ST0502A- LR150416­INICAL ENGINEERING VIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 16, 2015 Client: City of Coppell Project Freeport Parkway Test Date: February 20,', 2015 General Report No.: 97 Project No.: 214-144 identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of 1 Results On February 20, 2015 reinforcing steel was observed at the following locations: Bent 2, Stage 2 The following discrepancies were noted and called to the attention of Alehandro, a representative of CD Builders. 1) Missing bar "U" connecting with stage 1. 2) Supplemented with 2 bar "U" on the end of bent. 3) Supplemented with wire connection lap of bar "T". 4) Clean area in the bottom. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick O Dell- City of Coppell Via E -Mail: R O Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mhohnes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc TBPE Firm: F-3212 Reviewed py:- All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants Inc The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. >j' • GEOTECHNICAL ENGINEERING E • ENVIRONMENTAL CONSULTING GEE • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Consultan-C ts, Inc. Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 16, 2015 Test Date: March 17, 2015 Client: City of Coppell General Report No.: 98 ' Project Freeport Parkway Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Paae 1 of 1 Results On March 17, 2015 reinforcing steel was observed at the following locations: Shear key bridge stage 2 The following discrepancies were noted and called to the attention of Alehandro, a representative of CD Builders. 1. Clean the wood from between the 'beams. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick O Dell- City of Coppell Via E -Mail: R O Dell@Coppelltx.gov Mr. Michael. Garza - City of Coppell, Phone: 972-304-3679; via E-mail: Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via 1 Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E .com GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of ourname must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. INICAL ENGINEERING VIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 16, 2015 Test Date: April 06, 2015 Client: City of Coppell General Report No.: 109 Project Freeport Parkway Project No.: 214-144 Identification Reinfbrcing Steel Observation Method of Test Visual Observation Page 1 of 1, Results On April 06, 2015 reinforcing steel was observed at the following locations: 1) -/,. Slab 2) Bridge, Stage 2 The following discrepancies were noted and called to the attention of Alehandro, a representative of CD Build 1) Fix the rebar from stage I to stage 2 to have continuation. 2) Supplement rebar close to joint of abutmentl and abutment 4. 3) Clean the area. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail• mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed All letters and reports are for the exclusive use or the client to Whom they are addressed and shall not be reproduced without the full approval of GEE Consultants Inc The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G I • GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 • Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 20, 2015 Client: City of Coppell Project Freeport Parkway Identification Reinfbrcing Steel Observation Test Date: April 03, 2015 General Report No.: 108 Project No.: 214-144 Method of Test Visual Observation Page 1 of 1 Results On April 03, 2015 reinforcing steel was observed at the following locations: Inlet top STA 7+17 .. Inlet curb STA 3+30 & STA 5+45 The following discrepancies were noted and called to the attention of Antonio, a representative of CD Builders. 1) For inlet top they need to supplemented diagonal bars around ring 2) Clean existing wall to have a good continuation with new concrete 3) Use rebar support. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick O Dell- City of Coppell Via E -Mail: R O Dell@Coppelltx.gov Mr. Michael Garza. - City of Coppell; Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco I uyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: k, All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc, The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. " -INICAL ENGINEERING VIRONMEiNTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 21, 2015 Test Date: April 06, 2015 Client: City of Coppell General Report No.: 110 Project Freeport Parkway Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of 1 Results On April 06, 2015 reinforcing steel was observed at the following locations: Pavement decel lane STA 27+00 to 29+00 ; STA 30+50 to 32+50 The following discrepancies were noted and called to the attention of Antonio, a representative of CD Builders. 1) Supplemented with rebar support 2) Clean the pieces of wood and concrete from the area 3) Clean the flex base off the end. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick O Dell- City of Coppell Via E -Mail: R O Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@edbuilderspr.com GEE Consultants, Inc TBPE'Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of ourname must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. iNICAL ENGINEERING VIRONMENTAL CONSULTING * CONSTRUCTION MATERIALS TESTING A .- GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 # (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April, 16, 2015 Test Date: April 09, 2015 Client: City of Coppell General Report No.: 113 Project Freeport Parkway Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page I of 1 Results On April 09, 2015 reinforcing steel was observed at the following locations: Driveway 6 The following discrepancies were noted and called to the attention of Antonio, a representative of CD Builders. 1) Supplemented connection with existing pavement. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: i All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultan6, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. (; I . GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING E I -CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 •Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 23, 2015 Test Date: April 20, 2015 Client: City of Coppell Project Freeport Pkwy Identification Reinforcing Steel Observation Method of Test Visual Observation General Report No.: 116 Project No.: 214-144 .Lage I of I Results I On April 23, 2015 reinforcing steel was observed at the following locations: I. Inlet curb STA. 14+90 2. Inlet wall and top STA. 18+60 3. Rail trail bridge stage 2 - 2 segments between bent 2 and bent 3 The following discrepancies were noted and called to the attention of Antonio & Manuel, representatives ofCD Builders. 1. Use rebar support. 2. Clean area in the bottom. 3. For inlet curb add I rebar on the side of the inlet. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must re: our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.