectional Area: zo,z,Square Inches Pro F Ruby Rd. mSandy Lake Rd. Concrete rt 154 Contractor: CD Builders Inc. rro'ieu w^:2|4 -0l44 Concrete Supplier and Plant: Argos 110 L^ca/umo/pucennen/: Brigx-|/2 Slab Right Side, 5'o[Abutment MATERIALS Source / SSD Batch uts . OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1251 Time Sample Batched: 8:19 AM C,cmcn: Time Sampled: 9:40 AM RyAoh: Sample Location: Drigc \/2 Slab Right Side, 5' Coarse Aggregate: 4/6/15 of Abutment Intermediate Aggregate: Truob/T�ke^ Y4o'' 7033/1589393 |cmpcm�m� 4/27/15 Fine Aggregate: Ambient Kun�e- 65"F r � &dm�mm� Conum�Ran Au: 74°F ' Slump Range (inchcn): 4.5 2 Weather Conditions: Mostly Cloudy Added Water: O Time Started: 7:30&M1 Time Completed: 6:30 PM Fracture Regular Sample Air Content 3.4 (Unless Noted Otherwise) Total Cubic Yards Placed: 10 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.ln.) Remarks FPP 613 7 4/6/15 162,000 5,730 FPP 614 28 4/27/15 FPP 615 4.5 28 4/27/15 Test Methods Utilized Fracture Regular Cylinders Made By: CP I ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution:- None cc: Rick Odell <K0dcU6&,00ppcUtx.@pv> K4c k4iuhud Gorzo- City ofCnppcO. Phone: 972-304-3679via 2 -nail: MG |hx.gov Mr. Mitch Ho|mcu-Tcu-ue, Nall & Perkins, Phone: 432-3124205� via B -mail: mho|mcs�}mpino.com Mr PnmciucoLuyuudo-CD 8uiNcm. Inc., Phone: 787-688-8207; vinF-rnoi|: UuyundoJ,-cdbuUdorspx,cnm GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letteis and ictiorts are foi the e\clusi�e u Ic ol, the Client to M10111 tho are addlessed and Shall not tic leploduced wilhow the full appio%al of GEE C'onsul�ants. hic. I -lie use ofour name must lecelve oul pliol wiluen apploNal 0111 lettels and seports appIN onk to the sample tested andoi obserNed and ale not nec",,aijk indicative ofthe qLKintifies ofaliparenfly identical oi sinularlitoducts. 'INK4LENG{NBFUNG VIRONMENTAL CONSULTING - CONSTRUCTION MATERIALS TESTING GEEConsultants,�Inc. 10046 Monroe Drive Dallas, Texas'75229 0 (214) 352-5433 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT � Report Date: April 17, 2015 Test Date: March 3 1, 2015 Client: City of Coppell Project Freeport Pkwy Identification Reinforcing Steel Observation Method of Test Visual Observation General Report No.: 97 Project No.: 214-144 Page I of I ` On March 3 1, 2015 reinforcing steel was observed at the following locations: |. Pavement |Hbound STA, 19+00 to }0+50, 2. Pavernent S bound STA. 2400 to 2+50. The l'ollowing discrepancies were noted and called to the attention of Antpnio a representative of CD Builders . i Missing } ruburfor south bound� need to be supplemented. 2.Clean area ]. Need Wsupplemented with nhursupport. 4.Need tofixed rcbnruncurbo. The above discrepancies; were corrected asnoted, Technician: CP cc: Mr. Rick ODell- City ofCoppcUVia G-Mbi|:R0Dc| |kx.gov Nr. Michael Garza - City ofCoppcU.Phone: 972-304' i via E-mu|:—'|bx.gov Mr Mitch Holmes - Teague, Nall & Perkins, Phone: 432-3l2-4205;via E -moi|: o|uo@Unpioo.onm Mr. Francisco [Alyando - CD Builders, Inc., Phone: 787-688-8207� via E-mail: fluyando q_(cdbUilderspr,com G G I - GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 17, 2015 Test Date: March 30, 2015 Client: City of Coppell General Report No.: 98 Project Freeport Pkwy Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page I of I Results On March 30, 2015 reinforcing steel was observed at the following locations: 1, Pavement N bound STA. 25+10 to 24+80. 2. Pavement S bound STA. 20+50 to 10+30. The following discrepancies were noted and called to the attention of Antpnio a representative of CD Builders . 1. Clean area ( piece of wood; Plastic) 2, Supplemented with rebar support. 3. Missing I rebar connection with existing concrete for south bound. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpiylc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 ReviewedE Consultants, Inc. The use of our name mus rei =1 letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GE our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. JV J • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 16 (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 17, 2015 Test Date: March 27, 2015 Client: City of Coppell General Report No.: 1.00 Project Freeport Pkwy Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page I of I Results On March 27, 2015 reinforcing steel was observed at the following locations: Pavement south bound STA. 2+00 to 4+00 The following discrepancies were noted and called to the attention of Antonio a representative of CD Builders . 1. Missing diagonal rebar for the comer. 2. Supplemented rebar support, 3. Fixed distance between rebar (adjust 16.5"to 20") The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: tters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc, The use of name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. INICAL ENGINEERING VIRONMENTAL CONSULTING # CONSTRUCTION MATERIALS TESTING GEE Consultants!, Inc. 10046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 17, 2015 Test Date: March 25, 2015 Client: City of Coppell Project Freeport Pkwy Identification Reinforcing Steel Observation General Report No.: 101 Project No.: 214-144 Method of Test Visual Observation Page I of I Results On March 25, 2015 reinforcing steel was observed at the following locations: Pavement south bound STA. 6+00 to 10+00 The following discrepancies were noted and called to the attention of Antonio a representative of CD Builders . 1. Curb rebar STA. 8+20 to 9+50 need to be fixed rebar for correct concrete coverment. 2. Adjust rebar distance 18" ( they have 16.5" to 19.5"). The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx,gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbui .,!,"ncom GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must re our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.