Loading...
ST0502A- LR150420 (2)} • GEOTECHNICAL ENGINEERING ' 1 • ENVIRONMENTAL CONSULTING, GEE roc. E 1 • CONSTRUCTION MATERIALS TESTING i 0046 Monroe Dave Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 SIEVE ANALYSIS OF PAVEMENT SUBGRADE MATERIAL (ASTM C 136) Project No.: 214-0142 Report Date: April 20, 2015 Project: Freeport Parkway, Coppell, TX Date Sampled: February 12, 2015 Client: City of Coppell Sample No.: 13 Material Description: Pavement Subgrade Flex Base Type Material - Tan and Gray Crushed Limestone and Fragments Texas Department of Transportation Standard Specification for Construction of Highways, Streets and Bridges, Item 247, Grade I Specifications: Sieve Size Individual % Retained Cumulative % Retained Cumulative % Required For Grade I Flex Base 13/4't 0.0 0.0 0 7/811 11.3 11.3 10- 35 3/8" 24.0 35.3 1E 30- 50 No. 4 24.1 59.4 45 -65 No. 40 24.0 83.4 70 - 85 Maximum Liquid Limit (L.L.) = 35 Actual Liquid Limit (L.L.) = 21 Maximum Plasticity Index (P.I.) = 10 Actual Plasticity Index (P.I.) = 7 cc: Mr. Rick Odell - Rodell@coppelltx.gov Mr.Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed b - All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The a of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. iNICAL ENGINEERING VIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 » Fax (214) 352-6972 GENERAL REPORT SIEVE ANALYSIS Report Date: April 20, 2015 Client: City of Coppell Test Date: March 24, 2015 General Report No.: 11 Project: Freeport Pkwy Project No: 214-144 Identification: Sieve Analysis of Road Mixed Material (cement treated) Method of Test: TEX-101-E (Sieve Analysis of Road Mixed Stabilized Material) Specification: Tex -DOT Item 275AD-2004 (Gradation Requirements for Cement Treated Material) Page I of I Results Location 1. South Bound, Inside Lane STA 2+10 2. South Bound, Outside Lane STA 2+70 3. South Bound, Inside Lane STA 3+80 4. South Bound, Outside Lane STA 4+50 Technician: CP Actual Percent Passing 11/4' Sieve leve 114 Sieve 100.0 100.0 90.0 100.0 94.8 67.0 100.0 100.0 85.7 100.0 96.0 81.0 Specifications Tex -DOT Item 275 Minimum Percent Passing� 1'4 leve Sieve Sieve 100.0 85.0 60.0 cc: Mr. Rick O Dell- City of Coppell Via E -Mail: RODeII@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304- 679; via E-mail: MGarza(7a coppelltx.gov Mr. Mitch Holmes - Teague, Nall. & Perkins, Phone: 432-312-4205; via E-mail: m`�holmesi�a toppmc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuiiderspr.com GEE Consultants, Inc- THPF Firm F-3212 Revie ed hv- All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of o r name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive « Dallas, Texas 75229 • (214) 352-5433 « Fax (214) 352-6972 GENERAL REPORT SIEVE ANALYSIS Report Date: April 20, 2015 Test Date: March 18, 2015 Client: City of Copped General Report No.: 12 Project: Freeport Pkwy Project No: 214-144 Identification: Sieve Analysis of Road Mixed Material (cement treated) Method of Test: TEX-101-E (Sieve Analysis of Road Mixed Stabilized Material) Specification: Tex -DOT Item 275AD-2004 (Gradation Requirements for Cement Treated Material) Page 1 of l Results 1. North Bound, Inside Lane STA 2. North Bound, Outside Lane STA 3.North Bound, Inside Lane STA 4. North Bound, Outside Lane STA Technician: CP Actual Percent Passing 13/" Sieve ieve i44 Sieve 100.0 100.0 67.0 100.0 100'..0 73.5 100.0 100.0 83.9 1.00.0 100.0 80.0 Specifications Tex -DOT Item 275 Minimum Percent Pass�mg�� 134 , ►eve Sieve neve 100.0 85,0 60.0 cc: Mr. Rick O Dell- City of Coppell Via E -Mail: RODellCoppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304- 679; via E-mail: MGarza(a�coppelltx.gov Mr, Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: 2olmes@topmc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com (TEF' ('nncnitant�, In "1 KFE, Firm• F-3212 tceV]ewea�zv: � . r ';"' All letters and reports are for the" use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE onsultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive « Dallas, Texas 75229 « (214) 352-5433 « Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 17, 2015 Client: City of Coppell Project Freeport Pkwy Identification Reinforcing Steel Observation Test Date: March 26, 2015 General Report No.: 102 Project No.: 214-144 Method of Test Visual Observation Page 1 of 1 Results On March 26, 2015 reinforcing steel was observed at the following locations: Pavement south bound STA. 6+00 to 3+50 The following discrepancies were noted and called to the attention of Antonio a representative of CD Builders . 1. Need to fix rebar for curb at STA. 5+50 2. Supplemented area with rebar support 3. Supplemented with diagonal rebar for corner in front of inlet. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick O Dell- City of Coppell Via E -Mail: R O Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com lei) i GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: ` fhe use of AA leour pand rior written approval. Our letters and reports apply only to the sample tested and/or�ob observed d are not necessarily indicative of the quantities of apparently identical oro imila products. V I • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultan.0 ts, Inc. 10046 Monroe Drive • Dallas, Texas 75229 « (214) 352-5433 • Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 20, 2015 Client: City of Coppell Project Freeport Pkwy Identification Reinforcing Steel Observation Method of Test Visual Observation Test Date: March 23, 2015 General Report No.: 104 Project No.: 214-144 Page 1 of 1 Results On March 23, 2015 reinforcing steel was observed at the following locations: Pavement north bound STA. 12+40 to 15+50. At this time, observed that the end corner of concrete was broken at STA. 12+10; they need to cut straight and make the connection with new pavement. The following discrepancies were noted and called to the attention of Antonio representative of CD Builders . 1. Supplemented with rebar support. 2. Clean area (piece of wood) The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick O Dell- City of Coppell Via E -Mail: R O Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders; Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: etters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G I - GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING GEE Consultants, Inc . CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 20, 2015 Client: City of Coppell Project Freeport Pkwy Identification Reinforcing Steel Observation Method of Test Visual Observation Results Test Date: March 18, 2015 Report No.: 105 Project No.: 214-144 On March 18, 2015 reinforcing steel was observed at the following locations: Pavement north bound STA. 19+50 to 25+00. The following discrepancies were noted and called to the attention of Antonio representative of CD Builders 1. Need to fixed I diagonal rebar for each comer. 2. Supplemented with I rebar closer to 3" for forms. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.go Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E -mai Mr. Mitch Holmes -Teague, Nall & Perkins, Phone: 432-312-4205; vi Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via GEE Consultants, Inc. TBPE Firm: F-3212 letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily I of I MGarza@coppelltx.gov E-mail: mholmes@tnpinc.com -mail: fluyando@cdbuilderspr.com approval of GEE Consultants, Inc. The use of our name must receive ,stive of the quantities of apparently identical or similar products,