Loading...
ST0502A- LR150423* GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc, 10046 Monroe Drive 0 Dallas, Texas 75229 + (214) 352-5433 a Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 23, 2015 Test Date: February 13, 2015 Client: City of Coppell General Report No.: 96 Project Freeport Parkway Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of 1 Results On February 13, 2015' reinforcing steel was observed at the following locations: Bridge - Stage 2 The following discrepancies were noted and called to the attention of Aieiandro, a representative ofBernall Construction. 1) Fixed bar S2 2) Missing bar "T" connection with Stage 1 The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick O Dell- City of Coppell Via E -Mail: R O Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpine,com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: ' rF All tetters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants Inc.The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.