Loading...
ST0502A- LR150505G1- GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E CONSTRUCTION MATERIALS TESTING GEE ConsultanA. ts, Inc. 10046 Monroe Drive a Dallas, Texas 75229 0 (214) 352-5433 9 Fax (214) 352-6972 Report Date: May 5, 2015 Date Concrete Placed: April 24, 2015 Standard 6"x12'" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 180 Contractor: CD Builders Inc. Project No.: 214-0144 Concrete Supplier and Plant: Argos #110 Location of Placement: Inlet Curb MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1273 Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Tine Aggregate: Admixtures: 1 2 Added Water: 0 Specimen Number FPP 693 FPP 694 FPP 695 FPP 696 Measured Slump (in.) 4.0 Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: 7:22 AM 8:0 AM Inlet Curb STA. 13+70; Decel Lane North Bound STA. 8+20 to 9+00 1038 /1604387 65 OF 72 OF 4.0 Sunny 7:00 AM 12:15 PM 3.4 10 3600 Age Date Total Load Compressive Strength Remarks (Days) Tested (Lbs.) (Lbs./Sq.ln.) 7 5/1/15 126,160 4,460 28 5/22/15 28 5/22/15 H Hold Test Methods Utilized Fracture Regular _ ASTM C-31, C-39, C-143 (Unless Noted Otherwise Remarks and/or Distribution:- None Cylinders Made By: CP cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael. Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins; Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed b name must All letters and reports s 7e for .thour letters and reports client apply only to the saare addressed ted andand or shall lrservedot eandrareunoa necessarily indicatut me run ive of he quantifiesoval 01 GEE ptparentlyTidentical orhe use of sim lar products. receive our prior written pp G1- GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972 Report Date: May 5, 2015 Date Concrete Placed: April 27, 2015 Standard 6"xl2" Cylinders Client: City Of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 181 Contractor: CD Builders Inc. Project No.: 214-0144 Concrete Supplier and Plant: Argos #110 Location of Placement: Pavement Median Crossing STA. 12+10 to 12+70 MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1273 Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: Added Water: Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: Reouired Strength (Lbs./sci.in.) 7:20 AM 8:25 AM. Pavement Median Crossing STA. 12+10 to 12+70 5046/ 1604785 64 OF 78 OF 3.0 Cloudy 7:00 AM 11:00 AM 4.0 10 3600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 697 7 5/4/15 124,960 4,420 FPP 698 28 5/25/15 FPP 699 3.0 28 5/25/15 FPP 700 H Hold Test Methods Utilized Fracture Regular Cylinders Made By: CP ASTM C-31, C-39, C;-143 (unless Noted Otherwise) Remarks and/or Distribution:- None cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpine.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@edbuilderspr.com GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: 1� All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval or GEE Consultants Inc The use of ur name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.