Loading...
ST0502A- LR150424G • GEOTECHNICAL ENGINEERING .l E • ENVIRONMENTAL CONSULTING GEE Consultants, Inc. 111 # CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive 0 Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: April 16, 2015 Client: City of Coppell Test Date: April 24, 2015 General Report No.: 118 Project Freeport Parkway Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page I of I Results On April 24, 2015 reffiforcing steel was observed at the following locations: Inlet curb STA 13+70 Decel lane North bound STA 8+20 to 9+00 The following discrepancies were noted and called to the attention of Antonio, a representative of CD Builders 1) Clean connection with existing concrete. 2) Cover concrete after the pour. The above discrepancies were corrected as noted. Technician: CP cc: Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approvarof GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. • GEOTECHNICAL ENGINEERING 10046 Monroe Drive • AL CONSULTING UCTION MAI"ERIALSTESTING Dallas, Texas 75229 GEE ConsulJl_ tants, Inc. • (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX: OBSERVATION Report Date: April 28, 2015 Date Concrete Placed: April 16, 2015 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 173 Contractor: CD Builders Inc. Project No.: 214-0144 Concrete Supplier and Plant: Argos #110 Location of Placement: Bridge Rail Trail MATERIALS Source / Description SSD Batch Wts. OBSERVATION DATA (Lbs/CuYd) Date Tested Mix Number: 1083 Time Sample Batched: 1:27 PM Cement: 7 Time Sampled: 2:15 PM Fly Ash: Sample Location: Bridge Rail Trail - Bridge Coarse Aggregate: 5/14/15 Wall (North Bound) 200'N. Intermediate Aggregate: 6.0 From Bridge Approach Fine Aggregate: • (Approx 15' Long) FPP 679 Truck / Ticket No: 7007/01600663 Admixtures: Temperature: FPP 680 1 H Ambient Range: 84 OF 2 Concrete Range: 78 OF Added Water: 0 Slump Range (inches): 5.0 Weather Conditions: Clear Time Started: 1:00 PM Time Completed: 4:00 PM Sample Air Content (%): 3.2 Total Cubic Yards Placed: 6 Required Strength (I.hs_An.in.): 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks FPP 677 7 4/23/15 124,400+ 4,400+ FPP 678 28 5/14/15 6.0 FPP 679 28 5/14/15 FPP 680 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: RA ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: None cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. Michael Garza - City of Coppell, Phone„ 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague,'' Nall & Perkins., Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: .% " All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.